S/0009/17/DC & S/2732/16/DC and 15/2317/COND3 & 15/2317/COND20: Land at Chesterton Sidings, Cowley Road, Cambridge (Station development)
AgreedPlanning1 paper
Joint Development Control Committee - Cambridge Fringes agreed this item on Wednesday 15 March 2017. Below is the council's own wording, with the papers it was decided on.
Resolved (unanimously) to: a) Condition 3 of S/3120/15/FL – Discharge b) Condition 3 of 15/2317/FUL – Discharge c) Condition 7 of S/3102/15/FL – Part discharge in relation to information and way finding signs 6 and 7 as shown on the following plans: 5134906-RLS-CIS-HWY-00500 REV C02 513906-RLS-CIS-HWY-00501 REV C02 513906-RLS-CIS-HWY-00509 REVB02 d) Condition 30 of S/3102/15/FL - Part discharge except for details that relate specifically to the crossing of the busway as detailed below: Appendix C Appendix E e) Condition 20 of 15/2317/FUL – Part discharge except for details that related specifically to the crossing of the busway as detailed below: Appendix C Appendix E f) Condition 35 of S/3102/15/FL – Agree g) That authority be delegated to Joint Director for Planning and Economic Growth for Cambridge and South Cambridgeshire for condition 7 and 30 of S3102/15/FL and condition 20 of 15/2317/FUL for agreement following acceptable positioning and design of the crossing for the busway.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Date Received 3 January 2017 (S/0009/17/DC and Officer Andrew Fillmore 15/2317/COND20) 18 October 2016 (S/2732/16/DC and 15/2317/COND3)
Target Date 14 December 2016 (S/2732/16/DC and 15/2317/COND3) 2 March 2017 (S/0009/DC and 15/2317/COND20)
Parish Milton Parish and Chesterton Ward
Site Land at Chesterton Sidings, Cowley Road, Cambridge, CB29LD
Proposal Discharge of Condition 3 of S/3102/FL and Condition 3 of 15/2317/FUL – External surface materials. Discharge of Condition 7 of S/3102/FL – Signage Strategy Discharge of Condition 27 of S/3102/15 and Condition 20 of 15/2317/FUL - Traffic Management Plan Discharge of Condition 35 of S/3102/FL – Emergency Procedure Strategy
Applicant Network Rail Infrastructure Limited
Application Type Discharge of condition Departure: No
The above application has been reported to the Planning Committee for determination by Members in accordance with the resolution of the Joint Development Control Committee for planning applications S/3102/15/FL (SCDC) and 15/2317/FUL (CCiC).
Contents
Page Background and Proposal 2 Samples to be used in the construction of external surfaces 5 Signage Strategy 7 Traffic Management Plan 8 Emergency Procedure Strategy 9 Recommendation 11
SUMMARY The application seeks 1 to discharge conditions relating to the material samples to be used in the construction of external surfaces, provision of a detailed signage strategy, traffic management plan and an emergency procedure strategy for access to the station for disabled people in the event of mechanical fault or failure of the lifts provided at each platform. RECOMMENDATION Condition 3 of S/3120/15/FL – Discharge
Condition 3 of 15/2317/FUL – Discharge
Condition 7 of S/3102/15/FL – Part Discharge i
Condition 27 of S/3102/15/FL Part Agree
Condition 20 of 15/2317/FUL – Part Agree
Condition 35 of S/3102/15/FL – Agree
That authority be delegated to Joint Director for Planning and Economic Growth for Cambridge and South Cambridgeshire for condition 7 and 27 of S/3102/15/FL and Condition 20 of 15/2317/FUL for agreement following acceptable positioning and design of the crossing for the busway.
1.0BACKGROUND AND PROPOSAL
1.1Members of the Joint Development Control Committee (JDCC) resolved to grant planning consent for a new 450sqm station building and associated infrastructure, including 450 space rail station car park, 1000 cycle park, main vehicular access road to the station and creation of access route to the Guided Busway into the site along with alignment of the former St Ives Branch Line under applications S/3102/15/FL (SCDC) and 15/2317/FUL (CCiC) subject to conditions and completion of a S106 legal agreement. Following a resolution to approve permission was granted on 26th September 2016 following the completion of the Section 106 Agreement.
1.2As is shown in section 2 below, there have been three full applications approved for the site. The County Council was the applicant for the first of these followed by two applications from Network Rail. Under the two Network Rail applications the main changes to the County Council scheme were a decrease in the platform length, a decrease in the canopies length and the relocation of the car park to be adjacent to the railway tracks.
1.3Works have commenced and are well advanced on site, the planned opening for the station is May this year. In a letter dated 3rd February 2017 the applicants have informed the Council that the project is a fixed cost publically funded scheme. In addition the scheme has a fixed programme due to its opening in May. Network Rail have confirmed that there are only two opportunities in a year to open a new station due to timetabling implications.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Development Control Committee - Cambridge Fringes at Cambridge and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.