Joint Development Control Committee - Cambridge Fringes decided this item on Wednesday 18 October 2017. Below is the council's own wording, with the papers it was decided on.
Resolved by 10 votes to 0 (SCDC Councillors did not vote) to: grant the application for planning permission in accordance with the officer recommendation, for the reasons set out in the officer report, and subject to the conditions recommended by the officers.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Report to Joint Development Control Committee - Cambridge Fringes
JOINT DEVELOPMENT CONTROL COMMITTEE (CAMBRIDGE FRINGE SITES)
Report by: Joint Director of Planning and Economic Development
Date: 18th October 2017
Application 17/1358/FUL Agenda Item Number Date Received 10 August 2017 Officer Aaron Coe Target Date 18 October 2017
Parishes/Wards Trumpington
Site The AURA marketing suite, Northrop Road, Trumpington, Cambridge, Cambridgeshire.
Proposal Retention of existing marketing suite at Great Kneighton (Clay Farm) for a further period of three years.
Applicant Countryside Properties Ltd
Recommendation Approval Application Type Full Departure: No
The above application(s) have been reported to the Planning Committee for determination by Members in accordance with the Scheme of Delegation for the Joint Development Control Committee for the Cambridge Fringes
SUMMARY The development accords with the Development Plan for the following reasons: The marketing suite already exists and there are no amendments proposed to the existing layout of the temporary building. The objections from local residents for the retention of the marketing suite for an additional 3 years are understood. However, it would not be practical for the developer to relocate the marketing suite given the close proximity of its existing location to the properties that remain to be marketed.
RECOMMENDATION APPROVAL APPENDICES Ref Title 1 Site plan 2 Wider Site Plan
SITE DESCRIPTION/AREA CONTEXT
1.0The application site is within Parcel 1B of the Countryside approved reserved matters site for 229 dwellings. The site is located at the Northern Arrival Square, adjacent to the junction of the Spine Road (Lime Avenue) and Long Road.
1.1The marketing suite is located within the site boundary of the reserved matters application site for parcels 1B, 2 and 5 of Clay Farm. All of these parcels are now completed.
THE PROPOSAL
2.0The planning application seeks approval for the retention of a temporary marketing suite building for an additional 3 years for the purpose of continuing to market properties which have been constructed within the Aura development of Clay Farm.
2.1The marketing suite is a two storey building with a reception area and apartment showroom on the ground floor and a meeting room and support facilities on the first floor. The marketing suite consists of materials including a white render and anodised aluminium, with lettering applied externally advertising the development with LED lighting.
2.2The development includes six car parking spaces, including one disabled space. They are located adjacent to the building and are used by staff and visitors. There are four cycle parking spaces within close proximity to the entrance.
2.3There are four trees situated nearby the marketing suits and these align with those along the Spine Road. Additional trees are proposed to be planted when the marketing suite is closed and removed.
2.4The application is accompanied by the following supporting information:
1. Design & Access Statement
2. Drawings, elevations and plans
3. Drainage and landscaping details 3.0 SITE HISTORY
Description Reference Outcome
07/0620/OUT Residential development of up to 2,300 A/C new mixed-tenure dwellings and accompanying provision of community facilities; sports and recreation facilities and landscaped open spaces including 49ha. Of public open space in the green corridor, retail (A1), food and drink uses (A3, A4, A5), financial and professional services (A2), non- residential institutions (D1), a nursery (D1), alternative health treatments (D1); provision for education facilities; and all related infrastructure including; all roads and associated infrastructure, alternative locations for Cambridgeshire Guided Bus stops, alternative location for CGB Landscape Ecological Mitigation Area, attenuation ponds including alternative location for Addenbrooke’s Access Road pond, cycleways, footways and crossings of Hobson’s Brook.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Development Control Committee - Cambridge Fringes at Cambridge and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.