RESOLVED That – a) The signage in the Harbour to the toilets be improved. b) Both conventional and prefabricated toilet blocks be investigated and that full costings be reported to a future meeting of the Harbour Board. ... view the full minutes text for item 564.
Word for word from the decision Canterbury published for this meeting.Source: democracy.canterbury.gov.uk
Director/Head of Service: Head of Property Services
Decision Issues: These matters are within the authority of the Board
Decision type: Non-key
Classification: This report is open to the public.
CCC Ward(s): Harbour
Summary: There have been comments, both within the consultation on the draft strategic plan and elsewhere, that there are insufficient public toilets within the harbour or nearby. This report outlines a proposal for the Board to provide additional toilets for people visiting the harbour.
To Consider: Whether to provide and fund additional public toilets in the harbour and their ongoing maintenance.
Next stage in process If the proposal is supported to finalise a specification and invite tenders.
SUPPORTING INFORMATION
1. Introduction
Over the past ten years or so the number of daily visitors to the harbour has increased, particularly during the summer months when there are more regular activities. There are two major events during the year, with smaller events on an occasional basis, and it has become clear that the existing public toilets at the eastern end of the harbour are not able to cope on such occasions. When the Dead Man’s Corner project is completed there will be a further reason for people to visit and linger at the harbour.
2. Detail
As the harbour has developed and a wider variety of businesses and attractions have become established the number of visitors has increased. The harbour is busy throughout the year but particularly during the summer months at weekends and when there are events such as the oyster festival and the open day. During the consultation on the draft strategic plan several people commented that the public toilets best placed to serve the harbour were not adequate at busy times. Some businesses within the harbour have also been faced with non-customers requesting to use their toilets and even, on occasions, using a yard at the rear of a building. There are public toilets in Harbour Street, provided and maintained by the council. The next nearest public toilets are on the promenade at the end of Beach Walk (approx 350 metres away) and at the Horsebridge (approx 500 metres). The council has no plans to provide additional public toilets within or close to the harbour.
In order to address the perceived lack of toilet facilities the Harbour Board could consider providing additional facilities itself. As the closest existing toilets front Harbour Street towards the eastern end of the harbour it would seem logical to locate new toilets at the western end. There is a potential site in the public car park next to the RNLI building (shown on the preliminary drawing attached to this report) and while the use of this would lose 2-3 parking spaces (and income totalling approx £5,000 per year) this could be outweighed by the benefits to visitors of additional toilets provided to a modern standard.
So that board members can have some idea of the likely costs two alternative approaches have been evaluated on a limited basis:
a) Conventional construction –
The estimated cost of designing and constructing a toilet block along the lines illustrated on the drawing is approximately £50,000. This is a guide price only because the ultimate cost will depend on the exact specification of the building and the equipment within it. Running costs will also depend on exactly what is provided.
b) Pre-fabricated building –
The illustration attached to the report shows a block of four cubicles supplied using a pre-constructed system that allows them simply to be lifted on to a pre-prepared concrete base. The total cost of this kind of unit together with the base is approximately £100,000. The cost of a two-cubicle unit is estimated to be approximately £65,000. The annual running cost of similar toilets (also illustrated) installed in Canterbury in 2009 is £7,200. This includes water, electricity, cleaning, business rates, etc.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Election of a Chair for 2026/27RESOLVED that: Councillor Chris Cornell be Chair for 2026/2027. A recorded vote was taken as follows: For (7): Counci...
Annual Harbour Outturn Report 25/26RESOLVED that: The report was NOTED. A recorded vote was taken as follows: For: (8) Councillors Chris Cornell, Dixey,...
Exclusion of the press and publicRESOLVED by general assent that under Section 100(A)(4) of the Local Government Act 1972, the press and public be exc...
Exclusion of the press and publicRESOLVED by general assent that under Section 100(A)(4) of the Local Government Act 1972, the press and public be exc...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies