Item45
Resolved
RESOLVED That for the reasons set out in the report and in the update report to Board (as corrected orally to refer to ‘volume’ not ‘area’), the application be referred to the Secretary of State under The Town and Country Planning (Consultation) (England) Direction 2009 [as Green Belt Development] with a recommendation that the application be approved subject to the following: 1. Standard conditions 2. No operation of the WTS until all landfilling ceases (not including restoration activities ) 3. Cessation of WTS by 31st December 2027 4. Restricted overall throughput of 60,000tpa 5. Restrictions on processing of waste 6. All waste unloading/handling to take place within the building 7. Roller shutter doors to remain closed, aside from when in use by vehicles 8. Hours of working 9. Scheme for the control on dust 10. Restrictions on highway movements, including no more than 3 vehicles before 10am on Sundays 11. Access arrangements 12. Sheeting of vehicles 13. Submission of details of building materials 14. Noise mitigation scheme 15. Details of piling activities 16. Set noise levels 17. Scheme of noise monitoring 18. Odour mitigation scheme 19. Scheme for foul/surface water disposal 20. Control of water pollution 21. Details of lighting and restrictions on its use 22. Badger survey 23. Breeding bird survey and bird/bat mitigation 24. Safeguarding of retained habitat during construction 25. Construction environmental management plan 26. Landscape scheme (whilst building in operation) 27. Final restoration scheme (once building is removed) If the application is not determined by the Secretary of State, the Planning and Place Shaping Manager is given delegated authority in consultation with the Chairman of the Strategic Planning Board to approve it subject to the conditions as specified.
Word for word from the decision Cheshire East published for this meeting.
Source: moderngov.cheshireeast.gov.uk