Resolved
RESOLVED That for the reasons set out in the report and in the update to Board, the application be approved subject to the completion of a Section 106 Agreement securing the following:- • 10% affordable housing (20 dwellings), on a tenure split of 75% intermediate tenure and 25% rented, (either social rented dwellings let at target rents or affordable rented dwellings let at no more than 80% of market rents) • Transfer of any rented affordable units to a Housing Association • Affordable house scheme to be submitted at reserved matters • Affordable homes to be let or sold to people who are in housing need and have a local connection. (The local connection criteria used in the agreement to match the Councils allocations policy.) • Provision of play area / five-a-side pitch • Provision of detailed specification for play area to incorporate : o 8 pieces of play equipment should be provided. o 5 a side pitch (600sqm) o NEAP (2,620sqm) o Durable retaining walls – concrete or brick o porous wet pour safer surfacing. o concrete steps to the bank o the slide to be set in concrete o Two bins with one being provided on each level. o Metal bow top railings are required; pedestrian access gates in the same style but a contrasting colour to the railings. o Gate to be outward opening, with rubber caps on the clapping side and have a mechanical self-closing mechanism. o NEAP to provide seating; bicycle parking and appropriate signage. • Provision for a management company to maintain the on-site amenity space / play area • 10 year management plan for landscaping • Education Contribution of £292, 850. • Commuted sum of £1500 to barn owl group • Highways Contributions: o Maw Green Road Signage Scheme - £20,000 o Crewe Green Roundabout - £60,000 o Sydney Road bridge - £ 1,082,000 o Public Transport Contribution - £12,000 And subject to the following conditions:- 1. Reserved matters for each phase. 2. Reserved Matters in 18 months. 3. Drawing numbers 4. No approval of the submitted indicative layout. 5. Nesting birds 6 Details of bat and bird nest boxes. 7. Open space/nature conservation areas. 8. Ponds 9. Updated wildlife mitigation/compensation proposals for that phase 10. Updated protected species survey report for that phase. 11. contamination 12. Removal of pd rights. 13. Flood Risk Assessment. 14. Surface water run-off 15. Surface water drainage system 16. Flood mitigation measures 17. Overland flow 18. Houses to face waterfronts and footpaths. 19. Green open spaces adjacent to any watercourses and ponds 20. Sustainable Urban Drainage Scheme (SUDS) 21. Drained on a total separate system 22. Only clean surface water soakaway . 23 Scheme to limit the surface water run-off 24 Scheme to manage the risk of 25 Hours of construction 26 Piling 27 Floor floating 28 Floor floating operations 29 External lighting 30 Noise mitigation scheme 31 Environmental Management Plan (EMP) 32 Archaeological mitigation 33 Energy saving features 34 ... view the full minutes text for item 102.