Item38
Resolved
That the application be delegated to the Head of Planning (Regulation), in consultation with the Chairman, to approve subject to further discussion on the s106 requirements in respect of ecology and the possibility of increasing affordable housing provision from 10% and withdrawal of holding objection from Sport England. The s106 to include: · £1.2m for offsite highways improvement works to the Flowerpot junction · sport pitch contribution of £225,000 to be spent at the Congleton Road Playing pitches · public open space provision in accordance with policy and long term maintenance · long term ecological management plan for the woodland (including the ancient woodland) and wildlife sites and long term maintenance · provision and transfer of serviced school site at no cost And subject to the following conditions:- 1. Commencement of development (3 years) or 2 from date of approval of reserved matters 2. Reserved matters to be approved 3 Phasing plan, including highways works to be agreed 3. Approved Plans 4. Materials 5. Landscaping 6. Implementation of landscaping 7. Tree/Hedgerow Protection Measures 8. Arboricultural Impact Assessment in accordance with Section 5 of BS5837:2012 Trees in Relation to Design, Demolition and Construction – Recommendations which shall include a Tree Protection Scheme 9. Construction and Environmental Management Plan to be submitted prior to commencement, to include dust control measures. 10. Submission of a detailed acoustic assessment with mitigation required with reserved matters. 11. Hours of deliveries to be agreed 12. Odour Management Plan 13. Air pollution damage cost calculation and associated mitigation works. 14. Electric Vehicle Infrastructure 15. Approval of lighting associated with the leisure and commercial uses. 16. Submission of a post demolition Phase II ground contamination and risk assessment together with a remediation report. 17. Control of soils brought onto site. 18. Measures to address contamination should it be unexpectedly be found during works. 19. Submission of a Ecological mitigation and Management Plan for the Woodland (including the Ancient Woodland) and Local Wildlife Site. 20. Submission of an updated Badger Survey as part of and reserved matters application. 21. Updated reptile survey as part of any Reserved Matters 22. Updated GCN mitigation strategy as part of and reserved matters application. 23. Management of and improvements to the PROW 24. Travel Plan to be submitted prior to occupation of the first dwelling. 25. Programme of archaeological work 26. Approval of levels. 27. Submission of a Flood Risk Assessment. 28. Drainage strategy/design in accordance with the appropriate method of surface water drainage chosen. 29. Foul and surface water drained on separate systems. 30. Cycle storage 31. Bin stores 32. Prior to the occupation of either A: 220 houses and 4000 Sqm of food retail or B: 4000 Sqm food retail and 16,500 Sq.m employment The full link road shall be implemented 33. Prior to the occupation of 200 units, the Moss Lane/Signal ... view the full minutes text for item 38.
Word for word from the decision Cheshire East published for this meeting.
Source: moderngov.cheshireeast.gov.uk