Resolved
RESOLVED That for the reasons set out in the report the application be approved subject to the following conditions:- 1.Commencement 2.Plans 3.Materials as submitted 4.Prior to occupation the provision of a frontage footway on Warmingham Lane as indicated on Dwg VN70839-102 to be implemented 5.Removal of permitted development rights – means of enclosure forward of building line 6.Removal of permitted development rights for extension for the 3 no affordable dwellings 7.The developer shall agree with the LPA an Environmental and Construction Management Plan (EMP) with respect to the construction phase of the development. The EMP shall identify all potential dust sources and outline suitable mitigation/ pile driving methods and hours of pile driving / storage of materials/car parking forworkers /compound. The plan shall be implemented and enforced throughout the construction phase. 8.Imported soil 9.Unforeseen contamination 10.Development to be undertaken in accordance with Flood Risk Assessment (FRA) (3870/FRA/Final/v1.2/2018-09-03, v.1.2 by Weetwood ) dated September 2018 11.No development shall take place until an overall detailed strategy / design limiting the surface water runoff generated by the proposed development, associated management / maintenance plan and managing any overland flow routes for the site has been submitted to and approved in writing by the Local Planning Authority. The drainage design must also include information about the designs storm period and intensity (1 in 30& 1 in 100 (+% allowance for Climate Change)) & any temporary storage facilities included, to ensure adequate drainage is implemented on site. 12.Existing and proposed levels, inc FFL 13.Electric vehicle charging 14.Raft/ ring beam Foundations as detailed in Wardell Armstrong Drawing No. LE13532-005. 15..Tree and hedge protection – non standard 16.Arboricultural Method Statement 17.Tree Retention 18.Drainage/services layout for trees 19.Non –standard construction trees 20.Residential travel packs 21.Retention and protection of hedgerows. 22.Scheme to link site with adjoining development of Glebe Farm allocation 23.Phasing of development to form part of 1st reserved matters 24.Superfast broadband provision 25.Hedgehog Gaps 26.Bird nesting season 27.Updated badger survey 28 Features for breeding birds/bats 29.Strategy for the safeguarding and enhancement of invertebrate habitat. 30.Bike store for flats 31.Environment/highways management plan for construction phase 32.Newt mitigation scheme to be submitted In the event of any changes being needed to the wording of the Board’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Management has delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Board’s decision. If the application is subject to an appeal approval is given to enter into a S106 Agreement with the following Heads of Terms:- S106 Amount Triggers Affordable housing including Overage ... view the full minutes text for item 73.