Resolved
RESOLVED That for the reasons set out in the report and in the written update to the Board the application be approved subject to the completion of a d eed of variation of the Section 106 agreement attached to permission 8/08/0375/CPO to replicate the requirements of the legal agreement to the permission. And subject to the following conditions:- Timescales for commencement and notification of commencement Approved plans and documents Copy of approved plans to be made available for inspection on site Timescales for cessation and restoration of the site Hours of operation for general mineral activities Hours of operation for noise generative activities Hours of operation for the processing plant Hours of operation for loading, unloading and movements of HGVs Vehicles arriving and leaving the site restricted to using the existing access only, and maintenance of a notice advising drivers to turn right out of the site Wheel cleaning and no deposit of material on the highway Sheeting of vehicles Restrictions on HGV numbers and timing of movements Records of vehicle movements Protection of nesting birds Advance notice of soil stripping Soil to be stripped prior to being used for extraction or associated activities and controls over the use of heavy machinery on soils Soil handling No export of soils without prior approval of the local planning authority Seeding of all soil mounds Weed control 3m height control on soil mounds No importation of waste Surveys prior to any ponds being disturbed and where necessary scheme of translocation of species Implementation of mitigation identified in the ecological impact assessment Water levels of retained ponds to be monitored throughout the life of the site Mounds to be located away from existing trees and hedgerows Limits to depth of extraction Limits on the amount of vegetation to be cleared in advance of sand extraction Colour for any new buildings, plant or machinery on site to match those on site Noise levels for normal mineral operations Noise levels for noise generative activities and limits on timescales of these activities Application of best practicable means for controlling noise on site Noise levels from processing plant Best practicable means for suppression of dust Use of water bowser Monitoring of stream flows within Dairy Brook and Loach Brook Quarterly monitoring of groundwater levels Extension of the groundwater monitoring scheme to include the extended extraction area and increase in extraction depth No dewatering of the site below 81m AOD Compliance with the mitigation in the Flood Risk Assessment and Hydrological Impact Assessment Monitoring of water quality Surface water from plant site to be discharged into the settlement lagoon prior to discharge into a watercourse Procedures for storage of contaminants No contaminants allowed to enter any watercourse No open fires All landscape works and planted areas to be maintained and losses replaced No disturbance to any existing vegetation, waterbodies or watercourses within the site outside of the ... view the full minutes text for item 65.