Item17
Resolved
For the reasons set out in the report and update report, the application be APPROVED as recommended, subject, referral to the Secretary of State, a S106 agreement to secure: • Local Employment Agreement – Construction • Local Employment Agreement – Operation • Apprenticeships Plan – Construction Phase • Apprenticeships Plan – End-user Phase • Local Procurement Agreement – Construction • Local Procurement Agreement – Operation and the following conditions: 1. Time period – 3 years 2. Development to be carried out in accordance with approved plans 3. Details of materials to be submitted 4. Sample panel of brickwork to be submitted 5. Details of all windows and doors of farmhouse, eastern and western barn to be submitted 6. Detailed repair schedule for works to the farmhouse and eastern barn to be submitted 7. Timetable for the construction of the cycle store (western barn) to be submitted 8. Methodology/strategy for the dismantling of the western barn and for the re-use of the salvaged brick work within the new cycle store to be submitted 9. Lighting scheme to be submitted 10. Updated badger survey prior to commencement. 11. Safeguarding of nesting birds – details to be submitted 12. Submission and implementation of a Construction Environmental Management Plan (CEMP) informed by the recommendations of the ES ecology chapter. 13. Submission and implementation of Biodiversity Net Gain measures and 30 years (habitat) management informed by the submitted biodiversity metric. 14. Incorporation of ecological features (Bat and bird boxes etc.) 15. Scheme to install underground tanks to be submitted 16. Scheme to dispose of surface water to be submitted 17. Sustainable drainage management and maintenance plan to be submitted 18. plan for the lifetime of the development 19. Retention of existing trees 20. Tree protection and special construction measures to be submitted / implemented 21. Arboricultural method statement to be submitted 22. Landscaping scheme to be submitted 23. Landscaping implementation 24. Boundary treatment details to be submitted 25. Details of earthworks, including proposed grading and mounding of land to be submitted 26. Landscape management plan to be submitted 27. Full design and construction details of highway improvement works to be submitted 28. Installation of fence along the boundary of the application site alongside the M56 and associated slip road 29. No drainage from the proposed development shall connect into the motorway drainage system / or run-off onto M56 motorway 30. Construction Management Plan to be submitted (highways) 31. Implementation of highway improvement works and works to Yarwood Heath Lane 32. Submission of updated travel plan 33. Provision of car and cycle parking 34. SuDS design details to be submitted (aircraft safety) 35. Bird Hazard Management Plan to be submitted (aircraft safety) 36. ... view the full minutes text for item 17.
Word for word from the decision Cheshire East published for this meeting.
Source: moderngov.cheshireeast.gov.uk