Resolved
For the reasons set out in the report, and the update report, the application be APPROVED as recommended, subject to the signing of a Section 106 Agreement and the following conditions: 1. Standard 3 year consent 2. Approved Plans 3. Materials 4. Landscaping 5. Implementation of landscaping 6. Submission of Landscape and Ecology Management Plan 7. Tree and hedgerow protection and special construction measures as identified in the latest AIA/AMS 8. No Dig - Non Standard for areas involving hard surfacing adjacent to retained trees 9. Site Supervision – Non Standard following recommendations of AIA/AMS 10. Noise mitigation in accordance with the acoustic report 11. Electric Vehicle Infrastructure 12. Low Emissions Boilers 13. Submission of a Contaminated Land Phase II investigation. 14. Submission and approval of a Verification report 15. Control over imported soils 16. Requirement to inform LPA if unexpected contamination found 17. Submission of Construction and Environmental Management Plan to include hours of construction 18. 10% renewable provision 19. No dewatering to take place within 66m of the Field at Hulme Walfield Local Wildlife Site. 20. Fencing to be erected on site prior to commencement of development in accordance with submitted plans. 21. Proposals for the interpretation of the retained Field at Hulme Walfield Local Wildlife Site and the provision and maintenance of dog waste bags to be submitted and agreed. 22. Submission and implementation of a CEMP including measures to safeguard all potentially affected Local Wildlife Sites identified in the ES. 23. Implementation of Great Crested Newt Reasonable Avoidance Measures. 24. Updated badger survey and mitigation method statement to be submitted prior to commencement of development. 25. Submission of wildlife friendly lighting scheme designed to safeguard bat foraging and commuting habitat and the retained Local Wildlife Site. 26. Safeguarding of nesting birds. 27. Submission and implementation of a habitat creation method statement, 30 year habitat and monitoring plan to deliver the BNG in the submitted BNG Report including control of non-native invasive species. 28. Strategy for the incorporation of features to enhance the biodiversity value of the proposed development. 29. Archaeological programme of works 30. Scheme of appropriate surface water drainage 31. Detailed design of surface water drainage 32. The development shall be carried out in accordance with the submitted Flood Risk Assessment 33. Finished floor levels 34. Details of Emergency Access onto Giantswood Lane to be submitted and approved 35. Street lighting scheme for Barn Road 36. Detailed design of the footpath/cycleways through the site to be submitted and approved 37. Details of the stopping up of the stub farm access from Giantswood Lane to be agreed (Grampian condition as off site) 38. Submission of a Public Right of Way Management Plan 39. Detailed design of play areas And the additional condition: 40. Jodrell Bank submission and approval of ... view the full minutes text for item 36.