Strategic Planning Board, Wednesday 28 May 2025 at 10.30am

24/4242/FUL - Full planning permission for the erection of a residential development (use class C3); public open space; green infrastructure; landscaping; entrance feature wall, access and associated infrastructure on Land Off Peter De Stapleigh Way, Stapeley

Approved Planning 3 papers

Strategic Planning Board approved this item on Wednesday 28 May 2025. Below is the council's own wording, with the papers it was decided on.

Item7

Resolved

For the reasons set out in the report, and the update report, the application be APPROVED , as RECOMMENDED , subject to a S106 Agreement to secure: S106 Amount Trigger Education (primary/secondary/SEN) £184,888 50% prior to Commencement of a dwelling, then 50% Prior to occupation 20 th dwelling (or 50% percentile dwelling) Affordable Housing 30% (tenure split of 8 rented units and 4intermediate housing units ). Not more than of 50% of open market dwellings (sale/rent) shall be occupied until all affordable units within have completed and made ready for immediate occupation and use. Arrangements for transfer to management company of all areas of planting /landscaping, POS/incidental open space Childrens play space, allotments/orchards and ecological areas Prior to first occupation of the development Contribution to outdoor sports facilities £56,316 The financial contribution is £1,564 per family dwelling or £782.27 per bed space in apartments (to a maximum of £1,564.54 per apartment). The funds would be required on commencement of development and used in line with the Council’s adopted Playing Pitch and outdoor Sports Strategy. 50% prior to Commencement of a dwelling, then 50% Prior to occupation 20 th dwelling - - NHS Healthcare Financial contribution of £36,160 (£904 per dwelling/ apartment) Calculated on following basis. - Population served by surgery = 7,000 - Equivalent number of dwellings (at an average of 2.3 persons per dwelling) = 3,043 - Total cost of required primary care floorspace = £2,752,367 - Contribution cost per dwelling = £904 Prior to occupation 20 th dwelling - And the following conditions: 1. Commencement of development (3 years) 2. Development in accordance with approved plans 3. Details of facing materials 4. Details of hard surfacing treatments 5. Details of ground levels and finished floor levels 6. Submission of landscaping scheme 7. Implementation of landscaping 8. Details of Boundary treatment 9. Details for the provision of cycle storage and bin storage 10. Submission of Details for design of LAP 11. Submission of details of the main POS to include orchard, play and green gym items, short mown area for informal games, paths and seating. The approved scheme to be implemented in accordance with the approved details before first occupation of the development. 12. Revised drainage strategy to incorporates SUDS measures, subject to their suitability based on detailed ground investigations. 13. Provision of Ultra Low Emission Boilers 14. Implementation of Residents travel plan 15. Contaminated land – soil testing 16. Measures to deal with unexpected contamination 17. Implementation of Construction Environmental Management Plan (CEMP) 18. Implementation of measures to minimise the risk of harm to Hedgehog and Brown Hare during works on site 19. Safeguarding of nesting birds 20. Details of lighting to safeguard bats 21. Provision of ecological enhancement features 22. Submission and implementation of a detailed habitat management plan 23. Removal of Permitted Development Rights (Part 1 Classes A and E) ... view the full minutes text for item 7.
Word for word from the decision Cheshire East published for this meeting. Source: moderngov.cheshireeast.gov.uk

Follow this further

Built from Cheshire East's papers

What the report saysPro

Report to Strategic Planning Board

24/4242/FUL Land Off Peter De Stapleigh Way, Stapeley, Cheshire. Revisions.

No. Revision. Date. By.

A Temorary buffer zone removed 08.04.2024 MY

B Layouts updated 23.04.2024 MY

C Boundaries Amended 24.04.2024 MY

D Layout & Application Boundaries Updated 31.05.2024 MY

E Layout & Application Boundaries Updated 12.06.2024 MY

F Layout & Application Boundaries Updated 24.06.2024 MY on's kins Cron Pub G Edge Red Updated, Scale Changed 08.08.2024 MY Farm H Edge Blue Updated 27.09.2024 MY

Pea 22 J Edge Blue Updated 02.10.2024 MY

r Tre 15 K Edge Blue Updated 08.10.2024 MY

e Fie 15 11 1 to

ld

8 KEY

RU 2

SH ES Site Edge Red

C LO CE PLA Area 16,028m²

SE 1 IS E IR 5 WHIT

5 E EAD CLOS 2 ARROWH

FOXTAIL ROAD 12 Signage 480m² Site Edge Blue

1 22

32 AY ay RY W W BER h TER WIN 21 g ei

46 25

apl 31 st

WIL De er

D FL t Pe 30

OW 6 A5

1 ER 17

CLO 24 2

SE 9 TARO CL OSE 5 1 43 12 54

Way Destapleigh A530 Peter 54 28 18 Way Destapleigh

32 A530 Peter 42 UE VEN L IA A THA

17 N 19

1 8m buffer

8m buffer

2 25

27 12

1 Pond

1 to ATTENUATION POND

BAY LILY ROAD 75m 2 75m 2

8 75m 2

POS Area for 75m

Anwyl Residential 2

Application 75m

(3,275m²) 0 10 20 30 40 50 60 70 80 90 100 2

Ponds SN OW CR SCALE - METRES

9 ES TP POS 22 15 LA CE

NEAP

29 31 1 to 12 37

Anwyl Residential Site 12,273m² Project

Maylands Park, Stapeley, Nantwich Title

Bower Site Location Plan 1:2500 Mattin Unit 23 / 24 Residential Scheme Beechfield House, Winterton Way, Lyme Green , Business Park, Macclesfield SK11 0LP

Telephone 01625-509187 Scale Date Job No Original E-Mail 1:2500@A3 April 2024 architects@ Drawn By Checked 23289 bowermattin-young.co.uk MY . Category CiSfb Element Sequential No Revision Chartered Architects Surveyors L 501 K Disclaimer: Do not scale from this drawing All contractors must visit the site and be responsible for taking and checking dimensions. All construction information should be taken from figured dimensions only.

MAYLANDS PARK , STAPELEY - NANTWICH Any discrepancies between drawings, specifications and site conditions must be brought to the attention of the supervising officer.

This drawing is for planning purposes only. It is not intended to be used for construction purposes. Whilst all reasonable efforts are used to ensure drawings are accurate, Astle Planning and Design Ltd accept no responsibility or liability for any reliance placed on, or use made of, this plan by anyone for purposes other than those stated above.

1:500 0 5 10 15 25m PLANNING LAYOUT MP_140m²

Bp ACCOMMODATION SCHEDULE Proposed Layout Key Bp

Ph Ph

Storey Name

Total No's Bed

Unit

Unit 15

ft²

ft² Red Edge Boundary extracted from Bower Mattin Layout - Gross Site Area - 3.032 acres / 1.22 ha Line Pa

of D 18 Plot Number WH * Edge Pa

Private Housing @ 70% (28) Red Ac Cartmel CART 4 Bed 2.5 7 1552 10864 3 * Stapeley STAP 3 Bed 2 1 1372 1372 OPP

Denote Affordable Housing refer to Charlton B CHAR B 4 Bed 2 2 1314 2628 3 Affordable Housing layout for tenure Bp

Pa Pa Hampton - M4[2] HAMP 4 Bed 2 2 1329 2658 Bp

Bp Marford - M4[2] MARF 4 Bed 2 1 1329 1329 Ac Bp Ainsdale - M4[2] AINS 3 Bed 2 6 1109 6654 Pa Ac Pa Ac Bp Snowdon SNOW 2 Bed 2.5 5 1060 5300 Bin collection point Pa Ac Dodleston B DODL-B 3 Bed 2 2 1056 2112

Ponds Burton BURT 2 Bed 2 Affordable Housing @ 30% (12) 2 756 1512

Maxley - M4[3] MAXL 2 Bed 2 3 866 2598

Cycle storage. Details to be confirmed Maxley MAXL 2 Bed 2 1 866 866 Disley - M4(2) DISL 1 Bed gf 2 4 542 2168 AS STAP DODL B Disley DISL 1 Bed ff 2 4 689 2756 Grand Total: 40 Units 42817 ft² Location of M4[2] compliant house type - 14 No. units (30% 2 2 1 provision) Gross Site Area: 1.23 ha 3.03 ac

DO AS DL Site Statistics:

B 3 P1 SSR 0.07 ha 0.17 ac P1 MAXL

Location of M4[3]2.a compliant house type - 3 No. units (6% 3 provision) POS 0.07 ha 0.18 ac

SN AS OW P2

SN P2

AS 4 Nett Site Area: 1.09 ha 2.69 ac

OW P3

OP Gross Density: 32.60 Un/ha 13.19 Un/ac

SN 5

P OW MP_85m² Existing trees to be retained. Survey provided by client P3 6 Nett Density: 36.79 Un/ha 14.89 Un/ac

SN AS P4

OW P4 Bp Gross Footage:

OP SN 7 3242.18 m²/ha 14122.93 Un/ac

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
24 4242 FUL Key PlansMinutes 17 MB DownloadRead as text
PDF
24-4242-FUL: AnwylMinutes 214 KB Download
PDF
24/4242/FUL: Full planning permission for the erection of a residential development (use class C3); public open space; green infrastructure; landscaping; entrance feature wall, access and associated infrastructure on Land Off Peter De Stapleigh Way, StapeleyMinutes 571 KB Download

At this meeting

Whole meeting

On this subject at Cheshire East

Search all
  1. 24/4242/FUL - Full planning permission for the erection of a residential development (use class C3); public open space; green infrastructure; landscaping; entrance feature wall, access and associated infrastructure on Land Off Peter De Stapleigh Way, StapeleyThis decision
  2. 25/1573/FUL - Full planning application for a residential development including associated access, infrastructure and landscaping. Land off Cumber Lane, WilmslowApproved
  3. 25/2071/FUL - Full planning application for a residential development and the provision of associated access and infrastructure works including roads, drainage infrastructure, car parking, public open space and landscaping. Land at Dean Row Road, WilmslowApproved
  4. 24/4968/FUL - BREEDON HOUSE, EDLESTON ROAD, CREWE CW2 7EA: Full planning application for the remodelling, extension and part change of use of Breeden House and Regency Court, Crewe CW2 7EA to accommodate new residential development with assApproved
  5. 25/3691/FUL - LAND OFF PADGBURY LANE, CONGLETON: Full planning application for residential development for 18 dwellings (Use Class C3), including access, landscaping, parking, servicing and ancillary infrastructureApproved
  6. 25/1469/FUL - LAND AT BOOTHS PARK CHELFORD ROAD, KNUTSFORD: Full application for new access road to serve housing site, including associated landscaping and sustainable drainage worksApproved

More from Cheshire East Strategic Planning Board

All decisions
MeetingDecisionOutcome
16 Sep 2026 Minutes of the Previous MeetingThat the minutes of the meeting held on 22 July 2026 be approved as a correct record and signed by the Chair. Approved Open
16 Sep 2026 25/1573/FUL - Full planning application for a residential development including associated access, infrastructure and landscaping. Land off Cumber Lane, WilmslowThat application 25/1573/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 3-year ti... Approved Open
16 Sep 2026 25/2071/FUL - Full planning application for a residential development and the provision of associated access and infrastructure works including roads, drainage infrastructure, car parking, public open space and landscaping. Land at Dean Row Road, WilmslowThat application 25/2071/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 2-year ti... Approved Open
16 Sep 2026 National Scheme of DelegationThat the Strategic Planning Board Noted the changes introduced by the for Planning Functions that will be implemented... Noted Open
22 Jul 2026 Minutes of the Previous MeetingThat the minutes of the meetings held on 27 May 2026 and 9 June 2026 be approved as correct records. Approved Open