Strategic Planning Board, Tuesday 9 June 2026 at 10.30am

25/3904/OUT - LAND AT MANOR FARM, ALSAGER: Outline application with all matters reserved except for means of access to, but not within, the site for the development of up to 130 dwellings and associated landscaping and infrastructure works

Approved Planning 2 papers

Strategic Planning Board approved this item on Tuesday 9 June 2026. Below is the council's own wording, with the papers it was decided on.

Item15

Resolved

That the application be approved subject to a Section 106 Agreement and conditions as detailed below; S106 Amount Triggers Affordable Housing Affordable Housing - 30% Affordable Provision with a 65% to 35% tenure split between Rented and Intermediate Tenure. In accordance with phasing plan to be submitted. Amenity Green Space and Play Provision On site provision of Open Space and a LEAP and a LAP. Scheme of Management to be submitted and approved Shall be provided prior to the first occupation of 50% of the dwellings on the site. Outdoor Sports Contribution £1,614.79 per family dwelling or £807.39 per bed space in apartments (to a maximum of £1,614.79). To be paid prior to the occupation of the 80 th dwelling Indoor Sports Contribution Number of dwellings x 1.61 = Increase in Population. Increase in Population x 0.427 = Increase in Active Population. Increase in Active Population / 25 = Number of Fitness Stations. Number of Fitness Stations x 6500 = The financial contribution. This sum will be spent at Alsager Leisure Centre. To be paid prior to the occupation of the 80 th dwelling NHS £904 per dwelling towards Cedars medical Centre. To be paid prior to the first occupation of the 80 th dwelling. Highways £100,000 towards a scheme of improvements at the Crewe Road/Sandbach Road North/Sandbach Road South/Lawton Road junction improvements or other highways scheme in the parish of Alsager. To be paid prior to the first occupation of the development. Public Transport Contribution £200,000 to improve public transport provision in Alsager. To be paid prior to the first occupation of the development. Education SEN = (Number of dwellings with more than one bedroom x 0.60 x 0.047) x £85,031.00 To be paid prior to the first occupation of the development. And the following conditions: 1. Standard Outline 1 – Submission of the Reserved Matters within 3 years 2. Standard Outline 2 – Commencement within 3 years of the date of permission or within 2 years of the approval of the last Reserved Matters. 3. Standard Outline 3 4. The Reserved Matters for landscaping shall include: · Replacement tree planting for the trees to be lost as part of this application. · The provision of a LEAP and LAP. · Open Space provision in accordance with SE6. · Footpath connections to the adjacent residential areas. · A scheme of resurfacing of PROW FP3 to form a 2m wide route. The PROW should be set within a 6m wide corridor. 5. Approved Plans 6. At least 30% of the dwellings in housing developments should comply with the requirements of M4(2) Category 2 of the Building Regulations regarding accessible and adaptable dwellings. 7. At least 6% of the dwellings in housing developments should comply with the requirement m4 (3)(2)(a) Category 3 of the Building Regulations regarding wheelchair adaptable ... view the full minutes text for item 15.
Word for word from the decision Cheshire East published for this meeting. Source: moderngov.cheshireeast.gov.uk

Follow this further

Built from Cheshire East's papers

What the report saysPro

Report to Strategic Planning Board

25/3904/OUT Land At Manor Farm, Alsager 378800. 35

Sewage Works

Tank

79.9m

79.2m

Mast

80.0m

Public Recycling HA SS Facility AL L RO AD

Def

83.1m

7 16 9 15 RH

92 85.5m 2m

Pond 1 .2

7 97

15 Mere End Barn Aston Lodge

Mulberry Heath End Farm

15 1 2 House

1 3 Corner Brunel

95 Croft House

22 21 26 25

16 OA KL 30 EY DR IV E

Pond

11 7 Sewage Ppg Sta

SELBOURN E CLOSE

28 m) (u

H th

R Pa

m 2 2 y

1. Bd Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No. 100019279.

d

ELOPMENT ar W

V Dunnock's Fold Farm SEDDON DE 38 35

30 32 31 33 * 35 34 79.8m 36 104 P204-EC AS

36 7 P382-E- 7 CP 7 P382-E- 37 P382-E- 36

2-E-7 P20

P38 AS

7 P382-E- 7 4-IC

37 7 CP P382-E- 38 * P20

37 OPP AS OPP

CP OPPCP CP 4-EC7

38 ASCP OPPCP 38 AS 31 31 32 32

39 AS

33 33 -7

CP 34 34 39 35 P382-E

39 30 OPP

P382-E-7

40 CP 35

40 40 29

Pond 1 AS

28 P237 -E-7 N107 -E-7

41 CP 7

29 CP 28 OPP -EC

28 42 CP 41 AS

P2704

P382-I-7

41 CP 27 43 7 04-IC

42 27 opp

CP 27 OPP

42 43 P2

P38 7 04-IC

45 26 44 CP 43 CP OPP

2-E-7

1 ONYX 11-7 AS

44 OPP

26 P2 -EC

44 * 22 * 24 P204

46 CP 22

45 25 25

53 23 1 OPP

ONYX 11-7

52 24 21 46 47 48 49 50 51 CP 21

7 N107 P382-E- 2-E-7 C7P38 N107 -E-7 1 ONYX 11-7

P237 -E-7 OPP

C7 P204-EC7 P204-EP204-E -E-7 P382 -E-7 P204-EC7 P382-E- 7P237 -E-7 20 CP 1 84 1 72 OPPCP CP 20 CP AS AS CP OPP CP OP AS ASCP OPP CP 23 P CP AS OPP 47 53 53 52 52 51 51 48 50 50 48 49 49

CENT E CRES CHESHIR W

H470---7 W AS

W

19 OPP W

54 ---7

55 56 H456

CP AS SDG2S7

19 CP CP OPP 57 CP W

18 W

AS W

W CP W H403--C

57 27

CP 7 H411--- S7

AS

* 18 AS

SDG2

CP H45411-7 7 ---7

H45411-7 H417

SDG1H 10

58 54 H41611

56 55 17 CP 17 10 CP AS OPP

-7 Y

---7 WA

AS H417

59 61 ELL

16 H411---7

OPP

62 63 CP 16 OW

AS

H588 ---5

59 CP 64 13 AS

13 H408 S7

H588 ---5 60 ---7 MH

H4541 OPP W

P332--D7 SDG2

CP H408 1-7 15 11

15 1 CP 11

13 H579 ---5 ---7 CP ---7

* LIA

60 H470

W H408---7 14 SDG1H CP 10 AS WIL

CP AS CP SDG1H AS 11 H411 ---5

OPP CP AS

61 62 OPPCP P332--D7 12 12 * CP CP

Pond 63 14 OPP 64 W

W AS

Sewer W

CP H454 11-5 ---7

Easeme

H454 11-5

CHESHIRE CRE 9 OPP

OPP H456

SCENT 76 nt

ef 69 76 CP

70 OPP

D 2 CP 68 70 67

CP * CPAS 66 F7

65 H470---7

83.4m CP OPP OPP SSG1

CP 8 AS

W

71 H411 43 H454 11-5

H454 11-5 11-7

CP 8 ---7 AS

CP OPP

OPP H411 W AS CP 77 H416

---7 71 6 SDG2S7

436 W CP H411 69 ---7 * CP 435 CP 7

H45411 68 77

Track -7 CP AS

72 H8

7 ---7

CP H417---7

H45411- 7 H408 ---5 H579 ---5 SDG1

67 43 AS AS H411

OPP

78 274

CP 72 66 274 74 5 65 CP 6 73

75 434 70 P

CP 6 W

W OP

CP F7

H41611

SDG2S H411 ---5

H454 ---7

OPP

W OPP 11-7 SSG1

SDG1H

43 CP H454 OPP

* 11-7 H470

42 78

73 CP 9

CP MAN -7

H577NING 42 4 H486---5 78

AS --H7 OPP 8 24 5 W W 79

WIN 9 43 5 79 E

H486---5 ST OPP B H408 OPP H417---7

W 27 273 H421 ONE SU N CP OPP CP ---7H 43 ESS 273 ST Sewer

--H7 BRAD 408-- LOS

-7 0 AS

43 272 H417GATE Easeme

4 AS CP AS CP H411 3 74 --H7 27 271 75 ---7 3

nt

SSG1 * 1 OSE H8 CP SDG2S7

SDG1 W W CP 433

26 OR CL F7 SE

W AVON OPP McGREG SS G1 3 428 CP DU

27 432 W AS GATE

H456DALE H8 AS

Manor Farm C

CP CP BRAD--H7

H417 CP N CLO

--X7 W AS CP 7 SDG2 H8 SS G1 ---7 4

2 H8 H417

HOLL w

57 429 AS windo NN

INWO 27 * W 430 H486 OD CP ON

No FF

H456---7

43 4 OPP H8 AS

CP ---7 W AS 80 80 H486---5 4 309 SS G1

CKO

AS

26 1 S

CHA OPP OC

26 267 431 CP CP 2 D

RLE CP 268 W MIL --H7

KJAS

80 W LFOR

W OPP S BE W

31 270

6 --X7 x85 .16 NNIO 8 H411

H579 8 308 SDG2S CP H486---5 26 308 x85 .26 H436 WINS N RO KS

W TO WW LAYT --X7 CP AS 0 AD 307 H421 NE H8 JAC

SDG1 26 AS

ON --H7 CP x85 .03

x85 .41 27 -5

H411 9 266 310 CP 307

30 06-E

CP H421 ---5

CP H8

306 GLID OPP FO

SDG2

H454 11-5

MIL --H7 CP 3 W EW W

H8 G1

81 W 3 x85 .53

265 H584 ELL LFOR SDG1 OPP

0 x84.92 -I-5P2

SD

D --H7 9 OPP

30 CP 265 AS x84 .98 x85 .63 H8

CP MILH41

85.00x P

H486 61 -5 06

OP LD

OPP HOLL ---7 265

4 30 85.07x LF 1--H

CP P2

26 CP INW 8 85.00x 85.1 0x x85.8 2

29 OR 7

1 OO 06-E

264 x8 x86.02

CP 30 AS

x85.87 D x85.94 6. SDG1H

CP 29 85.20x 11 D

85.10x 1

3 264 7 81 CH H7P2

CP P341 DEF FORD

77 85.20x x85.24 29 x85.85 AS x84 .93

HADL--D 6 269

26 85.30x 2 263 x85.93 8 WAS

CP H454 11-5

H408 25 RO

81 x85.33 W EY 305

DRUM--H7 -E

x86.0 4 MILLFOR

x84.94 x86.15 263 W 85 .30 x85.44 30 AS P382

x85.93 2

W MOND 9 H411--H7

x 85 .40 47

2 RD

P382 H408 ---5

x 84.95x

P3823 CP DEF FOAR

ARCH-EH7 OPP ARCH-EH7

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
25 3904 OUT Key PlansMinutes 12 MB DownloadRead as text
PDF
25/3904/OUT: LAND AT MANOR FARM, ALSAGER: Outline application with all matters reserved except for means of access to, but not within, the site for the development of up to 130 dwellings and associated landscaping and infrastructure worksMinutes 628 KB Download

At this meeting

Whole meeting
1425/4703/FUL - LEIGHTON HOSPITAL, MIDDLEWICH ROAD, CREWE: Hybrid planning application for: Outline application (all matters reserved, except for access) including demolition of existing buildings;Approved
1525/3904/OUT - LAND AT MANOR FARM, ALSAGER: Outline application with all matters reserved except for means of access to, but not within, the site for the development of up to 130 dwellings and associated landscaping and infrastructure worksThis decision
1625/2977/OUT - LAND OF BROAD LANE, NANTWICH: Outline planning application for the demolition of number 6 Broad Lane and a residential development comprising up to 75no.Refused

On this subject at Cheshire East

Search all
  1. 25/3904/OUT - LAND AT MANOR FARM, ALSAGER: Outline application with all matters reserved except for means of access to, but not within, the site for the development of up to 130 dwellings and associated landscaping and infrastructure worksThis decision
  2. 25/4333/OUT - LAND EAST OF CONGLETON ROAD NORTH, CHURCH LAWTON, ST7 3AX: Outline Planning Application for up to 48 Dwellings, Landscaping and Associated Infrastructure (all matters reserved except for the main site access)Deferred
  3. 25/1859/OUT - LAND OFF LONDON ROAD, HOLMES CHAPEL: Outline planning application, with all matters reserved save for access, for the erection of a residential development with associated green infrastructure (including play areas, informal aRefused
  4. 25/2977/OUT - LAND OF BROAD LANE, NANTWICH: Outline planning application for the demolition of number 6 Broad Lane and a residential development comprising up to 75no.Refused
  5. 25/4090/OUT - LAND AT STATION ROAD, SCHOLAR GREEN ST7 3JW: Outline application including means of access for the erection of up to 8 residential dwellingsApproved
  6. 25/2639/OUT - LAND EAST OF, MIDDLEWICH ROAD, WISTASTON, CREWE: Outline planning permission (with all matters reserved except site access) for residential development (Use Class C2 and C3) and a neighbourhood centre (Use Class E(a-f)/F2/SuiApproved

More from Cheshire East Strategic Planning Board

All decisions
MeetingDecisionOutcome
16 Sep 2026 Minutes of the Previous MeetingThat the minutes of the meeting held on 22 July 2026 be approved as a correct record and signed by the Chair. Approved Open
16 Sep 2026 25/1573/FUL - Full planning application for a residential development including associated access, infrastructure and landscaping. Land off Cumber Lane, WilmslowThat application 25/1573/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 3-year ti... Approved Open
16 Sep 2026 25/2071/FUL - Full planning application for a residential development and the provision of associated access and infrastructure works including roads, drainage infrastructure, car parking, public open space and landscaping. Land at Dean Row Road, WilmslowThat application 25/2071/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 2-year ti... Approved Open
16 Sep 2026 National Scheme of DelegationThat the Strategic Planning Board Noted the changes introduced by the for Planning Functions that will be implemented... Noted Open
22 Jul 2026 Minutes of the Previous MeetingThat the minutes of the meetings held on 27 May 2026 and 9 June 2026 be approved as correct records. Approved Open