It was proposed by Councillor Edgerley, seconded by Councillor Heaton and subsequently RESOLVED to grant full planning permission, subject to Section 106 Agreements and to fully investigate improvements being made to the highway at the junction of Blackburn Road with the A474.
Word for word from the decision Chorley published for this meeting.Source: democracy.chorley.gov.uk
Item A. 1 05/00392/FULMAJ Permit Full Planning Permission 05/00393/FULMAJ Permit Full Planning Permission
Case Officer [name removed] Chorley North East
Location Land Between M61 Motorway And Leeds And Liverpool Canal, Millennium Way, Chorley, Lancashire,
Applicant Bluemantle
Site: The site comprises part of the land between the M61 Motorway and the Leeds and Liverpool Canal to the north of Botany Bay Mill. The northern boundary is the A674 (Millennium Way) from which access is gained from the existing roundabout. The site extends to some 5 hectares in total.
Background: This area of land has been the subject of lengthy discussions with your officers. There have been previous permissions on the site that are detailed below. This application forms part of a group of applications submitted for consideration, including:
Ref: 05/00392/FULMAJ Proposal: Erection of two storey office unit with associated car parking.
Ref: 05/00393/FULMAJ Proposal: Erection of 2 single storey industrial units with associated service yards and car parking.
Ref: 05/00394/OUTMAJ Proposal: A mixed-use development of mainly B1 (Offices & Light Industry), B2 (General Industry) and B8 (Warehousing & Distribution) use classes with site entrance allocated for C1 (Hotels) & A4 (Pubs & Bars) use classes (details of means of access only).
Ref: 05/00455/FULMAJ Proposal: The construction of a 100 bed hotel (C1) and public house/restaurant (A3/A4)
This report deals with the first two of the above applications, namely the two detailed applications for the office and the industrial buildings. The second two applications will be the subject of a separate report at a later date, as there remain a number of issues outstanding, particularly in respect of the appropriateness of the location for a hotel and pub development. Information required to assess the merits of the proposal remains outstanding, namely a sequential test and accessibility, sustainability and needs assessment. However, by way of background and due to the linked nature of the proposal reference is made to the other applications where appropriate below. These applications were originally submitted in April 2005. The first three applications have been received submitted on behalf of Bluemantle, the potential purchaser of the site. Originally it was indicated that they were the owners of the site. It has since transpired that they were not, and Notice has had to be served on the current owners. As a consequence the applications were invalid until the correct certificate was received on the 25 November 2005.
The outline application (05/00394/OUTMAJ) covers most of the site allocated at EM1.9 (some 5.85 hectares allocated in total). The outline application only includes details of access (effectively by the existing access road). Whilst originally a set of illustrative material had been included (plans and elevations of some of the buildings) this has subsequently been withdrawn and no indicative siting is shown. In addition a Transport Assessment (and Travel Plan), an Ecological Assessment and a Design Statement have also been submitted.
The two detailed applications, references 05/00392/FULMAJ and 05/00393/FULMAJ are full planning applications for small parts of the site that are also covered by the outline application.
A transport assessment accompanies the applications, as does a sequential approach for the development of the site for offices outside the town centre. An ecological assessment of the site has also been submitted. Finally, a design statement has been submitted to support the rationale behind the form of the building and design principles.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.