Resolved
It was proposed by Councillor A Lowe, seconded by Councillor D Edgerley, and subsequently RESOLVED (7:0) to grant full planning permission subject to the following conditions: 1. The proposed development must be begun not later than three years from the date of this permission. Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. No development shall take place until a scheme of landscaping has been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail which may have previously been submitted. The scheme shall indicate all existing trees and hedgerows on the land; detail any to be retained, together with measures for their protection in the course of development; indicate the types and numbers of trees and shrubs to be planted, their distribution on site, those areas to be seeded, paved or hard landscaped; and detail any changes of ground level or landform. Reason: In the interests of the amenity of the area and in accordance with Policy No.GN5 of the Adopted Chorley Borough Local Plan Review. 3. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. Reason: In the interest of the appearance of the locality and in accordance with Policy No GN5 of the Adopted Chorley Borough Local Plan Review. 4. During the construction period, all trees to be retained shall be protected by 1.2 metre high fencing as specified in paragraph 8.2.2 of British Standard BS5837:1991 at a distance from the tree trunk equivalent to the outermost limit of the branch spread, or at a distance from the tree trunk equal to half the height of the tree (whichever is further from the tree trunk), or as may be first agreed in writing with the Local Planning Authority. No construction materials, spoil, rubbish, vehicles or equipment shall be stored or tipped within the area(s) so fenced. All excavations within the area so fenced shall be carried out by hand. Reason: To safeguard the trees to be retained and in accordance with Policy Nos. EP9 and HT9 of the Adopted Chorley Borough Local Plan Review. 5. The development hereby permitted shall not commence until samples of all external facing materials to the proposed building(s) (notwithstanding any details shown on previously submitted plan(s) and specification) have been submitted to and approved in writing by the Local Planning Authority. The development shall only be carried ... view the full minutes text for item 28c