CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Chorley Borough Council
Development Control Committee, Tuesday 20 June 2006 at 6.30pm

A3:06/00499/FULMAJ - Healey View Care Home, Botany Brow, Chorley

Approved Planning 2 papers

Development Control Committee approved this item on Tuesday 20 June 2006. Below is the council's own wording, with the papers it was decided on.

Item28c

Resolved

It was proposed by Councillor A Lowe, seconded by Councillor D Edgerley, and subsequently RESOLVED (7:0) to grant full planning permission subject to the following conditions: 1. The proposed development must be begun not later than three years from the date of this permission. Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2. No development shall take place until a scheme of landscaping has been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail which may have previously been submitted. The scheme shall indicate all existing trees and hedgerows on the land; detail any to be retained, together with measures for their protection in the course of development; indicate the types and numbers of trees and shrubs to be planted, their distribution on site, those areas to be seeded, paved or hard landscaped; and detail any changes of ground level or landform. Reason: In the interests of the amenity of the area and in accordance with Policy No.GN5 of the Adopted Chorley Borough Local Plan Review. 3. All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. Reason: In the interest of the appearance of the locality and in accordance with Policy No GN5 of the Adopted Chorley Borough Local Plan Review. 4. During the construction period, all trees to be retained shall be protected by 1.2 metre high fencing as specified in paragraph 8.2.2 of British Standard BS5837:1991 at a distance from the tree trunk equivalent to the outermost limit of the branch spread, or at a distance from the tree trunk equal to half the height of the tree (whichever is further from the tree trunk), or as may be first agreed in writing with the Local Planning Authority. No construction materials, spoil, rubbish, vehicles or equipment shall be stored or tipped within the area(s) so fenced. All excavations within the area so fenced shall be carried out by hand. Reason: To safeguard the trees to be retained and in accordance with Policy Nos. EP9 and HT9 of the Adopted Chorley Borough Local Plan Review. 5. The development hereby permitted shall not commence until samples of all external facing materials to the proposed building(s) (notwithstanding any details shown on previously submitted plan(s) and specification) have been submitted to and approved in writing by the Local Planning Authority. The development shall only be carried ... view the full minutes text for item 28c
Word for word from the decision Chorley published for this meeting. Source: democracy.chorley.gov.uk

Follow this further

Built from Chorley's papers

What the report saysPro

Report to Development Control Committee

Item A. 3 06/00499/FULMAJ Permit Full Planning Permission

Case Officer [name removed] Chorley North East

Proposal Replacement Care Home for the Elderly

Location Healey View Care Home Botany Brow Chorley

Applicant Orchard Care Homes Ltd

Background Members will recall that planning permission was granted for a replacement care home on this site in January of this year (ref no. 05/01103/FULMAJ). Following the grant of planning permission, the applicant wished to amend the design of the care home and alter its siting. This was not considered acceptable as a minor amendment hence the submission of the application, which forms the basis of this report.

Proposal This, like the previous one is a detailed application for the erection of a new care home principally on land on Daisy Fold although there is a partial site frontage to Botany Brow. There was previously a three storey LCC care home on the site, which has now been demolished. The building was built in grey brick with an awkward gabled roof detail. It utilised quite steep gable details at either end adjacent existing residential properties.

The proposed replacement care home is predominantly of two and three storeys akin to the previous care home on site. The main element of the care home is a three-storey block running east/west, which reaches a total height of 10.5m whilst a further gabled element projecting from this in the centre reaches a height of approx. 12m. A two-storey block links the main three-storey block to a single storey wing, which runs east/west parallel to the main three-storey element at the front. The proposed care home would have a somewhat larger footprint than the existing one although the distances from the site boundaries remain similar to the care home that occupied the site previously.

For the most part it is a larger building than the one it replaces. It would be dominant in the street scene to Daisy Fold as well as the south elevation being apparent at certain angles from Botany Brow. The north elevation would be visible from the M61 and the canal over a wider distance, but the trees to be retained would diminish shorter views from Botany Brow.

13 car parking spaces are proposed in a new car park at the rear of the site, although this would result in the felling of five trees between the existing building and 44, 46 & 48 Botany Brow and at the back of the existing building. In addition, two additional trees would require to be felled at the east side of the existing building in order to accommodate the new building footprint.

Planning Policy GN1 – General Settlement Policy HS17 – Sheltered Housing Care Homes etc GN5 – Design of New Development & Landscaping EP9 - Trees & Woodlands TR4 – Highway Development Control Criteria TR8 – Parking Standards (superseded by Policy 7 of JLSP)

Planning History 00/935 – The laying out of 12 space car park (approved) 03/634 – Outline application for residential development (withdrawn prior to determination) 05/1103 – Erection of replacement Care Home (permitted)

Consultations LCC Environment Directorate (Highways) raises no objections to the application.

The Head of Public Space Services (Tree Officer) comments in relation to the previous application can be carried over to this application given the minor change to the siting and given that only the same number of trees are proposed to be felled. The comments where that the trees are not currently protected by a TPO; there are several notable silver birches and alders that contribute to the setting of the existing building and which would be worthy of a TPO; however the proposed footprint of the revised building and the new car park would conflict with the idea of retaining the trees and these would have to be amended if the identified trees were to be retained.

The Urban Design Officer comments that the design of this amended proposal is an improvement over that already approved.

The Highways Agency has no objections to the proposal.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A3:06/00499/FULMAJ: Healey View Care Home, Botany Brow, ChorleyReport 52 KB DownloadRead as text
PDF
PlanA30600499FULMAJ1Report 31 KB Download

At this meeting

Whole meeting

Who was there

14 of 21 attended
HH
Harold Heaton (profile used as a Councillor)Chair, present
DD
David Dickinson (profile used as Cllr)Vice-Chair, present
KB
Kenneth BallCommittee Member, present
TB
Thomas BedfordCommittee Member, present
FC
Former Councillor, Eric BellCommittee Member, apologies
FC
Francis CulshawCommittee Member, present
AC
Councillor Alan CainCommittee Member, present
HC
Councillor Henry CaunceCommittee Member, present
DE
Dennis EdgerleyCommittee Member, present
DG
Councillor Danny GeeCommittee Member, present
RL
Councillor Roy LeesCommittee Member, present
AL
Councillor Adrian LoweCommittee Member, present

All 21 on the meeting page

On this subject at Chorley

Search all
  1. A3:06/00499/FULMAJ - Healey View Care Home, Botany Brow, ChorleyThis decision
  2. A.4 05/01103/FULMAJ Healey View Care Home, Botany Brow, ChorleyApproved

More from Chorley Development Control Committee

All decisions
MeetingDecisionOutcome
16 Jul 2019 Minutes of meeting Tuesday, 18 June 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 18 June 2019 be approved as a correct record... Approved Open
16 Jul 2019 19/00417/FULMAJ - Land Adjoining Cuerden Residential Park, Nell Lane, CuerdenFull planning permission granted, subject to conditions and a Section 106 legal agreement. Agreed Open
16 Jul 2019 19/00325/FUL - Playing Field, Kem Mill Lane, Whittle-le-WoodsFull planning permission granted, subject to conditions. Decided Open
18 Jun 2019 Minutes of meeting Tuesday, 21 May 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 21 May 2019 be approved as a correct record ... Approved Open
18 Jun 2019 18/00108/FULMAJ - Chorley Rugby Union Club, Chancery Road, Astley Village, ChorleyFull planning permission granted, subject to conditions and a supplemental Section 106 Agreement. Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies