Resolved
It was proposed by Councillor D Gee, seconded by Councillor Snow and subsequently RESOLVED to grant planning permission subject to a Section 106 Agreement and the following conditions: 1. The development of the site should be carried out in accordance with the approved Method Statement. Reason: To ensure that the development complies with approved details in the interests of the protection of Controlled Waters. 2. If during development, contamination not previously identified, is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted and obtained written approval from the Local Planning Authority for an addendum to the method statement. This addendum to the Method Statement must detail how this unsuspected contamination shall be dealt with. Reason: To ensure that the development complies with approved details in the interests of protection of controlled waters. 3. Upon completion of the remediation detailed in the Method Statement a report shall be submitted to the Local Planning Authority that provides verification that the required works regarding contamination have been carried out in accordance with the approved Method Statement(s). Post Remediation sampling and monitoring results shall be included in the report to demonstrate that the required remediation has been fully met. Future monitoring proposals and reporting shall also be detailed in the report. Reason: To protect Controlled Waters by ensuring that the remediated site has been reclaimed to an appropriate standard. 4. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from impermeable parking areas, roadways and hardstandings for vehicles, commercial lorry parks and fuel filling areas shall be passed through an oil interceptor designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. Reason : To prevent pollution of the water environment and in accordance with Policy Nos. EP17, EP18, EM2 and EM3 of the Adopted Chorley Borough Local Plan Review. 5. No materials or equipment shall be stored on the site other than inside the building or the areas as allocate don the approved plans. Reason: In the interests of the amenity of the area and in accordance with Policy No.EM2 of the Adopted Chorley Borough Local Plan Review. 6. Before the development hereby permitted is first commenced full details of existing and proposed ground levels and proposed building slab levels (all relative to ground levels adjoining the site) shall have been submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown on previously submitted plan(s). The development shall only be carried out in conformity with the approved details. Reason: To protect the appearance of the locality, in the interests ... view the full minutes text for item 37e