Resolved
It was proposed by Councillor Adrian Lowe, seconded by Councillor Thomas Bedford, and subsequently RESOLVED (9:0) to approve the reserved matters application subject to the following conditions: 1. The development hereby permitted shall only be carried out in accordance with the approved plan, except as may otherwise be specifically required by any other condition of the outline planning permission or this approval of reserved matters or unless otherwise first agreed to in writing by the Local Planning Authority. Reason: To define the permission and ensure a satisfactory form of development. 2. The full structural details of the installation of the fuel tank, its surround, associated pipe work and monitoring system must be submitted to and approved by the Local Planning Authority prior to the installation of the agreed scheme. Reason: To prevent the pollution of the water environment. 3. Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls, details of which shall be submitted to the Local Planning Authority for approval. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. Reason : To prevent pollution of the water environment and in accordance with Policy Nos.EP17, EM2 and EM3 of the Adopted Chorley Borough Local Plan Review. 4. Discharges from yard storage areas, vehicle washing areas, loading and unloading areas and any other areas likely to be contaminated by spillage should be connected to the foul sewer. They may be regarded as trade effluenta and may require the formal consent of United Utilities. Reason : To prevent pollution of the water environment and in accordance with Policy Nos. EP17, EP18, EM2 and EM3 of the Adopted Chorley Borough Local Plan Review. 5. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from impermeable parking areas, roadways and hardstandings for vehicles, commercial lorry parks and fuel filling areas shall be passed through an oil interceptor designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. Reason : To prevent pollution of the water environment and in accordance with Policy Nos. EP17, ... view the full minutes text for item 76d