Development Control Committee, Tuesday 21 November 2006 at 6.30pm

A.3:06/01078/REMMAJ - Buffer Area, West side of Site 6 and 8, Buckshaw Avenue, Buckshaw Village, Euxton

Approved Planning 2 papers

Development Control Committee approved this item on Tuesday 21 November 2006. Below is the council's own wording, with the papers it was decided on.

Item76d

Resolved

It was proposed by Councillor Adrian Lowe, seconded by Councillor Thomas Bedford, and subsequently RESOLVED (9:0) to approve the reserved matters application subject to the following conditions: 1. The development hereby permitted shall only be carried out in accordance with the approved plan, except as may otherwise be specifically required by any other condition of the outline planning permission or this approval of reserved matters or unless otherwise first agreed to in writing by the Local Planning Authority. Reason: To define the permission and ensure a satisfactory form of development. 2. The full structural details of the installation of the fuel tank, its surround, associated pipe work and monitoring system must be submitted to and approved by the Local Planning Authority prior to the installation of the agreed scheme. Reason: To prevent the pollution of the water environment. 3. Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls, details of which shall be submitted to the Local Planning Authority for approval. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. Reason : To prevent pollution of the water environment and in accordance with Policy Nos.EP17, EM2 and EM3 of the Adopted Chorley Borough Local Plan Review. 4. Discharges from yard storage areas, vehicle washing areas, loading and unloading areas and any other areas likely to be contaminated by spillage should be connected to the foul sewer. They may be regarded as trade effluenta and may require the formal consent of United Utilities. Reason : To prevent pollution of the water environment and in accordance with Policy Nos. EP17, EP18, EM2 and EM3 of the Adopted Chorley Borough Local Plan Review. 5. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from impermeable parking areas, roadways and hardstandings for vehicles, commercial lorry parks and fuel filling areas shall be passed through an oil interceptor designed and constructed to have a capacity and details compatible with the site being drained. Roof water shall not pass through the interceptor. Reason : To prevent pollution of the water environment and in accordance with Policy Nos. EP17, ... view the full minutes text for item 76d
Word for word from the decision Chorley published for this meeting. Source: democracy.chorley.gov.uk

Follow this further

Built from Chorley's papers

What the report saysPro

Report to Development Control Committee

Item A. 3 06/01078/REMMAJ Approve Reserved Matters

Case Officer [name removed] Astley And Buckshaw

Proposal Part RDC, access, parking gatehouse, circulation space, part MHE store, bottle gas store and fuel point and landscaping,

Location Buffer Area West Of Site 6 And 8 Buckshaw Avenue Buckshaw VillageEuxton

Applicant Wolseley Uk Ltd, Helioslough & Helios Ltd

Proposal The proposal is a reserved matters application by Wolseley Uk ltd, Helioslough Ltd and Helios (Industrial Developments) Ltd for the erection of part of RDC, access, gatehouse, circulation space, equipment store, fuel point and landscaping forming the western end of a proposed Regional Distribution Centre the majority of which is sited on Site 6 & 8 of the Strategic Regional Site (SRS).

This western end of the proposal extends beyond the boundary of the SRS and into the industrial area of the Southern commercial area as granted permission under the Buckshaw Village Outline Planning Permission 02/00748/OUTMAJ, the SRS was granted Outline Planning Permission (OPP) under reference 04/00882/OUTESM. A separate reserved matters application for the major element of the proposal falling within the area covered by 04/00882/OUTMAJ is reported elsewhere on this agenda under reference 06/01079/REMMAJ. The applicant has offered up a unilateral undertaking under S106, which will tie the two permissions together so that either proposal could not be implemented independently of the other. Planning permission was granted in September of this year for a similar proposal, however permission is now sought for this alternative larger phase 2, which extends further into the southern commercial area.

The site has an area of 3.5ha and will be accessed directly via the recently approved roundabout from the link road proposed in the Outline SRS, which is some considerable way towards completion. The link road connects with the A6 opposite the Sea View public house and through to Buckshaw Village to connect with Central Avenue near Buckshaw Hall.

The proposal relates to the 9267 sq m of floor space in the form of the western end of the proposed high bay warehouse along with the main access from the link road, 120 car parking spaces and a gatehouse which will measure 7.3m long by 2.8m wide by 3.3m high and be constructed of a design to match in with the main warehouse. The gatehouse will be clad in a combination of horizontal profiled sinusoidal cladding in colour coat Prisma Aquarius and composite waveform flat panel steel cladding in Metallic Silver with blue anti sun glazing to again match the warehouse. The proposal also includes part of the MHE building attached to the southern elevation of the RDC and the fuel point close to the southern boundary. Lorry parking and circulation space is also provided as well as the western landscaping belt and part southern/northern landscape belts.

Wolseley is the world’s largest specialist trade distributor of plumbing and heating products and also a leading distributor of building materials, lumber products and industrial pipes, valves and fittings. The proposal for the regional Distribution Centre will support its rapidly expanding business in the Uk and will provide sales, distribution, specialist technical support and administration services to its trade and public customers.

Planning Policy The Strategic Regional Site is a major developed site in the Green Belt (Policy DC6). It is allocated as a Regional Investment Site in the Chorley Borough Local Plan Review (Policy EM1A) and Joint Lancashire Structure Plan (Policy 15). This western end of the site incorporating part of the RDC, the access, the gatehouse and the manoeuvring area referred to above falls outside of the Regional Investment site and is therefore covered by Policy GN2 Royal Ordnance Site. Other relevant policies include:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A.3:06/01078/REMMAJ: Buffer Area, West side of Site 6 and 8, Buckshaw Avenue, Buckshaw Village, EuxtonReport 80 KB DownloadRead as text
PDF
PlanA30601078remmaj(1).pdfReport 36 KB Download

At this meeting

Whole meeting
75Minutes of meeting Tuesday, 17th October 2006 of Development Control CommitteeDecided 76Planning Applications Awaiting DecisionDecided 76aA.2:06/01057/FULMAJ - Land between Froom Street and Crosse Hall Lane, ChorleyApproved 76bB.7:06/01080/FUL - Cam Lane Cottage, Cam Lane, Clayton-Le-Woods, ChorleyRefused 76cA.1:06/00991/FULMAJ - Part Parcel F, Main Street, Buckshaw Village, Whittle-Le-WoodsApproved
76dA.3:06/01078/REMMAJ - Buffer Area, West side of Site 6 and 8, Buckshaw Avenue, Buckshaw Village, EuxtonThis decision
76eA.4:06/01079/REMMAJ - Site 6 and 8, Buckshaw Avenue, Buckshaw Village, EuxtonApproved 76fB.1:06/00449/FUL - Buckshaw Hall, Central Avenue, Buckshaw Village, EuxtonApproved 76gB2:06/00450/LBC - Buckshaw Hall, Central avenue, Buckshaw Village, EuxtonApproved 76hB.3:06/00972/ADV - Unit B, Alliance Retail Park, Water Street, ChorleyRefused 76iB.4:06/01019/ADV - Unit A, Alliance Retail Park, Water Street, ChorleyRefused 76jB.5:06/01074/LBC - Allanson Farm, Westhoughton Road, AdlingtonDecided 76kB.6:06/01075/FUL - Allanson Farm, Westhoughton Road, AdlingtonDecided 76lB.8:06/01150/COU - Barn, North of Ash House Farm, Blue Stone Lane, MawdesleyRefused 77Site Inspection Sub-CommitteeApproved 78Enforcement Report - East of Brown House LaneApproved 79Enforcement Report - Allanson Hall 1Approved 80Enforcement Report - Allanson Hall 2Approved 81Enforcement Report - Cam Lane CottageApproved 82Enforcement Report - CarpetrightDecided 83Enforcement Report - CurrysDecided 84Up-date on National and Local Planning Obligations Best PracticeNoted 85Planning Appeals and Decisions - NotificationNoted 86Reports of the Director of Development and Regeneration on selected cases determined, following consultation with the Chair and Vice Chair of the CommitteeNoted 87A list of Planning Applications determined by the Chief Officer under Delegated Powers between 1 October 2006 - 3 November 2006Noted

Who was there

14 of 24 attended
HH
Harold Heaton (profile used as a Councillor)Chair, present
DD
David Dickinson (profile used as Cllr)Vice-Chair, present
KB
Kenneth BallCommittee Member, apologies
TB
Thomas BedfordCommittee Member, present
FC
Former Councillor, Eric BellCommittee Member, present
FC
Francis CulshawCommittee Member, present
AC
Councillor Alan CainCommittee Member, present
HC
Councillor Henry CaunceCommittee Member, present
DE
Dennis EdgerleyCommittee Member, present
DG
Councillor Danny GeeCommittee Member, apologies
RL
Councillor Roy LeesCommittee Member, present
AL
Councillor Adrian LoweCommittee Member, present

All 24 on the meeting page

More from Chorley Development Control Committee

All decisions
MeetingDecisionOutcome
16 Jul 2019 Minutes of meeting Tuesday, 18 June 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 18 June 2019 be approved as a correct record... Approved Open
16 Jul 2019 19/00417/FULMAJ - Land Adjoining Cuerden Residential Park, Nell Lane, CuerdenFull planning permission granted, subject to conditions and a Section 106 legal agreement. Agreed Open
16 Jul 2019 19/00325/FUL - Playing Field, Kem Mill Lane, Whittle-le-WoodsFull planning permission granted, subject to conditions. Decided Open
18 Jun 2019 Minutes of meeting Tuesday, 21 May 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 21 May 2019 be approved as a correct record ... Approved Open
18 Jun 2019 18/00108/FULMAJ - Chorley Rugby Union Club, Chancery Road, Astley Village, ChorleyFull planning permission granted, subject to conditions and a supplemental Section 106 Agreement. Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies