Resolved
Planning application withdrawn Application withdrawn.
Development Control Committee decided this item on Tuesday 18 August 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
Planning application withdrawn Application withdrawn.
Item 10 09/00541/FUL Refuse Full Planning Permission
Case Officer [name removed] Chorley North East
Proposal Demolition of existing bungalow and erection of 8 two storey detached dwellings with associated garages and infrastructure
Location 4 Ewell Close Chorley PR6 8TT
Applicant [name removed] The main issues to consider in determining the application are impact on neighbour amenity, design and appearance, impact on highway safety and ecology.
Planning Policy GN1: Settlement Policy – Main Settlements GN5: Building Design and Retaining Existing Landscape Features EP9: Trees and Woodlands EP18: Surface Water Runoff HS4: Design and Layout of Residential Development HS6: Housing windfall Sites HS21: Playing Space Requirements TR4: Highway Development Control Criteria
Chorley into 2016: Sustainable Resources DPD Supplementary Planning Guidance Design Guidance
PPG3 PPG9
Planning History No relevant planning history
Consultees Responses LCC Highways: In principle there is no objection to this development however the details would need a number of minor amendments: some driveways need lengthening to 6m between the garage door and the back of the footway; driveway to plot 8 does not work with 90o bend in it, this will result ion the vehicle being left on the road, the driveway arrangements to plots 2 and 3 are difficult to enter/exit at the angle shown, this will result in extreme manoeuvres on the highway to gain access, these should be improved.
United Utilities: no objection to the proposal provided that the site is drained on separate system, with only foul drainage connected to the foul sewer.
Neighbourhoods: Desk top study seems satisfactory – however there are a couple of omissions Firstly the historical maps appear to be missing. Secondly, there does not appear to be any assessment of the geology, hydrogeology and hydrology - these are required for a desk study. LCC Ecology: The following information should be provided before the application is determined: results of emergence surveys for bats; a full tree survey and potential impacts upon species of importance.
Planning Policy: comments awaited
MAPS – Chorley Community Safety Partnership: Comments awaited
Arboricultural Officer: comments awaited
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
09/00541/FUL: 4, Ewell Close, ChorleyReport | 42 KB | DownloadRead as text |
PDF |
Item 10 0900541FUL(1).pdfReport | 35 KB | Download |
PDF |
Item 10 0900541FUL(2).pdfReport | 56 KB | Download |
Follow Development Control Committee at Chorley and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Jul 2019 | Minutes of meeting Tuesday, 18 June 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 18 June 2019 be approved as a correct record... | Approved | Open |
| 16 Jul 2019 | 19/00417/FULMAJ - Land Adjoining Cuerden Residential Park, Nell Lane, CuerdenFull planning permission granted, subject to conditions and a Section 106 legal agreement. | Agreed | Open |
| 16 Jul 2019 | 19/00325/FUL - Playing Field, Kem Mill Lane, Whittle-le-WoodsFull planning permission granted, subject to conditions. | Decided | Open |
| 18 Jun 2019 | Minutes of meeting Tuesday, 21 May 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 21 May 2019 be approved as a correct record ... | Approved | Open |
| 18 Jun 2019 | 18/00108/FULMAJ - Chorley Rugby Union Club, Chancery Road, Astley Village, ChorleyFull planning permission granted, subject to conditions and a supplemental Section 106 Agreement. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.