Deferred to allow further dialogue to take place between the developer and the planning officers. It was proposed by Councillor Dennis Edgerley , seconded by Councillor Alistair Bradley and was subsequently RESOLVED (12:2) to defer the decision to allow for further dialogue between the planning officers and the developer.
Word for word from the decision Chorley published for this meeting.Source: democracy.chorley.gov.uk
Item 1 09/00640/FUL Permit (Subject to Legal Agreement)
Case Officer [name removed] Chorley North East
Proposal Demolition of existing bungalow and erection of 7 two storey detached dwellings with associated garages and infrastructure (resubmission of application 09/00541/FUL)
Location 4 Ewell Close Chorley PR6 8TT
Applicant [name removed] will recall that this application was reported at the last Development Control Committee, but a decision was deferred until the period neighbour consultation had expired and all consultation responses had been received. As a number of comments were reported on the addendum and have subsequently been received a new report is included below.
Proposal This application proposes the demolition of one existing dwelling and the erection of 7 two storey detached dwellings with associated garages and infrastructure.
Location 4 Ewell Close, Chorley
Summary The main issues to consider in determining the application are impact on neighbour amenity, design and appearance, impact on highway safety and ecology.
Planning Policy GN1: Settlement Policy – Main Settlements GN5: Building Design and Retaining Existing Landscape Features EP9: Trees and Woodlands EP18: Surface Water Runoff HS4: Design and Layout of Residential Development HS6: Housing windfall Sites HS21: Playing Space Requirements TR4: Highway Development Control Criteria
Planning History 09/00541/FUL Demolition of existing bungalow and erection of 8 two storey detached dwellings with associated garages and infrastructure Withdrawn 10th August 2009
Consultees Responses LCC Highways: have reservations on the proposal mainly due to the poor existing site lines for the new properties. Five of the properties access directly onto a bend on Dorking Road which adversely affects each of the. Furthermore there are evergreen trees on the boundaries of neighbouring properties (i.e. nos. 11 & 13 Dorking Road) that affect sight lines but to which the applicants have no control over. Plot 3 accesses almost directly on to the Ewell Close/Dorking Road junction and the westward sightline here is very poor due to the presence of the evergreen trees bordering No. 11 as mentioned above. Object to this proposal for these reasons and also on the grounds of 5 new accesses being created on to a particularly unsuitable part of the highway where none existed before.
Members should note that when the previous application was submitted no objection in principle was raised by LCC Highways to the proposal and only a number of minor amendments to the position and size of driveways and garages suggested.
The change in advice on highway matters is a concern that members should have regard to as decision makers. Advice on appeal is that planning authorities should carefully consider the advice from the highway authority in reaching a decision. In this instance due to a change of highway advice the comments on all but plot 3 are open to criticism and may not be substantiated on appeal. Plot 3 could be amended to provide an access onto Ewell Close and as such the access to this ploy could be removed and required to be reconsidered.
United Utilities: no objection to the proposal provided that the site is drained on separate system, with only foul drainage connected to the foul sewer. Neighbourhoods: are satisfied with the contents of the desk top study and agree that the risk of contamination is low. However, should during the course of the development, any suspected contaminated material be discovered then the development should cease until such time as further remediation proposals have been submitted to an approved in writing by the Local Planning Authority.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.