Resolved
Decision deferred to allow Members of the Committee time to visit the site of the proposed development
Development Control Committee deferred this item on Tuesday 23 April 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision deferred to allow Members of the Committee time to visit the site of the proposed development
NOTES : Copyright in all documents and drawings prepared by the architect and any works executed from these documents and drawings shall, unless otherwise agreed, remain the property of the architect and must not be reproduced by, lent or disclosed to , a third party without the written consent of Good & Tillotson.
DO NOT SCALE OFF THIS DRAWING.
All dimensions to be checked on site and any discrepancies to be W.C./ BATH ROOM WINDOWS TO W.C./ BATH ROOM WINDOWS TO referred to the architect before proceeding. HAVE "PRIVACY GLASS" FINISH HAVE "PRIVACY GLASS" FINISH (INDICATED "P") ALL LEVELS TO BE CHECKED ON SITE.
All discrepancies between information shown on the drawings and the information in the specification to be referred to the architect prior to proceeding.
All component sizes and references to be checked prior to ordering of materials. P Positions and designation ( i.e. combined, surface water or foul ) of existing drain runs on site are to be checked / confirmed by the building contractor prior to commencement of any drainage works. Any existing drains, to which additional connections are to be made, are also to be checked as necessary to ensure that they are suitable to accommodate additional capacity and the type of effluent being connected.
All relevant boundary positions to be checked prior to proceeding. P P P
P P P P P
EXISTING DOOR OPENING TO SEALED Front Elevation NEW W.C.WINDOW OPENING WITH "PRIVACY GLASS" Rear Elevation WITH BRICK TO MATCH EXISTING CREATED WITHIN EXISTING DOOR OPENING INFILL BRICK WORK TO MATCH EXISTING (INDICATED "P") NEW.WINDOW OPENING TO BE CREATED WITHIN W.C./ BATH ROOM WINDOWS TO W.C./ BATH ROOM WINDOWS TO EXISTING DOOR OPENING HAVE "PRIVACY GLASS" FINISH HAVE "PRIVACY GLASS" FINISH INFILL STONE WORK TO MATCH EXISTING (INDICATED "P") (INDICATED "P")
P P P PROPRIETOR`S PRIVATE STAFF CAR PARKING GARDEN AREA
GARDEN AREA
E.E.
Female Male Store W.C. W.C. Emergency En- Side Elevation Kitchen Escape Suite Stair Store
Corridor
Disabled Persons Bedroom (1)
Servery Family Room Restaurant GARDEN AREA Dining/ Family Foyer Room Office/ W.C. Reception Rear Entrance
Entrance Kitchen
Hall
Store Emergency Bedroom En- Emergency Bedroom Room Escape (2) Suite Escape (3) Stair Stair
Corridor Lounge Study En- En- Suite Suite
Master Bedroom En- Bedroom En- Bedroom (4) Suite (6) Suite A 3 No "STAFF CAR PARKING " SPACES Rev. ADDED TO REAR OF BUILDING Bedroom(7) Main CAR PARK SET OUT OVER RTH 04/04.13 Entrance ORIGINAL HARD STANDING En- Bedroom En- Suite (5) Good & Tillotson Chartered Architects Ground Floor Suite
2 The Studios, 318 Chorley Old Road, Bolton. BL1 4JU
Family Tel : 01204 497700 Bedroom (1) Fax : 01204 497776
E-mail : [email removed] Bathroom Web : www.goodandtillotson.co.uk KEY Client : Shutter Doors Property Services Limited Project :
HATTON HOUSE PROPRIETOR`S ACCOMMODATION PROPOSED "CHANGE OF USE" FROM OFFICES TO "BED AND BREAKFAST" GUEST HOUSE AND PROPRIETOR`S ACCOMMODATION P Family Family Bedroom (2) Bedroom (3) Drawing : Date : "PRIVACY GLAZING" 15th February 2013 Proposed Plans and Elevations Drawn : R.T.H. Planning Drawing Scale : 1 : 100 @ A1 / 1 : 200 @ A3 First Floor Project No. : Drawing Number : Drawing Revision :
1301 10 A
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
13-00168-FUL: Amended Internal Layout and Elevations April 2013.pdfReport | 229 KB | DownloadRead as text |
PDF |
13-00168-FUL: Amended Layout April 2013.pdfReport | 54 KB | Download |
PDF |
13-00168-FUL: Location Plan Feb 2013.pdfPlan | 959 KB | Download |
PDF |
13/00168/FUL: Naylor & Walkden, Hatton House, 15 Hatton Street, Adlington, ChorleyReport | 105 KB | Download |
Follow Development Control Committee at Chorley and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 16 Jul 2019 | Minutes of meeting Tuesday, 18 June 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 18 June 2019 be approved as a correct record... | Approved | Open |
| 16 Jul 2019 | 19/00417/FULMAJ - Land Adjoining Cuerden Residential Park, Nell Lane, CuerdenFull planning permission granted, subject to conditions and a Section 106 legal agreement. | Agreed | Open |
| 16 Jul 2019 | 19/00325/FUL - Playing Field, Kem Mill Lane, Whittle-le-WoodsFull planning permission granted, subject to conditions. | Decided | Open |
| 18 Jun 2019 | Minutes of meeting Tuesday, 21 May 2019 of Development Control CommitteeDecision – That the minutes of the Development Control Committee held on 21 May 2019 be approved as a correct record ... | Approved | Open |
| 18 Jun 2019 | 18/00108/FULMAJ - Chorley Rugby Union Club, Chancery Road, Astley Village, ChorleyFull planning permission granted, subject to conditions and a supplemental Section 106 Agreement. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.