Chorley Borough Council
Executive Cabinet, Thursday 14 July 2022 at 6.30pm

Approval to go out to Tender for Remedial Repairs to Brinscall Pool Concrete Floors

Approved Executive 1 paper

Executive Cabinet approved this item on Thursday 14 July 2022. Below is the council's own wording, with the papers it was decided on.

Item20

Resolved

Approval to utilise part of the approved Leisure Centre Improvements budget to enable essential structural repair works to be carried out to Brinscall Swimming Pool, work to include repairing structural floors and tank walls. This option would require the closure of the pool for approximately 6 months. 2. Approval to undertake a competitive tender for urgent refurbishment works to Brinscall Pool through the open Chest portal in accordance with procurement procedures. 3. Approval to delegate authority to the Executive Member (Resource) to award the contract to undertake refurbishment works following completion of tender process. 1. Approval to utilise part of the approved Leisure Centre Improvements budget to enable essential structural repair works to be carried out to Brinscall Swimming Pool, work to include repairing structural floors and tank walls. This option would require the closure of the pool for approximately 6 months. 2. Approval to undertake a competitive tender for urgent refurbishment works to Brinscall Pool through the open Chest portal in accordance with procurement procedures. 3. Approval to delegate authority to the Executive Member (Resource) to award the contract to undertake refurbishment works following completion of tender process. Reasons for recommendations: 1. Due to the ongoing degradation of structural steel reinforcement and concrete to the main pool area floors, the integrity of the pool structure has now reached a point where extreme failure of the structure could occur. 2. Failure to repair the defective concrete floor will render the facility not safe for use in the very near future, requiring the closure of the pool. 3. Temporary propping has been carried out over the last 12 years to enable the building to remain open, however the temporary propping is no longer adequate to ensure the safe operation of the building. A longer-term solution is now urgently needed to ensure the ongoing usability of the pool. Other options considered and rejected: 1. The introduction of permanent propping of floors has been considered, and detailed structural designs have been sought. Appendix D shows the extend of propping which would be required to secure the floors to enable the facility to remain open in the short to medium term. It was estimated that the propping proposed could extend the life of the pool for 2 – 3 years before remedial works would be unavoidable. The costs to undertake this work would be considerable therefore it is considered that these funds would be better spent on delivering the long term solution. 2. Carry out full structural repair works requiring the stripping out of the existing floors and recasting new structural member and floors. Works will require the ... view the full minutes text for item 20.
Word for word from the decision Chorley published for this meeting. Source: democracy.chorley.gov.uk

Follow this further

Built from Chorley's papers

What the report saysPro

Report to Executive Cabinet

Purpose of the report

1. To seek approval to procure urgent, essential, structural repair works through competitive tendering via open chest portal.

2. To seek approval to delegate authority for the Executive Member (Resources) to award the contract under an EMD.

Recommendations to Executive Cabinet

3. Approval to utilise part of the approved Leisure Centre Improvements budget to enable essential structural repair works to be carried out to Brinscall Swimming Pool, work to include repairing structural floors and tank walls. This option would require the closure of the pool for approximately 6 months.

4. Approval to undertake a competitive tender for urgent refurbishment works to Brinscall Pool through the open Chest portal in accordance with procurement procedures.

5. To delegate authority to the Executive Member (Resource) to award the contract to undertake refurbishment works following completion of tender process.

Reasons for recommendations

6. Due to the ongoing degradation of structural steel reinforcement and concrete to the main pool area floors, the integrity of the pool structure has now reached a point where extreme failure of the structure could occur.

7. Failure to repair the defective concrete floor will render the facility not safe for use in the very near future, requiring the closure of the pool. 8. Temporary propping has been carried out over the last 12 years to enable the building to remain open, however the temporary propping is no longer adequate to ensure the safe operation of the building. A longer-term solution is now urgently needed to ensure the ongoing usability of the pool.

Other options considered and rejected

9. The introduction of permanent propping of floors has been considered, and detailed structural designs have been sought. Appendix D shows the extend of propping which would be required to secure the floors to enable the facility to remain open in the short to medium term. It was estimated that the propping proposed could extend the life of the pool for 2 – 3 years before remedial works would be unavoidable. The costs to undertake this work would be considerable therefore it is considered that these funds would be better spent on delivering the long term solution.

10. Carry out full structural repair works requiring the stripping out of the existing floors and recasting new structural member and floors. Works will require the complete refurbishment of changing room areas and tiling of the pool deck & tank. Significant additional cost would be incurred to undertake these works and would require closure of pool for 12 months. This could extend the pool structure life up to an additional 50 years.

11. The final option to consider would be the closure of the pool and the possible redevelopment of the existing site. This option was considered not to be appropriate at this time.

Corporate priorities

12. The report relates to the following corporate priorities:

Involving residents in improving their local A strong local economy area and equality of access for all

Clean, safe and healthy communities An ambitious council that does more to meet the needs of residents and the local area

Background to the report

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Approval to go out to Tender for Remedial Repairs to Brinscall Pool Concrete FloorsReport 1.6 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 39 attended
AB
Councillor Alistair BradleyChair, present
PW
Councillor Peter WilsonVice-Chair, present
BM
Councillor Beverley MurrayCommittee Member, present
TH
Councillor Terry HowarthCommittee Member, present
AM
Councillor Alistair MorwoodCommittee Member, present
AL
Councillor Adrian LoweCommittee Member, present
GH
Gary HallOfficer, in attendance
CS
Chris SinnottOfficer, in attendance
AK
Asim KhanOfficer, expected
ML
Mark LesterOfficer, expected
DW
Dave WhelanOfficer, in attendance
CM
Chris MoisterOfficer, expected

All 39 on the meeting page

On this subject at Chorley

Search all
  1. Approval to go out to Tender for Remedial Repairs to Brinscall Pool Concrete FloorsThis decision
  2. Approval for the procurement approach including the award procedure, evaluation methodology and criteria to purchase one large (15t) and two compact mechanical sweepers by working in partnership with South Ribble Borough CouncilApproved

More from Chorley Executive Cabinet

All decisions
MeetingDecisionOutcome
17 Sep 2026 Minutes of meeting Thursday, 9 July 2026 of Executive Cabinetthat the minutes of the Executive Cabinet meeting held on Thursday, 9 July 2026 be confirmed as a correct record for ... Decided Open
17 Sep 2026 Social Value Position Statement 25/26To approve the report and note the impact of Social Value in the Borough. Approved Open
17 Sep 2026 Revenue Budget Monitoring Report Q1To note the 2026/27 forecast outturn for revenue and reserves, based on the position at 31 July 2026. 2. To note ther... Noted Open
17 Sep 2026 Capital and Balance Sheet Monitoring Report Q1To approve the revised Capital Programme, attached at Appendix A, which includes an amendment to the programme of £1.... Approved Open
17 Sep 2026 Chorley Quarter One Performance Monitoring Report 2026/27To note the report and provide feedback where required. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies