What was decided
The Planning Committee granted hybrid planning permission for the demolition of existing buildings and phased mixed use development of up to 340 residential units, comprising 225 in phase 1 (full) and up to 115 in phase 2 (outline). Report 2.1, 5.1
Phase 1 will deliver 215 social rent units plus 10 returning leaseholder units, with 70 three-bed or larger units provided. Report P5, 4.2
Permission is subject to a legal agreement securing planning obligations, conditions, and any direction by the London Mayor under the 2008 Order. Report P2, P3, 2.6
Why
The scheme would make a notable contribution to housing delivery in a highly sustainable location with very good access to shops, facilities and public transport.
The massing and architectural approach responds sensitively to surrounding context, with substantial improvements to public realm, play, sporting provision, community facilities and a re-provided pre-school. Report 4.3, 4.5
Officers considered that the substantial benefits of the scheme outweigh the harm, including less than substantial harm to the South Norwood Conservation Area and impact on neighbouring properties. Report 4.4, 4.6, 4.12
What happens next
The legal agreement must be completed within 4 months of the committee meeting, otherwise the Director has delegated authority to refuse permission. Report 2.6
Reserved matters for phase 2 (access, appearance, landscaping, layout and scale) must be submitted within 5 years, with implementation within 2 years of reserved matters approval. Report P39
If a new Local Plan is adopted before the decision is issued, the Director has delegated authority to reassess the application under the new policy. Report 2.7
The money
- £192,156 Carbon Offset Phase 1, payable 50% on commencement, 25% on 50% occupation, 25% on substantial completion Report P14
- £100,743 Estimated Carbon Offset Phase 2, payable 50% on commencement, 50% on substantial completion Report P15
- £1,500 per obligation per phase Monitoring Costs Report P16
- £115,412.50 Local Employment and Training Strategy Construction Phase 1 Report P17
- £87,500 Estimated Local Employment and Training Strategy Construction Phase 2 Report P17
- £15,000 Controlled Parking Zone Assessment and Consultation, payable on commencement Report P17
- £100,000 Cap on additional Controlled Parking Zone Implementation and Operational Delivery Contribution Report P18
- £34,000 Sustainable Transport Contribution Phase 1, payable on occupation of 50% of phase 1 (113 units) Report P20
- £172,500 Maximum Sustainable Transport Contribution Phase 2 (£1,500 per unit) Report P21
- £3,400 Air Quality Contribution Phase 1, payable on occupation of 50% of phase 1 (113 units) Report P23
- £11,500 Maximum Air Quality Contribution Phase 2 (£100 per unit) Report P24
- Up to £281,833 NHS contribution (engagement with NHS ongoing) Report P25
- £259,968.50 Approximate total Phase 1 contributions Report P26
- £372,243 Indicative total Phase 2 contributions, excluding NHS and monitoring fees Report P26
Options considered
- Chosen: Option 1 'Central Neighbourhood Green': 377 units, 4-6 storeys with single 12 storey tower. Design Review Panel considered it more successful than option 2 Report 3.4, 3.5
- Rejected: Option 2 'Western Neighbourhood Green': 365 units, 4-6 storeys with towers of 10 and 12 storeys. Design Review Panel considered option 1 more successful Report 3.4, 3.5
- Chosen: Hybrid application (full for phase 1, outline for phase 2) with up to 340 units. Officers concluded benefits outweigh harm, subject to legal agreement and conditions Report 2.1, 4.12
Implications
- Legal: Planning permission subject to completion of legal agreement within 4 months and any direction by the London Mayor. Report P2, 2.6
- Equalities: Phase 1 delivers 215 social rent units and 10 units for returning leaseholders; 90% of units to meet M4(2) accessibility standard and 10% M4(3). Report P5, P37
- Climate: Development required to meet zero carbon targets via offsetting contributions, with Be Seen monitoring clauses secured. Report P9, 4.10
- Risk: Less than substantial harm identified to South Norwood Conservation Area and setting of some locally listed buildings due to the up to 14 storey tower in phase 2. Report 4.4
- Staffing: Local Employment and Training Strategy secured for construction phases, with phase 1 contribution of £115,412.50. Report P12, P17
- Other: Loss of some trees, although all high quality (A category) trees including the existing TPO would be retained and replaced with a greater number of trees. Report 4.9
Who and where
- Existing social tenants and leaseholders on Regina Road Estate (decanting and rehousing) Report P5
- Future residents of the new development (up to 340 homes) Report 5.1
- Existing pre-school provider and users (facility to be re-provided) Report P13, 4.5
- Local community groups (new community space, MUGA, play space, growing area) Report 4.5
- Neighbouring residents on Regina Road, Sunny Bank, Bradshaw Close, Camile Close and Bevill Close Report 5.16, 4.6
- NHS (health infrastructure contribution up to £281,833) Report P25
- Local construction employment and training participants Report P12
Timeline
- September 2023: First Place Review Panel presentation for northern side of Regina Road only Report 3.2
- June 2024: Second Design Review Panel with two options presented Report 3.4
- November 2024: First pre-application Planning Committee presentation (380 homes scheme) Report 3.15
- 29th November 2024: Emerging Croydon Local Plan submitted to Secretary of State for Examination in Public Report 5.19
- February 2025: Third Design Review Panel presentation
- April 2025: Second pre-application Planning Committee presentation Report 3.18
- 2025-10-16: Planning Committee decision to grant
- Within 4 months of committee meeting: Deadline for completion of legal agreement Report 2.6
- Within 3 years: Implementation period for phase 1 (full application) Report P30
- Within 5 years: Reserved matters submission deadline for phase 2 (outline application) Report P39
Plain English for the jargon
- PTAL: Public Transport Accessibility Level, a scoring system from 0 to 6b indicating access to public transport (site rated 3)
- S.278 agreement: Section 278 Highways Act agreement under which developers carry out works to the public highway
- S.38 agreement: Section 38 Highways Act agreement for adoption of new roads by the local authority
- MUGA: Multi-Use Games Area, a hard surfaced outdoor area for sport
- NDSS: Nationally Described Space Standards, minimum space standards for new dwellings
- SuDS: Sustainable Drainage System, drainage designed to manage surface water runoff
- LETS: Local Employment and Training Strategy, securing local jobs and training during construction
- M4(2) and M4(3): Building regulation accessibility standards for dwellings, M4(2) for accessible and adaptable, M4(3) for wheelchair user dwellings
- AOD: Above Ordnance Datum, a height reference measured in metres above mean sea level
- LPS blocks: Large Panel System buildings, a type of prefabricated concrete tower block construction
- Be Seen: London Plan monitoring requirement for energy performance of new developments