Resolved
That planning permission be GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason : To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 The construction of the dwellings hereby approved shall not take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the council offices. Materials should be kept on site and arrangements made with the planning officer for inspection. Reason : To ensure a satisfactory appearance to the development and to safeguard the character and appearance of the setting of the adjacent listed bridge and lock in accordance with adopted Core Strategy Policies CS12 and CS27. 3 The construction of the dwellings shall not take place until full details of both hard and soft landscape works shall have been submitted to and approved in writing by the local planning authority. These details shall include: · hard surfacing materials; · means of enclosure; · soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; · trees to be retained and measures for their protection during construction works; · proposed finished levels or contours; · car parking layouts and other vehicle and pedestrian access and circulation areas; · minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting etc ); The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted. Reason : To ensure a satisfactory appearance to the development and to safeguard the visual character of the immediate area in accordance with adopted Core Strategy Policy CS12 and saved Local Plan Policy 106. 4 Visibility splays of not less than 2.4m x 38m shall be provided, and thereafter maintained, in both directions from the access onto Tring Road, as shown in principle in Document 453416-PEP-00-XX-DR-D-1300 P02 Proposed Access Arrangement. Reason : ... view the full minutes text for item 173.