Resolved
That planning permission be GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason : To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 The development hereby permitted shall be carried out in accordance with the following approved plans/documents: 17/104.001 17/104.002 17/104.003 17/104.004 17/104.005 17/104.006 17/104.007 17/104.008 Reason: For the avoidance of doubt and in the interests of proper planning. 3 Prior to the commencement of the use hereby permitted the vehicular access for the existing property shall be widened to a maximum width of 5.4 metres to accord with the Hertfordshire County Council residential access construction specification. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. Reason : In the interest of highway safety and traffic movement in accordance with Adopted Core Strategy CS12 4 The windows at first floor level in the western elevation of the extension hereby permitted shall be permanently fitted with obscured glass and non-opening below 1.7 metres unless otherwise agreed in writing by the local planning authority. Reason : In the interests of the residential amenities of the occupants of the adjacent dwellings in accordance with Adopted Core Strategy CS12 Article 35 Statement Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015. Informatives : 1. The Highway Authority requires the alterations to or the construction of the vehicle crossovers to be undertaken such that the works are carried out to their specification and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.), the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to apply to the Highway Authority to obtain their permission and requirements. The ... view the full minutes text for item 36.