Resolved
That planning permission be GRANTED subject to the following conditions: Conditions No Condition 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 The development hereby permitted shall be carried out in accordance with the following approved plans/documents: wren naj 34d 2019 wren naj 34b 2019 Reason: For the avoidance of doubt and in the interests of proper planning. 3 The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match in size, colour and texture those used on the existing annexe building. Reason: To ensure a satisfactory appearance to the development in accordance with Policy CS12 of the Core Strategy (2013). 4 No development shall commence until full details (in the form of scaled plans and written specifications) have been submitted and approved in writing by the Local Planning Authority to illustrate the following: • A total vehicle crossover width of 5.4m (made up of four flat kerbs and two ramped kerbs). • Clarification of bin storage arrangements for the two dwellings as bins are only shown at the dwelling accessed via Bunkers Lane on the submitted plans. Reason: To ensure suitable, safe and satisfactory planning and development of the site in accordance with Policy CS8 and CS12 of the Dacorum Core Strategy (2013. 5 Pedestrian Visibility Splays Before the new vehicular access is first brought into use 0.65 metre x 0.65 metre pedestrian visibility splays shall be provided and permanently maintained each side of the access. They shall be measured from the point where the edges of the access way cross the highway boundary, 0.65 metres into the site and 0.65 metres along the highway boundary therefore forming a triangular visibility splay. Within which, there shall be no obstruction to visibility between 0.6 metres and 2.0 metres above the carriageway. Reason: To ensure construction of a satisfactory development and in the interests of highway safety in accordance with Policies CS8 and CS12 of the Dacorum Core Strategy (2013). Informatives : Construction standards for ... view the full minutes text for item 256.