Resolved
That planning permission be GRANTED subject to the following conditions: Conditions No Condition 1 The building hereby permitted shall only be used for non-commercial equestrian or agricultural purposes and therefore excludes any residential use. Reason : To safeguard the Green Belt and the residential amenity of the locality in accordance with Policies CS5 and CS12 of the Dacorum Core Strategy 2013 and for the avoidance of doubt. 2 There shall be no additional floor space formed within the building hereby permitted (and therefore no first floor shall be formed) and no external alterations to the approved design of the building hereby permitted. Reason : To safeguard the Green Belt and the local environment in accordance with Policies CS5, CS12 and CS29 of the Dacorum Core Strategy 2013. 3 The building hereby permitted shall be constructed in the materials specified on Drawing No. DRG 1819/1E. Reason : In the interests of the visual amenity in accordance with Policies CS5 and CS12 of the Dacorum Core Strategy 2013. 4 The development hereby permitted shall be served by a sustainable drainage system at all times. Reason : To ensure that the development is subject to an acceptable drainage system in accordance with the aims of Policies CS12 and CS31 of the Dacorum Core Strategy 2013 and to protect groundwater to accord with the requirements of Policies CS31 and CS32 of the Dacorum Core Strategy 2013. 5 The building hereby permitted shall at all times feature a bat roost unit (tubes) integrated within the fabric of the new barn and designed/installed under the guidance of a suitably experienced ecologist. Reason : To ensure biodiversity benefit in accordance with Policy CS29 of Dacorum Core Strategy 2013. 6 Prior to the first use of the building hereby permitted details of all exterior lighting to be installed to serve the building shall be submitted to and approved in writing by the local planning authority. The approved exterior lighting shall be installed within three months following the first use of the building hereby permitted and thereafter retained fully in accordance with the approved details. Reason : To safeguard the local environment in accordance with the requirements of Policies CS5, CS12, CS24 , CS29 and CS32 of the Dacorum Core Strategy 2013 and Policy 113 and Appendix 8 of the saved Dacorum Borough Local Plan. 7 Subject to the requirements of other conditions of this planning permission the development hereby permitted shall be carried out in accordance with the following plans: 1819/1E 1819/3D 1819/3E 1819/2B Reason ... view the full minutes text for item 277.