Resolved
That planning permission be Granted. Cllr Pearl Oguchi arrived at 19:05 Conditions and Reasons : 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. No development (excluding demolition/ground investigations) shall take place until details of the materials and brick bond to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection. Reason 1: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). Reason 2 : To preserve or enhance the character and appearance of the designated heritage asset in accordance with the Planning (Listed Buildings and Conservation Areas) Act 1990 and Policy CS27 of the Dacorum Borough Core Strategy (2013). 3. No construction of the superstructure shall take place until details of how the existing hung tiles are to be re-used and/or matched on a like for like basis in the new side elevation hereby permitted have been submitted and approved in writing by the Local Planning Authority. These details shall include: o A plan showing how the re-used tiles will be placed on the approved side elevation and how they relate to any new tiles; and o Details and photos of the matching tiles. Development shall be carried out in accordance with the approved plan and details. Reason: To preserve or enhance the character and appearance of the designated heritage asset in accordance with the Planning (Listed Buildings and Conservation Areas) Act 1990 and Policy CS27 of the Dacorum Borough Core Strategy (2013). 4. Notwithstanding the details shown on Drawing 19/0088/02 Rev E proposed plans and elevations, both first floor side windows within the gable end side elevation of the development hereby permitted shall be permanently fitted with obscure-glazing and non-opening below a height of 1.7m from finished floor level. Reason: In the interests of safeguarding residential amenity in accordance with Policy CS12 of the Dacorum Core Strategy 2013. 5. The development hereby permitted shall be carried out in accordance with the ... view the full minutes text for item 21.