Resolved
Planning be DELAGATED FOR APPROVAL Subject to the following: 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Plans PO-001 (Site Location Plan) PO-100 (Proposed Site Plan) PO-101 (Proposed NE Elevation) PO-102 (Proposed SE Elevation) PO-103 (Proposed SW Elevation) PO-104 (Proposed NW Elevation) PO-105 (Proposed Section) P1-100 (Lower Ground Floor Plan) P1-101 (Upper Ground Floor Plan) P1-102 (First Floor Plan) P1-103 (Second Floor Plan) P1-104 (Third Floor Plan) P1-105 (Roof Plan) P2-100 (Courtyard Section) P2-101 (Courtyard Section) P3-100 (Block A NE Elevation) P3-101 (Block A SE Elevation) P3-102 (Block A SW Elevation) P3-103 (Block A NW Elevation) P3-200 (Block B NE Elevation) P3-201 (Block B SE Elevation) P3-202 (Block B SW Elevation) P3-203 (Block B NW Elevation) P4-100 (Entrance Detail) P4-101 (Bay Detail) P4-102 (Bay Detail) P4-103 (Courtyard Detail) P4-200 (Typical 1 bed unit) P4-201 (Typical 2 bed unit) P4-202 (Penthouse unit) 649.02.001 Revision F (Landscape Masterplan) Documents Air Quality Assessment (BER-WSP-SW-XX-RP-AQ-004) by WSP dated July 2020 Arboricultural Impact Assessment by Lockhart Garratt dated July 2020. Design and Access Statement by ColladoCollins Architects dated July 2020 Ecological Appraisal (Revision E) by FPCR Environment and Design Ltd dated July 2020 Energy Statement – Revision 3 by Hoare Lea dated June 2020. Environmental Noise Survey – Revision 6 by Hoare Lea dated 4 th September 2020 Flood Risk Assessment and Drainage Strategy (BER-WSP-SW-XX-RP-C-001) by WSP dated July 2020 Landscape and Ecology Management Plan by Bradley-Hole Schoenaich and FPCR Environment and Design Ltd dated July 2020 Outline Construction Environment Management Plan (CEMP) by Elysian Residences dated July 2020 Preliminary Geo-Environmental Risk Assessment (Desk Study) (BER-WSP-SW-XX-RP-S-001) by WSP dated July 2020 Transport Assessment (BER-WSP-SW-XX-RP-T-001) by WSP dated July 2020 Travel Plan by WSP dated July 2020. Reason: For the avoidance of doubt and in the interests of proper planning. Design 3. No development, except that involved in the provision of foundations, contamination or other site investigations or services, shall take place until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. These materials shall be made available to view on site. Reason: To ensure satisfactory appearance to the development and to safeguard the visual character ... view the full minutes text for item 5a
Word for word from the decision Dacorum published for this meeting.
Source: democracy.dacorum.gov.uk