Resolved
Resolved : Granted Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The building hereby permitted shall only be used for agricultural purposes. Reason: With due regard to the building’s very significant visual impact upon this part of the AONB, the local planning authority has only been prepared to grant planning permission for the building due to the entirely farm based operational circumstances confirmed by the submitted information. This explains the need for the building to serve Westlands Farm in this location, of this size and in the absence of other alternatives for the Farm’s operation. Permission for the building for the approved use is in accordance with the National Planning Policy Framework’s economic objective. 3. The development shall be constructed in the materials referred to by Plan No. 200.02A, and all the south western elevation reclad in timber within 18 months of the building’s first use. All the rainwater goods shall be black and roller shutter door and pedestrian door shall match the cladding of the south western elevation and notwithstanding the details shown by Block Plan 200.01 Rev A the building hereby permitted shall constructed in the dimensions specified by Plan No. 200.02A. Reason : In the interests of the appearance of the development in the interests of the Rural Area and the Chilterns Area of Outstanding Natural Beauty in accordance with the National Planning Policy Framework, Policies CS7 and CS24 and the Countryside Place Strategy of the Dacorum Core Strategy (2013) and saved Policy 97 of Dacorum Borough Local Plan (2004) and for the avoidance of doubt. 4. The planting of the 100 orchard trees must be carried out within one planting season of the first use of the building hereby permitted. Any tree which forms part of the approved landscaping scheme which within a period of 5 years from planting fails to become established, becomes seriously damaged or diseased, dies or for any reason is removed shall be replaced in the next planting season by a tree of the same species, size and maturity . Reason: In the interests of biodiversity and the local environment of the Rural Area and the Chilterns Area of Outstanding Natural Beauty in accordance with the National Planning Policy Framework , Policies CS7, CS24 and CS29 and the Countryside Place Strategy of the Dacorum Core Strategy (2013) and saved Policies 97, ... view the full minutes text for item 5d