Item4d
Resolved
That planning permission be DELEGATED with a view to APPROVAL. That the application be DELEGATED with a view to APPROVAL subject to appropriate assessment in accordance with article 6(3) of the Habitats Directive and securing a mitigation package to avoid any further significant effects on the Chilterns Beechwood Special Area of Conservation (SAC) through financial contributions secured by legal agreement. Condition(s) and Reason (s): 1. The development hereby permitted shall begin before the 6th April 2024. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. No development shall take place until the final design of the drainage scheme is completed and sent to the LPA for approval. The surface water drainage system will be based on the submitted Flood Risk Assessment and Drainage Strategy reference M03001-04_DG04 dated December 2020 prepared by McCloy Consulting. The scheme shall also include: 1. Limiting the surface water run-off rates to a maximum of 2l/s for all rainfall events up to and including the 1 in 100 year + climate change event with discharge into the Thames surface Water sewer. 2. Provide attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change event. 3. Implement drainage strategy to include permeable paving and attenuation tank. 4. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change event, with a supporting contributing area plan. 5. Demonstrate appropriate SuDS management and treatment for the entire site including the access road. To include exploration of source control measures and to include above ground features such as permeable paving. 6. Maintenance and management plan for the SuDS features Reason: To prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and Paragraphs 167 and 169 of the National Planning Policy Framework (2021). 3. (a) The development hereby approved shall be carried out in accordance with the Site Investigation (Phase II environmental risk assessment) report approved under application ref. 22/00785/DRC. (b) The development hereby approved shall be carried out in accordance with the Remediation Method Statement report approved under application ref. 22/03054/DRC. (c) This site shall not be occupied, or ... view the full minutes text for item 4d
Word for word from the decision Dacorum published for this meeting.
Source: democracy.dacorum.gov.uk