23/00423/DPA - Construction of one additional storey of new dwellinghouses above 1-12 and 26-31 Nightingale Walk to provide 6 new residential units (Class C3) - Site Of 1-31 Nightingale Walk Hemel Hempstead Hertfordshire
ApprovedCommittee1 paper
Development Management approved this item on Thursday 10 August 2023. Below is the council's own wording, with the papers it was decided on.
That prior approval be REFUSED. 1. Criteria E The proposals would be very harmful to the immediate streetscape. The provision of an additional storey above the existing development would form a very dominant, visually intrusive and assertive feature in a prominent position at the head of the Berkeley Square cul de sac. This would be detrimental to the appearance of immediate area. The assessment has taken into account the change in levels and the wooded setting. 2. Criteria G The building's increased height and massing would be very visible from several of the existing flat windows creating a greater sense of enclosure. For these flats within the immediate vicinity of the intersection of the two parts of the 'T' shaped layout, this significant change to the existing physical environment would fundamentally alter the existing residents experience and perception. There would be the resultant permanent establishment of an overbearing and oppressive physically intrusive impact in relation to the existing bedroom windows.
Word for word from the decision Dacorum published for this meeting.Source: democracy.dacorum.gov.uk
That prior approval be Granted subject to the imposition of conditions.
Summary
2.1This is not an application for planning permission, but a ‘Prior Approval’ application as referred to by Paragraph 2.4.
2.2The construction of one or two additional storeys at the application site constitutes ‘permitted development’ under Article 3(1) and Schedule 2 Class A of Part 20, Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, subject to prior approval. Where development is ‘permitted development’, planning permission is not required for new dwellinghouses on detached blocks of flats.
2.3The Revised Scheme is in accordance with Paragraph A.1 of Class A. In constituting ‘permitted development’ prior approval is required for a range of matters. The development is permitted development if the LPA grants the prior approval application.
2.4The range of prior approval matters are:
(a) transport and highways impacts of the development; (b) air traffic and defence asset impacts of the development; (c) contamination risks in relation to the building; (d) flooding risks in relation to the building; (e) the external appearance of the building; (f) the provision of adequate natural light in all habitable rooms of the new dwellinghouses; (g) impact on the amenity of the existing building and neighbouring premises including overlooking, privacy and the loss of light; (h) whether due the siting of the building, the development will impact on a protected view identified in the Directions Relating to Protected Vistas dated 15 March 2012 issued by the Secretary of State, (i) where the existing building is 18 metres or more in height, the fire safety of the external wall construction of the existing building, and (j) where the development meets the fire risk condition, the fire safety impacts on the intended occupants of the building and the provisions of paragraph B (prior approval) of this Part apply in relation to that application
It is these matters that are before the Committee for consideration.
2.5Therefore, because of this inbuilt legislative limitation, it is procedurally not possible for an LPA to address other issues which would normally be material considerations when assessing a planning application for a development requiring planning permission. In the case of the current prior approval application a range of issues have been referred to by residents/ the local community, for example the ecological implications, which cannot be considered in the prior approval’s determination by the Committee.
2.6In addition, in assessing this application the LPA is also limited in its procedural remit. An application cannot be determined, expressly or otherwise, on the basis of s38(6) of the Planning and Compulsory Purchase Act 2004 or as though the development plan policies must be applied.
2.7For prior approvals under Schedule 2, Part 20 of the GPDO, the assessment is based with regard to the expectations of National Planning Policy Framework 2021 (the Framework) so far as relevant to the subject matter of the prior approval. For these reasons there is only very limited reference to the Council’s Development Plan policies in the report, unlike consideration and determination of a planning application.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
23/00423/DPA: Construction of one additional storey of new dwellinghouses above 1-12 and 26-31 Nightingale Walk to provide 6 new residential units (Class C3): Site Of 1-31 Nightingale Walk Hemel Hempstead HertfordshireReport
5a23/00423/DPA - Construction of one additional storey of new dwellinghouses above 1-12 and 26-31 Nightingale Walk to provide 6 new residential units (Class C3) - Site Of 1-31 Nightingale Walk Hemel Hempstead HertfordshireThis decision
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.