Resolved
That planning permission be GRANTED. RECOMMENDATION It is recommended that planning permission be granted subject to the conditions below. Condition(s) and Reason (s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: MJT/102 (B) - Proposed Site Plan MJT/103 (C) - Swept Path Details, Car Parking and Visibility MJT/104 (B) - Street Scene Reason : For the avoidance of doubt and in the interests of proper planning. 3. Prior to the first use of the development hereby permitted the vehicular access shall be completed and thereafter retained as shown on drawing MJT/103 (B) in accordance with details/specifications to be submitted to and approved in writing by the Local Planning Authority in consultation with the highway authority in the form of a dropped kerb access. Prior to use appropriate arrangements shall be made for surface water to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. Reason: To ensure construction of a satisfactory development and in the interests of highway safety in accordance with saved Policy 51 of the Dacorum Borough Core Strategy (2004), Policies CS8 and CS9 of the Dacorum Borough Core Strategy (2013) and Paragraph 115 of the National Planning Policy Framework (2023). 4. Prior to the first use of the development hereby permitted a visibility splay shall be provided in full accordance with the details illustrated on the approved drawing number MJT/102 (B). The splay shall thereafter be retained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway. Reason: To ensure construction of a satisfactory development and in the interests of highway safety in accordance with saved Policy 51 of the Dacorum Borough Core Strategy (2004), Policies CS8 and CS9 of the Dacorum Borough Core Strategy (2013) and Paragraph 115 of the National Planning Policy Framework (2023). 5. Prior to the first use of the development hereby permitted any access gate, bollard, chain or other means of obstruction shall be installed to open inwards, set back, and thereafter retained (in perpetuity) at a minimum distance of 6 (may be reduced to ... view the full minutes text for item 5c