CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Dacorum Borough Council
Development Management, Thursday 21 May 2026 at 7.00pm

26/00538/FUL Full planning application for the demolition of existing buildings and structures and construction of 6 dwelling houses with associated access, parking and landscaping. 34 Bourne End Lane, Hemel Hempstead, Hertfordshire, HP1 2RN

Approved Committee 1 paper

AI summaryDacorum Development Management committee delegates approval of six dwellings on Green Belt land at 34 Bourne End Lane, Hemel Hempstead, subject to a Section 106 agreement and conditions.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedSubject to Section 106 and conditions
MoneyS106 contributions per unitSAMM £962.35 plus SANG £4,251.71
What happens nextComplete Section 106 agreementBefore planning permission is granted
Who it affects34 Bourne End Lane, Hemel HempsteadGreen Belt site, 0.23 hectares

What was decided

Planning permission is delegated with a view to approval, subject to a Section 106 legal agreement securing SAMM and SANG contributions, and the conditions set out in the report. Report 1.1, P2, P3

The site is treated as Grey Belt under paragraph 155 of the NPPF, so the proposal is not inappropriate development in the Green Belt despite conflict with Core Strategy Policy CS5. Report 9.31, 10.1

Six four-bedroom two-storey semi-detached dwellings with 16 car parking spaces will replace existing B8 storage and distribution buildings. Report 4.1, 4.2, 9.33

Why

The council cannot demonstrate a five-year housing land supply (approximately one year), triggering the presumption in favour of sustainable development under paragraph 11 of the NPPF. Report 9.25, 9.86, 9.87

The site does not strongly contribute to Green Belt purposes (a), (b) or (d) and is excluded from footnote 7 assets, so it qualifies as Grey Belt previously developed land. Report 9.12, 9.14, 9.15, 9.23

Hertfordshire Highways raises no objection; distances from neighbouring dwellings (51m to 64m) protect residential amenity, and biodiversity net gain can be met through off-site credits. Report 2.4, 9.49, 9.50, 9.55

What happens next

The applicant must complete a Section 106 unilateral undertaking to secure SAMM (£962.35 per unit) and SANG (£4,251.71 per unit) contributions for the Chilterns Beechwoods SAC before permission is granted. Report P2, 9.79, P152, 9.80

Pre-commencement conditions require a Demolition and Construction Management Plan, an Arboricultural Impact Assessment, an Intrusive Site Investigation, and approval of a Biodiversity Gain Plan. Report P197, P201, P206, P219

Before development above slab level, details of materials, hard and soft landscaping, surface water drainage, fire hydrants, EV charging points, and Swift bricks must be submitted for approval. Report P189, P193, P199, P204, P228, P229

The money

  • £962.35 per residential unit SAMM contribution to Chilterns Beechwoods SAC Report P152, 9.79
  • £4,251.71 per residential unit SANG contribution to Chilterns Beechwoods SAC Report P152, 9.79
  • £236.22 per square metre CIL liability rate for zone 2 Report 9.84, P161

Options considered

  • Chosen: Approve with Section 106 and conditions (delegated). Site qualifies as Grey Belt, housing supply is approximately one year, no significant harm identified Report 1.1, 9.31, 10.1, P163
  • Rejected: Refuse on Green Belt grounds. Site meets paragraph 155 NPPF tests and NPPF carries more weight than Core Strategy Policy CS5 Report 9.31

Implications

  • Legal: Section 106 unilateral undertaking required to secure SAMM and SANG mitigation before permission is granted. Report P2, 9.80
  • Environment and climate: Biodiversity net gain of at least 10% must be delivered, partly through off-site credits, with a Biodiversity Gain Plan required. Report 9.67, 9.70, P206
  • Equalities: Dacorum Refuse Storage Guidance is met; first-floor bathroom windows on Plots 2, 3, 4 and 5 must be obscure-glazed to protect neighbour privacy. Report 2.4, 9.39, P231
  • Risk: Site contamination requires an Intrusive Site Investigation Risk Assessment and Remediation Strategy before development begins. Report P219, P221, P226
  • Other: Hertfordshire Highways confirmed no objection following swept path analysis for fire tender access. Report 9.58, 10.6

Who and where

  • Neighbouring residents at 34, 36, 38, 40, 42, 44a and 44b Bourne End Lane Report 9.49, 9.50
  • Residents of 33 Horseshoe Close (Bourne End Mills redevelopment) Report 9.52
  • Future occupants of the six four-bedroom dwellings Report 4.1
  • Chilterns Beechwoods Special Area of Conservation Report 9.18, 9.77

Timeline

  • 2025-08-07: Prior approval granted under 25/01440/AFU for change of use to B8 (storage and distribution) Report 5.1, P22
  • 2025-08-18: Appeal allowed at 20 Bourne End Lane for three self-build plots (APP/A1910/W/25/3363288) Report 5.3
  • 2026-01-19: Preliminary Ecological Appraisal prepared by Arbtech Consulting Limited Report 9.62
  • 2026-04-15: Biodiversity Net Gain Assessment updated by Arbtech Consulting Limited Report 9.71, P216
  • 2026-05-21: Dacorum Development Management committee delegates approval subject to Section 106 and conditions Report 1.1

Plain English for the jargon

  • Grey Belt: Land in the Green Belt that is previously developed and does not strongly contribute to purposes (a), (b) or (d) of the Green Belt, where development is not inappropriate under paragraph 155 of the NPPF.
  • SAMM: Strategic Access Management and Monitoring, a financial contribution towards managing visitor pressure on the Chilterns Beechwoods Special Area of Conservation.
  • SANG: Suitable Alternative Natural Greenspace, land provided as an alternative to designated sites to reduce recreational pressure on the Chilterns Beechwoods SAC.
  • Section 106: A legal agreement under Section 106 of the Town and Country Planning Act 1990 used to secure planning obligations such as financial contributions.
  • CIL: Community Infrastructure Levy, a charge on new development based on floor area, used to fund local infrastructure.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item5d

Resolved

That planning permission be DELEGATED WITH A VIEW TO APPROVAL. RECOMMENDATION That planning permission be DELEGATED with a view to APPROVAL subject to: The completion of a planning obligation under Section 106 of the Town and Country Planning Act 1990 to secure Strategic Access Management and Monitoring (SAMM) and Suitable Alternative Natural Greenspace (SANG) contributions in accordance with the Chilterns Beechwoods Special Area of Conservation Mitigation Strategy (2022); and The conditions set out in this report. Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: OAKPL-115A (Existing Location Plan) OAKPL-115B Rev. A (Proposed Site Plan) OAKPL-115C (Proposed Elevations Plots 1 & 2) OAKPL-115D (Proposed Elevations Plots 3 & 4) OAKPL-115E (Proposed Elevations Plots 5 & 6) OAKPL_115F (Proposed Floor Plans Plots 1 – 6) Reason: For the avoidance of doubt and in the interests of proper planning. 3. No development above slab level shall take place until details of the materials to be used in the construction of the external surfaces of the buildings hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). INFORMATIVE Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection. 4. No development above slab level shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority. These details shall include: · all external hard surfaces within the site; · other surfacing materials; · means of enclosure; · soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs; · minor artefacts and structures (e.g. furniture, play equipment, signs, refuse or other storage units, etc.); and · retained historic landscape features and proposals for restoration, where relevant. The approved planting must be carried out within one planting season of completing the development, and the approved hard landscape works shall ... view the full minutes text for item 5d Media
Word for word from the decision Dacorum published for this meeting. Source: democracy.dacorum.gov.uk

Follow this further

Built from Dacorum's papers

What the report saysPro

Report to Development Management

Recommendation

1.1That planning permission be DELEGATED with a view to APPROVAL subject to:

 The completion of a planning obligation under Section 106 of the Town and Country Planning Act 1990 to secure Strategic Access Management and Monitoring (SAMM) and Suitable Alternative Natural Greenspace (SANG) contributions in accordance with the Chilterns Beechwoods Special Area of Conservation Mitigation Strategy (2022); and

 The conditions set out in this report.

Summary

2.1The proposal for the development of six dwellings would represent the utilisation of Grey Belt land for the purposes of assessment under national Green Belt policy (NPPF). Through the NPPF, the Government has placed strong emphasis on the provision of housing, particularly in areas where there is an identified shortfall of a five-year housing land supply on deliverable sites. The development would therefore be acceptable in principle with regards to its Green Belt designation.

2.2There would be no objection to the loss of the existing lawful B8 (storage and distribution) use on the land.

2.3The proposal would maintain a suitable distance from surrounding existing dwellings and residential schemes currently under consideration so that residential amenity would not be compromised.

2.4The level of car parking provision proposed to be provided on the site would be satisfactory and an existing access would be utilised. Storage of refuse would also be acceptable in accordance with the Dacorum Refuse Storage Guidance Note. There would be no resultant adverse impacts on the surrounding highway network. No objection has been raised by Hertfordshire Highways.

2.5The development lies within the Zone of Influence for the Chilterns Beechwoods Special Area of Conservation; however, the requisite SAMM and SANG contributions can be secured through a legal agreement. The proposal would satisfy biodiversity net gain, some of which would be provided for off-site so that the development would be policy compliant (subject to condition).

3. SITE DESCRIPTION

3.1The application site comprises a parcel of land of 0.23 hectares situated on elevated ground beyond the rear of the terrace at Nos. 36 to 42 Bourne End Lane. It lies within the Green Belt with its access between residential properties in the village of Bourne End. 3.2 It comprises a largely open area with single-storey perimeter buildings in lawful B8 (storage and distribution) use. It has an open boundary to the open grassed area immediately west and strong landscaped boundaries with conifer trees to its eastern side and hedging with interspersed trees to its northern rear boundary. Access to the site is existing, via the north-western side of Bourne End Lane, running alongside the flank wall and rear garden of No 34 Bourne End Lane. The access adjoins another existing access, which serves a parcel of land between the application site and the terrace row at Nos. 36 to 42 Bourne End Lane.

3.3Surrounding land uses are predominantly residential. The site is surrounded by two open parcels of land on its south-western and south-eastern sides, with two-storey housing directly south on Horseshoe Close as part of the Bourne End Mills redevelopment. There are dwellings located to the east of the site. The site is separated from the dwellings to the north on London Road (A4251) by an open parcel of land of a similar size to the application site. Directly north-west of the site is a large field in agricultural use, separated from this part of Bourne End Lane by thick landscaping.

4. PROPOSAL DESCRIPTION

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
26/00538/FUL Full planning application for the demolition of existing buildings and structures and construction of 6 dwelling houses with associated access, parking and landscaping. 34 Bourne End Lane, Hemel Hempstead, Hertfordshire, HP1 2RNReport 765 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Dacorum

Search all
  1. 26/00538/FUL Full planning application for the demolition of existing buildings and structures and construction of 6 dwelling houses with associated access, parking and landscaping. 34 Bourne End Lane, Hemel Hempstead, Hertfordshire, HP1 2RNThis decision
  2. 25/01880/MOA Hybrid application (with access details of two main access points from Bulbourne Road and Station Road in Full and the main development on the rest of the site in Outline with all matters reserved) for the demolition of all exiRefused
  3. 25/00549/MFA Redevelopment of the former Hemel Hempstead Gasworks site, proposing full planning permission for the construction of 11 residential buildings (three to eight storeys) (485 proposed residential units) with amenity spaces, ancilApproved
  4. 23/02034/MFA - Hybrid planning application comprising (i) Full application for the construction of 57 dwellings (Use Class C3), (including affordable housing), 59 no.Approved
  5. 20/01355/MFA - FULL PLANNING APPLICATION FOR THE CONSTRUCTION OF A SINGLE STOREY, SINGLE CHAPEL CREMATORIUM WITH ASSOCIATED PARKING, LANDSCAPING AND INFRASTRUCTURE. Land South Of Bedmond Road Hemel Hempstead HertfordshireApproved
  6. 20/00631/FUL - Construction of new dwelling with access via existing driveway. Demolition of existing garage and construction of two new detached double garages. - Fullers Cross Oak Road Berkhamsted Hertfordshire HP4 3NAApproved

More from Dacorum Development Management

All decisions
MeetingDecisionOutcome
10 Sep 2026 25/02075/FUL Proposed change of use from 1no. dwellinghouse operating within Use Class C3 to 1no. Small Residential Care Home operating within Use Class C2That planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED subject to the conditions set... Approved Open
13 Aug 2026 26/01005/FUL Construction of dwelling (self build) and associated landscaping at Land adjacent 25 Peter's Place 25 Peters Place, Northchurch, Berkhamsted, HertfordshireThat planning permission be DELEGATED with a VIEW TO APPROVAL . RECOMMENDATION That planning permission be DELEGATED ... Approved Open
13 Aug 2026 26/00379/FUL Installation of Timpson Key Cutting Kiosk to hardstanding adjacent to Tesco Superstore TESCO, London Road, Tring, HertfordshireThat planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED. Condition(s) and Reason(s): ... Approved Open
16 Jul 2026 26/00885/FUL Creation of Two Additional Gypsy/Traveller Pitches comprising a single mobile home and Touring Caravan and Construction of a Shared Day Room Land on the North Western side of Green Lane, MarkyateThat planning permission be DELEGATED with a VIEW TO APPROVAL . RECOMMENDATION It is recommended that planning permis... Approved Open
16 Jul 2026 25/01407/ROC Variation of Condition 2 (Approved Plans) attached to planning permission 22/02538/FUL (Replacement Dwelling) allowed on appeal under APP/A1910/W/23/3327060 Frithsden Vineyard, Frithsden Lane, Frithsden, Hemel Hempstead, Hertfordshire, HP1 3DDThat planning permission be GRANTED. RECOMMENDATION That planning permission be GRANTED, subject to the below conditi... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies