Item142
Resolved
(a) That Application No DOV/19/00425 be APPROVED subject to the following conditions: (i) 3-year time limit to commence development; (ii) The development to be in accordance with the submitted drawings; (iii) Full details to be submitted of how the development will dispose of foul and surface water drainage; (iv) Details of existing and proposed site levels shall be submitted for approval; (v) A Construction Management Plan to be submitted for approval; (vi) Samples of the building and hard-surfacing materials to be submitted for approval; (vii) The retention of parking, cycling and garaging spaces; (viii) The provision of refuse and recycling storage; (ix) No surface water run-off allowed onto the highway; (x) The upper floor window in the side elevation to be obscure glazed; (xi) No additional windows to be permitted; (xii) The removal of permitted development rights to extend, alter the roof or to erect an outbuilding; (xiii) Boundary enclosures to be submitted for approval; (xiv) No living accommodation shall be situated on the ground floor, and all living accommodation shall be located on the upper floors, at a minimum level of 4.2 metres ODN or above; (xv) The finished threshold level of the ground floor shall be no less than 150mm above the finished external ground level of the site; (xvi) Details of measures to mitigate the potential risks from flooding shall be submitted for approval. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary wording in line with the recommendations and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk