Item144
Resolved
(a) That Application No DOV/20/00211 be APPROVED subject to the following conditions: (i) 3-year time limit; (ii) Approved plans; (iii) Samples of materials; (iv) Provision of parking facilities; (v) Measures to prevent the discharge of surface water onto the highway; (vi) Pre-commencement condition for Construction Management Plan; (vii) Use of bound surface for the first 5 metres of the access from the edge of the highway; (viii) Provision and maintenance of a visibility strip measuring 2.4 metres in width from the edge of the carriageway along the site frontage with no obstructions over 1 metre above carriageway level within the strip, prior to use of the site commencing; (ix) Provision and maintenance of 1 metre x 1 metre pedestrian visibility splays behind the footway on both sides of the access with no obstructions over 0.6 metres above footway level, prior to the use of the site commencing; (x) Cycle parking details; (xi) Bin storage; (xii) Completion of access prior to first use; (xiii) Removal of permitted development rights (classes A, B, D and E); (xiv) Surface water disposal scheme; (xv) Foul water drainage scheme; (xvi) Submission of a landscaping scheme; (xvii) Boundary treatments and hard-surfacing materials. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk