AGREED- that (A) the Panel notes the report with respect to the conclusions reached relating to hazard marker posts and a kerb build out; and (B) agrees to fund a further investigation to see if it will be possible to raise the kerbs over the 15m section between numbers 5 and 7 St Mary’s Lane.
Word for word from the decision East Hertfordshire published for this meeting.Source: democracy.eastherts.gov.uk
1.1To update members of the Panel on progress with resolving reported traffic issues in St Mary’s Lane, Hertingfordbury.
Background
2.1The Panel will be aware that there has been considerable discussion and investigations to date into attempts to resolving the reported traffic issues in St Mary’s Lane, Hertingfordbury. Officers have presented reports to previous HJMPs from 7 July 2008 and most recently at its meeting on 8 October 2010.
2.2At its meeting on 8th October 2010, the Panel agreed that officers:-
(a) do not progress any further the single directional traffic on Hertingfordbury Lane and St Mary’s Lane.
(b) consider the installation of hazard marker posts at a reduced offset from the edge of carriageway with the proviso that they will have to be removed if constantly damaged and hence become a maintenance burden.
(c) carryout a feasibility study to determine the extent by which existing kerbs can be raised without affecting drainage, together with any accommodation works that may be necessary.
(d) carryout a feasibility study into the option of installing a ‘give way build out’ – somewhere in the vicinity of numbers 1 to 15 St. Marys Lane. .
2.3Officers have now sought initial safety advice on the proposals mentioned above, which is attached at Appendix A and summarised below:
2.3.1 The installation of hazard marker posts Hazard marker posts are likely to have a detrimental affect for pedestrians and footway users and may force users to walk in the carriageway where visibility around the bend is reduced, increasing the risk of pedestrian/vehicle conflicts. The minimum width of footway we aim to retain is 1.2m, and there is nowhere along this section that will provide 1.2m should marker posts be installed.
Generally, hazard marker posts should be installed 450mm from the carriageway edge, consideration was given to reducing this offset to maximise the available footway width. However observations by the Safety Engineer suggest that, although driving on the footway should not be condoned, because the available carriageway width is so narrow, the likelihood is that the bollards would be damaged on a regular basis and there may be an increased risk of head on type conflicts, albeit at slower speeds.
2.3.2 Raising the kerbs The present average kerb height is 29mm and to prevent vehicle overrun it should ideally be between 100mm to 125mm.
In practice, to raise the kerb height means creating a backfall (slope) towards the properties, whereas the norm is for footways to fall, and hence drain, towards the road. In this case a backfall would cause the water to fall towards the properties and hence require a drainage system to capture the surface water run off.
To install a drainage system in the footway immediately adjacent to the boundary walls would be extremely difficult over this length, because, to ensure the drainage system is effective it needs to have a fall from its start point to its end point, known as the longfall. There are various types of system that could be considered from a proprietary u-shaped drainage channel which incorporates a fixed grill lid to an open v-channel type system which would require gullies and connecting pipework to a suitable outfall.
The current levels at the rear of the footway vary and the presence of vehicle crossovers that are a lower level than the rest of the footway means creating an effective longfall would be extremely difficult.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.