Resolved
RESOLVED – that in respect of application 3/11/1391/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
Development Management Committee decided this item on Wednesday 12 October 2011. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that in respect of application 3/11/1391/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
That planning permission be GRANTED subject to the following conditions:-
1. Three Year Time Limit (1T12)
2. Levels (2E05)
3. Approved Plans (2E10):10324-003E and 10324-001-Q.
4. Samples of Materials (2E12)
5. Withdrawal of PD Rights Part 1 Class A. (2E20)
6. Withdrawal of PD Rights Part 1 Class E. (2E22)
7. Materials arising from demolition (2E32)
8. Landscape Design Proposals (4P12) (e, h, I, j, k, l)
9. Landscape Implementation (4P13)
10. All Mitigation and Compensation Measures ( Section 5.2, 5.3 and 5.4 of the submitted Bat Report, September 2011 by ELMAW Consulting for the protection of bats identified on the site shall be carried out prior to any works commencing on site or in accordance with a timetable to be agreed by the local planning authority in writing.
Reason: To protect the habitats of bats which are an indicator European protected species under the Wildlife and Access to the Countryside Act 1981, and in accordance with policy ENV16 of the East Herts Local Plan Second Review April 2007 and Planning Policy Statement 9: Biodiversity and Geological Conservation 2005. 3/11/1391/FP
Directives
1. Other Legislation (01OL)
Summary of Reasons for Decision The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular policies GBC1, ENV1, ENV2, ENV5, ENV13, ENV14, ENV16, BH1 and HSG8 and Planning Policy Guidance 2: Green Belts. The balance of the considerations having regard to those policies and the previous approval of 3/09/1923/FP is that permission should be granted.
(139111FP.SD)
1.1The application site is shown on the attached OS extract. It is situated within the Metropolitan Green Belt in an isolated location within the rural landscape setting on the northern side of Pembridge Lane, east of Brickendon.
1.2The site (approximately 18.6 hectares) comprises an access driveway through a copse of woodland leading from the highway to a domestic garden curtilage and hard standing surrounding a single detached two storey dwelling constructed in 1964.
1.3The property has been largely unimproved and is of poor construction, originally constructed as an agricultural workers dwelling some 50 years ago. In 2008, a certificate of lawfulness was granted to confirm that the agricultural restriction on the dwelling had been breached for a period in excess of 10 years and was therefore lawful (ref: 3/08/1834/CL). A replacement dwelling was approved in 2010 (ref: 3/09/1923/FP) for the demolition of the existing dwelling which was of poor construction not capable of retention by reason of its poor structural integrity and failed foundations and the construction of a replacement two storey dwelling on the existing footprint. This permission was not implemented.
1.4The current proposal again comprises the demolition of the existing dwelling with a full replacement dwelling on the same footprint with modest infill areas to the front and rear elevations, sited 1.0m lower in the ground to maintain the 3/11/1391/FP
roof height of the original dwelling on the site of 8.5m. It would be of the same form as the previous approval for a replacement dwelling under ref:3/09/1923/FP
1.5However, this proposal also comprises additional development in the form of:-
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/11/1391/FP: Demolition of existing dwelling and erection of detached replacement dwelling with basement, glazed link, triple garage and covered swimming pool at Hedgegrove Farm, Pembridge Lane, Brickendon, Broxbourne Herts EN10 7QR for Mr L WilliamsonReport | 64 KB | DownloadRead as text |
PDF |
Hedgegrove FarmReport | 202 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.