Resolved
RESOLVED – that in respect of application 3/12/0200/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
Development Management Committee decided this item on Wednesday 23 May 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that in respect of application 3/12/0200/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
That planning permission be GRANTED subject to the following conditions:
1. Three Year Time Limit (1T12)
2. Approved Plans (2E10) - 10567/S/001, 105676 - P003-A , and 10567- P004
3. Samples of materials (2E13)
4. New Doors and Windows (2E34)
5. Construction parking and storage (3V22)
6. Tree and Boundary Hedge retention and protection (4P05)
7. Tree and natural feature protection : fencing (4P07)
8. Tree protection : Excavations (4P09)
9. Programme of archaeological work (2E02)
10. No development shall take place until the details of a bat survey have been submitted to and approved in writing by the local planning authority. The development shall then be carried out in accordance with the details approved and any mitigation measures contained therein.
Reason: To protect the habitats of bats which are a protected species under the Wildlife and Access to the Countryside Act 1981, and in accordance with Policy ENV16 of the East Herts Local Plan Second Review April 2007.
Directive: 1. Other legislation (01OL)
Summary of Reasons for Decision
The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007, in particular policies GBC1, HSG8, HSG7, ENV1, ENV11, TR7) and the National Planning Policy Framework. The balance of the considerations having regard to those policies and the previous grant of permission under ref: 3/11/0985/FP) is that permission should be granted.
(020012.SD)
1.1The application site is shown on the attached OS extract. It is sited to the north of the livery/stud yards at Epping Green with a separate wall and gated vehicular access from the adjacent highway, Church Road. The property is centrally located within the curtilage, screened by tall leylandii front boundary hedge in excess of 4metres in height.
1.2The residential dwelling, built in the 1940’s is a detached, two storey property, constructed in brick and tile with a garage sited next to the dwelling. The residential curtilage is clearly defined, with a further 1.3 hectares of agricultural land, laid to meadow, to the north and west of the house in the applicant’s ownership. To the rear is a manege in the ownership of the adjoining property.
1.3The application comprises the replacement of the existing dwelling, relocated in a slightly different position 8.0m to the north to prevent overlooking of the neighbouring stud farm. The proposal also includes the addition of a single storey rear glazed orangery (3.6m x 8.7m) with skylight roof, and a basement under the main two storey part of the house with internal access, providing leisure facilities.
1.4Planning permission for a replacement dwelling, without basement and rear orangery, was approved in 2011 on the footprint of the existing house (ref: 3/11/0985/FP). This permission was granted following the submission of detailed evidence from an independent surveyor which concluded that the existing property is in a structurally poor condition.
1.5The current application is a amended scheme, following that approval, which involves re-siting the replacement dwelling further away from the adjacent stud farm and the inclusion of a basement and orangery at the site. 2.0 Site History:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/12/0200/FP: Replacement dwelling amended scheme with new location for replacement dwelling, incorporating a rear orangery extension and basement at Epping Green Farmhouse Epping Green, Herts SG13 8NE for Mr L EaglestoneReport | 55 KB | DownloadRead as text |
PDF |
3120200FP PlanReport | 155 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.