East Hertfordshire District Council
Development Management Committee, Wednesday 27 February 2013 at 7.00pm

3/11/1355/FP – Proposed new 2 bed bungalow and new crossover at rear of White Lion House, Furneux Pelham, SG9 0LH for Mr L Dawson

Decided Committee 3 papers

Development Management Committee decided this item on Wednesday 27 February 2013. Below is the council's own wording, with the papers it was decided on.

Item624

Resolved

RESOLVED – that in respect of application 3/12/1355/FP, planning permission be granted subject to the conditions detailed in the report now submitted and subject to the following additional condition: 15. Levels (2E05) insert after proposed building ‘and the existing adjacent dwelling to the south known as Appaloosa’ shall be…
Word for word from the decision East Hertfordshire published for this meeting. Source: democracy.eastherts.gov.uk

Follow this further

Built from East Hertfordshire's papers

What the report saysPro

Report to Development Management Committee

Recommendation

That planning permission be GRANTED subject to the following conditions:

1. Three year time limit (1T121)

2. Samples of materials (2E123)

3. Programme of archaeological works (2E023)

4. No development shall take place until a Construction Method Statement has been submitted to, and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:

1. Methods for accessing the site; 2. The parking of vehicles of site operatives and visitors; 3. Loading and unloading of plant and materials; 4. Storage of plant and materials used in constructing the development; 5. The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; 6. Wheel washing facilities; 7. Measures to control the emission of dust and dirt during construction; 8. A scheme for recycling/disposing of waste resulting from demolition and construction works.

Reason: To ensure that the construction works and associated activity are acceptable in terms of amenity of the area and highway safety.

5. Withdrawal of PD Part 1 Class A (extensions and alterations) (2E131)

6. Withdrawal of PD Part 1 Class E (incidental structures) (2E223)

7. Landscape design proposals (4P12) (insert:-a, b, e, I, j, k, l) 3/11/1355/FP

8. Landscape works implementation (4P13)

9. The development hereby approved, shall be carried out in accordance with the Arboricultural Implications Assessment Arborticultural Methods Statement and Tree Protection Measures report dated May 2011 by Open Spaces Landscape.

Reason: In the interests of protected trees within the site, in accordance with policy ENV11 of the East Herts Local Plan Second Review April 2007.

10. Provision and Retention of parking space (3V234)

11. Prior to the first beneficial use of the access, an area of land across the site frontage measuring 2.0metres from and parallel to the nearside edge of the adjacent road carriageway shall be provided and thereafter kept clear of all obstruction to visibility over a height of 1.05m above the adjoining road channel level.

Reason: To ensure appropriate visibility between the existing highway and the proposed access in the interests of highway safety and convenience.

12. Prior to the commencement of the development, details of the gradient of the access shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details.

Reason: In the interests of the free flow and safety of other traffic on the highway.

13. Construction hours of working (6N07)

14. Approved plans (2E103) (insert:- 289.01G, 289.02b)

Directives:

1. Other legislation (010L1)

2. Unsuspected contamination (33UC)

3. Street Naming and Numbering (19SN) 3/11/1355/FP

Summary of Reasons for Decision

East Herts Council has considered the applicant’s proposal in a positive and proactive manner with regard to the policies of the Development Plan (Hertfordshire County Structure Plan, Minerals Local Plan, Waste Core Strategy and Development Management Policies DPD 2012 and the ’saved’ policies of the East Herts Local Plan Second Review April 2007 and in particular policies GBC2, GBC3, HSG7, OSV2, ENV1, ENV2, ENV9, ENV11, BH1, BH2, BH3, BH6 and TR7); the National Planning Policy Framework and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2012. The balance of the considerations having regard to those policies is that permission should be granted.

(135511FP.MP)

Background

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/11/1355/FP: Proposed new 2 bed bungalow and new crossover at rear of White Lion House, Furneux Pelham, SG9 0LH for Mr L DawsonReport 71 KB DownloadRead as text
PDF
3111355FP White Lion House PlanReport 114 KB Download
PDF
ERPA White Lion HouseReport 390 KB Download

At this meeting

Whole meeting

More from East Hertfordshire Development Management Committee

All decisions
MeetingDecisionOutcome
12 Aug 2026 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... Decided Open
12 Aug 2026 Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... Noted Open
15 Jul 2026 Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... Decided Open
15 Jul 2026 Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... Decided Open
15 Apr 2026 Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies