Resolved
RESOLVED – that in respect of application 3/13/0901/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
Development Management Committee decided this item on Wednesday 14 August 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that in respect of application 3/13/0901/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
That planning permission be GRANTED subject to the following conditions:
1. Time limit (1T121)
2. Approved plans (2E103) – insert 5397/A3/201; 5397/A3/202; 5397/A0/300; 5397/A0/301; 5397 100; 5397 001; 5397 002; 5397 003; 5397 200A; GSK/S/354/1
3. Programme of archaeological work (2E025)
4. Tree and hedge retention and protection (4P055)
Directives: 1. Other legislation (01OL1)
2. Groundwater protection zone (28GP1, Musley Lane Pumping Station)
Summary of Reasons for Decision
East Herts Council has considered the applicant’s proposal in a positive and proactive manner with regard to the policies of the Development Plan (Minerals Local Plan, Waste Core Strategy and Development Management Policies DPD 2012 and the ’saved’ policies of the East Herts Local Plan Second Review April 2007); the National Planning Policy Framework and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2012 (as amended). The balance of the considerations having regard to those policies is that permission should be granted.
(3130901FP.MC) 3/13/0964/FP
1.1The application site is shown on the attached OS extract. It is an area of cleared land adjacent to the north boundary of the GSK site with Park Road. Two buildings (designated P8 and P10) that stood on the site were demolished approximately 5 years ago.
1.2The whole GSK site is a designated Employment Area within the Local Plan and is reserved for general industrial, research and development and employment development.
1.3The proposed building would be a two-storey structure with the main roof having a ridge height of 9.5 metres high, and the tallest element being approximately 10 metres high. The walls would mainly be timber clad with areas of white render and stone construction. The pitched roofs would be aluminium with the south-facing slopes covered in photovoltaic panels. There would be a flat roof over part of the ground floor to the south which would be planted to create a green roof.
1.4The building would house four, mainly storage, functions currently located in separate areas throughout the site. Samples of manufactured products would be stored in the building, as would documents relating to GSK’s operations. The equipment maintenance team would be based in the new building, as would the site’s emergency response team and their equipment.
1.5The building would incorporate photovoltaic panels, a ground-to-air heat exchanger and be connected to the site’s combined heat and power plant. The intention is to offset the CO2 production associated with the ongoing use of the building through these means, resulting in a zero carbon building.
2.0Site History:
2.1The GlaxoSmithKline site has been the subject of a considerable number of applications. There have been no recent applications specifically relating to the application site itself.
3.0Consultation Responses:
3.1Affinity Water have advised that the application site is within the groundwater protection zone of Musley pumping station. A directive advising the applicant of their responsibilities is recommended.
3.2Hertfordshire County Council’s Historic Environment Unit have reviewed 3/13/0964/FP
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/13/0901/FP: Erection of two-storey central archive building on site of demolished buildings P8 and P10 adjacent to northern site boundary, with modifications to road layout to interior of site, landscaping, installation of proposed earth ducts and other works for GlaxoSmithKline Services Ltd, PriReport | 127 KB | DownloadRead as text |
PDF |
3130901FP PlanReport | 231 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.