CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
East Hertfordshire District Council
Development Management Committee, Wednesday 9 October 2013 at 7.00pm

3/13/1348/FN – Indoor tennis centre incorporating indoor courts, pool, gym and outdoor facilities including outdoor swimming pool, tennis courts and golf range (Renewal of Planning Approval with Conditions ref: 3/08/1465/FP) at Land west of

Decided Committee 2 papers

Development Management Committee decided this item on Wednesday 9 October 2013. Below is the council's own wording, with the papers it was decided on.

Item279

Resolved

RESOLVED – that, subject to a deed of variation in respect of the unilateral obligation dated 6 September 2010 to ensure that its requirements are properly related to this proposal and to cover the highway related matters detailed in the report now submitted , in respect of application 3/13/1348/FN, planning permission be granted subject to the conditions detailed in the report now submitted.
Word for word from the decision East Hertfordshire published for this meeting. Source: democracy.eastherts.gov.uk

Follow this further

Built from East Hertfordshire's papers

What the report saysPro

Report to Development Management Committee

Recommendation

That, subject to a deed of variation in respect of the Unilateral Obligation dated 6 September 2010 to ensure that its requirements are properly related to this proposal and to cover the following:

1. The provision, prior to the commencement of works on the site, of the following highway related matters:

a) Widening of Welwyn Road at the proposed vehicular access to provide a right hand turning lane, pedestrian refuge islands, and appropriate white line markings. b) The provision of a shared use cycle/ pedestrian way alongside Welwyn Road from the point of access into the development to the western end of the existing footway and the widening and conversion of the existing footway for shared use between its western end and Windsor Drive including all administrative and legal costs of that conversion. c) Provision of streetlighting on Welwyn Road from the western end of the existing streetlighting to a point just west of the access junction improvement mentioned at (a) above. d) The bearing of all costs by the developer of introducing a 30mph speed limit over al length of Welwyn Road from the westernmost point of the new streetlighting (point c) above) to the existing 30mph limit near Thieves Lane together with such other highway warning signage as appropriate. e) The provision of a bus stop and shelter on the northern side of Welwyn Road at least 120m east of the proposed junction, and the provision of a bus stop, shelter and section of footway on the southern side of Welwyn Road together with green carriageway surfacing. Neither shelter shall have any illuminated advertisements. 3/13/1348/FN

2. The provision and dedication of footpaths within the site, linking Sele Farm estate with BR11 and FP61.

3. The provision and implementation of a landscaping scheme, together with a scheme of management for the landscaping of the whole site, including the retention of the public open space recreation areas and the retention, protection of and long term maintenance of the County Wildlife Site and a commitment that such land will be safeguarded against the provision of any further building.

4. The provision of a community package providing free and/or reduced cost access for schools and the local community to the club facilities.

5. The provision of a financial contribution of £55000 towards public transport infrastructure improvements:

The Director of Neighbourhood Services be authorised to GRANT planning permission subject to the following conditions:

1. Three Year Time Limit (1T12)

2. Approved plans (2E10) (1940-P(0)003D, 1940-P(0)004D, 1940- P(0)005C, 1940-P(0)0006C, 1940-P(0)001A, 40230(60)601)

3. Boundary walls and fences (2E07) insert ‘including catch and security fencing’

4. Materials of construction (2E11)

5. Levels (2E05)

6. Refuse disposal facilities (2E27)

7. No external loudspeakers (2E25)

8. No external lighting (2E26) insert ‘with the exception of the lighting shown on the plan approved hereby’

9. Cycle Parking facilities (2E29) insert ‘for a minimum of cycles’

10. Approved accesses only (3V04)

11. Existing access closure (3V05)

12. Hard surfacing (3V21) 3/13/1348/FN

13. Construction parking and storage (3V22)

14. Wheel washing facilities (3V25)

15. Green Travel Plans (3V27) insert ‘The approved Travel Plan shall be implemented and retained in force.’

16. Tree retention and protection (4P05)

17. Hedge retention and protection (4P06)

18. Landscape design proposals (4P12)

19. Landscape works implementation (4P13)

20. Construction hours of working plant and machinery (6N07)

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/13/1348/FN: Indoor tennis centre incorporating indoor courts, pool, gym and outdoor facilities including outdoor swimming pool, tennis courts and golf range (Renewal of Planning Approval with Conditions ref: 3/08/1465/FP) at Land west of Sele Farm Estate, Welwyn Road, Hertford, Hertfordshire forReport 217 KB DownloadRead as text
PDF
3131348FN PlanReport 306 KB Download

At this meeting

Whole meeting
278Minutes – 11 September 2013Decided
2793/13/1348/FN – Indoor tennis centre incorporating indoor courts, pool, gym and outdoor facilities including outdoor swimming pool, tennis courts and golf range (Renewal of Planning Approval with Conditions ref: 3/08/1465/FP) at Land west ofThis decision
2803/13/1341/SV – Discharge of Section 52 Agreement (Section 106) obligation relating to the agricultural occupancy of Brookfield Farm, West End Road, Wormley West End, Broxbourne, Herts , EN10 7QN for Mr J SmithAgreed 2813/13/1196/FP – Change of use from B8 use (Storage and Distribution) to B1 (Business/light industrial) and Class B8 use at Units 10 and 11 Haslemere Industrial Estate, Pig Lane, Bishop's Stortford, CM23 3HG for Threadneedle Property Investments LtdDecided 2823/13/1200/FP – Change of use from B1(Business/light industrial) to B1 and B8 (Storage and Distribution) at Unit 5 Haslemere Industrial Estate, Pig Lane, Bishop's Stortford, CM23 3HG for Threadneedle Property Investments LtdApproved 2833/13/1331/FP – Erection of two storey detached building comprising of 2no. three bedroom houses, together with private amenity space and car parking at garage site to the north of 38 Gatwick Close, Bishop's Stortford, CM23 5DL for South Anglia Housing GroupOn the agenda 284Public Speaking Arrangements for Development Management Committee Meetings dealing with Development Proposals for Land at Bishop's Stortford NorthDecided 285Validation Requirements For Planning and Listed Building Consent Applications – Local List ConsultationApproved 286Items for Reporting and NotingNoted

More from East Hertfordshire Development Management Committee

All decisions
MeetingDecisionOutcome
12 Aug 2026 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... Decided Open
12 Aug 2026 Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... Noted Open
15 Jul 2026 Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... Decided Open
15 Jul 2026 Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... Decided Open
15 Apr 2026 Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies