Resolved
RESOLVED That the level of Building Control charges be increased in accordance with the Local Government Association Model Scheme under The Building (Local Authority) Regulations 1998.
Lincs Building Consultancy Executive Board decided this item on Monday 26 January 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED That the level of Building Control charges be increased in accordance with the Local Government Association Model Scheme under The Building (Local Authority) Regulations 1998.
Appendix I
LINCS BUILDING CONSULTANCY
SCHEME FOR THE RECOVERY OF BUILDING REGULATION COSTS AND ASSOCIATED MATTERS
FOR LINCS BUILDING CONSULTANCY
IN PARTNERSHIP WITH
NORTH EAST LINCOLNSHIRE COUNCIL
AND
EAST LINDSEY DISTRICT COUNCIL
TO BE READ IN CONJUNTION WITH THE BUILDING [LOCAL AUTHORITY CHARGES] REGULATIONS 1998
Numbers e.g. (1) in the text relate to correspondingly numbered guidance notes.
Date this Scheme came into effect: 1st January 2009
1 SCHEME FOR THE RECOVERY OF COSTS
Principles of this Scheme
Charges have been set for the functions prescribed in Regulation 4 of the Building (Local Authority Charges) Regulations 1998, namely: -
• A plan charge, payable when plans of the building work are deposited with the Authority.
• An inspection charge, payable on demand after the Authority carry out the first inspection in respect of which the charge is payable.
• A Deferred Payment, where an inspection charge is not payable and is deferred until the completion of the construction work.
• A building notice charge, payable when the building notice is given to the Local Authority.
• A reversion charge, payable for building work in relation to a building:-
1. Which has been substantially completed before plans are first deposited with the Authority in accordance with Regulation 20 of the Approved Inspectors Regulations, or
2. In respect of which plans for further building work have been deposited with the Authority in accordance with Regulation 20 of the Approved Inspectors Regulations,
On the first occasion on which those plans have been deposited.
• A regularisation charge, which is payable at the time of the application to the Authority in accordance with Regulation 21 of the Building Regulations.
You are advised that: -
• The sum of the plan charge and the inspection charge will be equal to the building notice charge.
• The reversion charge shall be equal to the building notice charge.
• The regularisation charge shall be 20% greater than the building notice charge.
• Any charge, except the regularisation charge, which is payable to the Authority shall be subject to value added tax at the standard rate.
2 • Where the charge is based on an estimated cost of work and the estimated cost is below £5,000 a separate inspection charge is not payable.
Where the charge is for the erection of a detached building which consists of a (2) garage or carport or both having a floor area not exceeding 40m² in total and intended to be used in common with an existing building, and which is not an exempt building the inspection charge is payable as a single stage payment at the time of plan deposit. Details of buildings, which are exempt, are contained within Schedule 2 of the Building Regulations.
Where an extension to a dwelling, the total floor area of which exceeds 60m², (3) including means of access and work in connection with that extension, the charge is based on the estimated cost of the work in accordance with Table C subject to the sum of the plan charge and the inspection charge or the building notice charge being not less than the net charge payable for category 5 in Table B (£536.71)
Where an extension or alteration to a dwelling consists of the provision of one or (4) more rooms in a roof space, the charge is based on the estimated cost of the work in accordance with Table C1 subject to the sum of the plan charge and the inspection charge or the building notice charge being not less than the charge payable for category 4 in Table B (£454.23).
Charges are not payable in respect of work, which is carried out for the benefit of a disabled person in accordance with Regulation 9 of the Building (Local Authority Charges) Regulations 1998 which states that:
(1) "A local authority is not authorised to fix by means of a scheme and recover a charge-
(a) Where they are satisfied that the whole of the building work in question consists of an alteration: and (b) Where the building work is-
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Report on Setting of Charges 09-10: App1Report | 20 pages | DownloadRead as text |
PDF |
Setting of Charges 2009/10:Report | 2 pages | Download |
Follow Lincs Building Consultancy Executive Board at East Lindsey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 27 Jun 2011 | Election of ChairmanRESOLVED That Councillor A. Wallace be elected Chairman of the Lincs Building Consultancy for the 2011/12 Council year. | Decided | Open |
| 27 Jun 2011 | Election of Vice-ChairmanRESOLVED That Councillor N.D. Cooper be elected as Vice-Chairman of the Lincs Building Consultancy for this Meeting o... | Decided | Open |
| 27 Jun 2011 | Director's End of Year Report 2010-11RESOLVED That the draft 2010/11 end of year financial report be approved and the annual return signed off by the Chai... | Approved | Open |
| 27 Jun 2011 | Financial Performance Monitoring ReportRESOLVED That the progress on the partnership be noted. | Noted | Open |
| 27 Jun 2011 | To consider proposed meeting dates for 2011/12It was agreed to circulate proposed Meeting dates for the 2011/12 Council year, following the Meeting. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.