Resolved
RESOLVED That the application be approved That the reasons for approval be brought to a future Meeting of the Planning Committee
Planning Committee approved this item on Thursday 19 April 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED That the application be approved That the reasons for approval be brought to a future Meeting of the Planning Committee
[14] Full Planning Permission
N/145/00231/ 12 APPLICANT: Mr & [name removed],
VALID: 13/02/2012 AGENT: Lincs Design Consultancy Ltd,
PROPOSAL: Planning Permission - Erection of 2.no detached dormer bungalows on site of existing village hall which is to be demolished,in accordance with amended information and plans received by the Local Planning Authority on 5th and 6th March 2012. LOCATION: SALTFLEETBY VILLAGE HALL, MAIN ROAD, SALTFLEETBY, LN11 7SN
1.0REASONS FOR COMMITTEE CONSIDERATION
1.1This planning application has been called to the Committee at the request of Cllr Mrs S. Harrison on the grounds that it is a brownfield site with an established entrance onto the B1200; it is in a sustainable part of the village where there is footway lighting, main sewerage, 400m from the village primary school and on a bus route and the applicants are the fourth generation of a village family, have four children who will attend the village primary school and therefore also add to the sustainability of the school.
2.0THE SITE AND SURROUNDINGS
2.1The site is situated in the medium sized village of Saltfleetby St. Peter. It is outside the settlement boundary which is some distance away to the south-west and is therefore defined as being in the open countryside in the East Lindsey Local Plan Alteration 1999. The site is within Flood Zone 3 – High Risk in an area with a Hazard Rating of Danger to Some where flood depths are expected to be between 0.25-0.5 metres.
2.2The site is within a small row of properties. There is a farm house with some outbuildings to the rear to the north-east side and a detached bungalow with rooms in the roof space to the south-west side. To the rear and opposite to the front are open fields. The area is characterised by sporadic residential properties along the main road. Further to the north-east is a primary school and public house and further to the south-west is the centre of the village with the new village hall and sports playing field, a small village shop and petrol filling station.
2.3Towards the front of the site is a timber building with a felt roof which was last used as a village hall. This use became redundant when the new village hall was built. There is a high hedge to the side north-east and rear south-east boundaries, 1.7 metre high close boarded wooden fence to the side south-west boundary and it is open to the front north-west boundary. To the front boundary is an open dyke with a bridge to the south-west side which provides access to the site.
3.0DESCRIPTION OF THE PROPOSAL
3.1The proposal is for planning permission for the demolition of the existing village hall building and the erection of two detached dormer bungalows each with an integral garage and four bedrooms.
3.2The single access would be slightly widened at the highway and would provide access to both properties with a shared drive to run in front of the two properties.
3.3The properties would be evenly space within the site with the driveway to the front and gardens to the rear. They would be raised 0.5 metres above the existing ground level with a slope up to the garage and steps to the front door. The dormer bungalows would have a front projection with a half hipped roof and open porch to the front door. The integral garage would be set back from this projection with a dormer window above the garage doors. To the ground floor there would be a kitchen/dining room to the rear with utility and boot room, to the front would be the lounge and in between a study/bedroom 4 and separate toilet. The first floor would have three bedrooms, one being en-suite, and a bathroom. Two roof lights are proposed to the en-suite and bathroom. The two properties would mirror each other with the garages to the middle.
3.4The suggested materials are red brick and concrete tile with gravel driveway. The existing landscaping would be retained and a hedge would be planted along the front and a mix of fencing and hedging is proposed to sperate the two plots.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
(14) N-145-00231-12Report | 9 pages | DownloadRead as text |
PDF |
N/145/00231/12:Report | 1 pages | Download |
Follow Planning Committee at East Lindsey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Sep 2026 | Tree Preservation Order: 137, Eastgate, Louth (105.36)That 137 Eastgate, Louth (105.36) Tree Preservation Order be confirmed (made permanent). | Decided | Open |
| 2 Sep 2026 | Tree Preservation Order: Land adjacent 116C Horncastle Road, Roughton Moor (215.31)That land adjacent to 116C Horncastle Road, Roughton Moor (215.31) Tree Preservation Order be confirmed (made permane... | Decided | Open |
| 2 Sep 2026 | 00489/26/fulThat the application be approved. | Approved | Open |
| 2 Jul 2026 | 03860/25/fulThat this Council resolve to grant planning permission with the application being referred to the Secretary of State ... | Decided | Open |
| 20 May 2026 | Election of ChairmanThat Councillor Stephen Eyre be elected Chairman of the Planning Committee for the Council year 2026/27. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.