RESOLVED That full planning permission be approved, subject to the following conditions: 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the following approved plans; Plan no: TH1 R eceived by the LPA on the 09/12/2016. Plan no: TH2 Received by the LPA on the 09/12/2016. Plan no: TH3 Received by the LPA on the 09/12/2016. Plan no: TH9 Received by the LPA on the 09/12/2016. Plan no: TH6 Received by the LPA on the 09/12/2016. Plan no: TH4a Received by the LPA on the 30/12/2016. Plan no: TH7 Received by the LPA on the 09/12/2016. Plan no: TH8 Received by the LPA on the 09/12/2016. Plan no: TH10 Received by the LPA on the 09/12/2016. Plan no: TH11 Received by the LPA on the 09/12/2016. Plan no: TH12 Received by the LPA on the 09/12/2016. 3. Before the commencement of the development hereby granted, full details of the proposed means of foul and surface water disposal to separate systems shall be submitted to and approved in writing by the Local Planning Authority and the details so approved shall be implemented in full before there are any flows into ... view the full minutes text for item 160.
Word for word from the decision East Lindsey published for this meeting.Source: democracy.e-lindsey.gov.uk
PROPOSAL: Planning Permission - Siting of 2no. glamping pods and 2no. arctic huts. and use of the land for siting of up to 10 touring caravans or 10 tents, or a combination of the two not exceeding 10 in total. LOCATION: THREE HORSESHOES, SHOE LANE, GOULCEBY, LOUTH, LN11 9WA
1.0REASONS FOR COMMITTEE CONSIDERATION
1.1The application has been referred to the Planning Committee by the Planning Team Leader due to the high level of public interest.
2.0THE SITE AND SURROUNDINGS
2.1The site lies on the edge of the village of Goulceby. The village and the site are within the Wolds Area of Outstanding Natural Beauty. The site is comprised of the Three Horseshoes public house and two parcels of land to the rear. The public house is located to the front of the site, with access to the rear along the southern side.
2.2The members of the Committee considered an initial application at the January Committee meeting and approved it. A further application is currently being considered at the site – N/060/00032/17, which proposes to convert and extend an existing building into 3 en-suite bedrooms.
2.3There is a marquee permanently erected to the rear of the public house with an internal link into it from the public house. Beyond the marquee to the west lies a grassed area which will contain the manager’s accommodation and the amenity block. This is currently used for touring caravans.
2.4Further to the west beyond the first field lies the second field, which is the location for the approved touring caravan and camping pitches. This second field is separated from the first, and the public house, by a mature hedge row.
3.0DESCRIPTION OF THE PROPOSAL
3.1The proposal seeks permission to site two ‘Arctic’ huts and two glamping pods within the field immediately to the rear of the public house. The proposal also includes using the field to site up to 10 caravans, tents, or a mixture of the two not exceeding 10 in total. This reflects the fact that the field already has an extant permission for this use. 4.0 CONSULTATION
4.1Set out below are the consultation responses that have been received on this application. These responses may be summarised and full copies are available for inspection separately. Some of the comments made may not constitute material planning considerations.
Publicity
4.2The application was advertised by way of a site notice, displayed at the junction to Shoe Lane. Where relevant, neighbouring properties sharing a common boundary were notified by letter.
Consultees
4.3ASTERBY AND GOULCEBY PARISH COUNCIL – No comments to make.
4.4LCC AND HIGHWAYS AS LEAD LOCAL FLOOD AUTHORITY – Advises that a surface water scheme is agreed. Advises that a banktop strip required.
4.5ENVIRONMENTAL SERVICES (Noise/Odour) - No comments to make.
4.6ENVIRONMENTAL SERVICES (Contamination) - No comments to make.
4.7ENVIRONMENTAL SERVICES (Drainage) - No comments received.
4.8ENVIRONMENT AGENCY – Objected initially but following discussion the objection was lifted subject to conditions being imposed.
4.9LINCOLNSHIRE COUNTY COUNCIL FOOTPATHS OFFICER – No objections raised providing requirements are met for keeping the line of the footpaths clear.
4.10WITHAM 3RD DRAINAGE BOARD – Details of surface water system should be agreed. Access to bank tops will be required.
4.11CARAVAN SITE LICENSING - No comments received.
4.12WOLDS COUNTRYSIDE SERVICE - No comments received.
Neighbours
4.13Comments are summarised below. Full comments are available on the file.
All addresses are in Goulceby unless otherwise stated. Object
Addresses:
i) Holly House, Watery Lane x2 letters/emails; ii) Cliff Lodge, Butt Lane; iii) 2x via email; iv) Wedgewood, Station Road; v) Which Way, Ford Way; vi) Asterby Cottage, Goulceby Lane; vii) 2x anonymous letter; viii) Aschum Lodge, Top Lane x2 letters; ix) Ford Way; x) Misperway, Butt Lane.
Summary of reasons:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.