Resolved
That a revised spending figure from the council’s Capital Reserves of 295K be approved to cover the cost of a replacement curtain and other fire protection measures and construction costs associated with this fire safety requirement.
Executive Board approved this item on Wednesday 15 January 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
That a revised spending figure from the council’s Capital Reserves of 295K be approved to cover the cost of a replacement curtain and other fire protection measures and construction costs associated with this fire safety requirement.
This report seeks to update Executive Board Members from a previous report on December 2019 regarding the need to review the current fire curtain provision at the Embassy Theatre, Skegness. The current fire curtain is 25 years old and is no longer fit for purpose. In July 2018 Lincolnshire Fire and Rescue undertook a mandatory safety audit in which the fire curtain was identified as having deficiencies which were sufficient to require its replacement.
In order to address these concerns a feasibility cost report from Lindum Construction has been commissioned through the SCAPE Framework.
That members approve a revised spending figure from the council’s Capital Reserves of 295K to cover the cost of a replacement curtain and other fire protection measures and construction costs associated with this fire safety requirement.
REASON: To ensure that this council continues to effectively discharge it responsibilities under the Regulatory Reform (Fire Safety) Order 2005.
This report has been prepared by:
Duncan Hollingworth - Tel: 01507 613558 - e-mail: [email protected]
This report was prepared after consultation with:
Lincolnshire Fire and Rescue Lindum Construction Magna Vitae
Cont. This report is number 3 in a series of 3
This report has been signed off by:
Neil Cucksey
This report is a key decision and is included in the Forward Plan.
LIST OF BACKGROUND PAPERS AS REQUIRED BY LAW
1. None
OTHER HELPFUL PAPERS
1. None
Local Government (Access to Information Act) 1985
Is the report Exempt – No
Please contact the person who has written this report or Neil Cucksey Tel. No. 613223 e-mail: neil.cucksey@e-lindsey, if you want more information about this report or the background papers.
1.0INTRODUCTION 1.1. Magna Vitae currently operate Embassy Theatre, Skegness. The venue is owned by East Lindsey District Council. The attraction provides a range of family entertainment that is popular with both residents and visitors to the district through the year.
1.2The current fire curtain in the auditorium at this location is 25 years old and is no longer fit for purpose. In July 2018 Lincolnshire Fire and Rescue undertook a mandatory safety audit in which the fire curtain was identified as having deficiencies which were sufficient to require its replacement. 1.3. It is vital that this project is undertaken and completed between January and March 2020. This coincides with Magna Vitae’s maintenance shutdown window.
2.0BACKGROUND 2.1. The Embassy Theatre Auditorium currently operates a fire safety curtain system which is classified within the Regulatory Reform (Fire Safety) Order 2005 as a ‘life safety system’ in order to prevent and control the spread of fire and smoke from the stage areas to aid emergency escape, protection of life and property.
2.2The Theatre’s Production Operations are managed by Magna Vitae who have over the years expanded their productions, thus meaning a larger stage area than originally designed has been utilised to fulfil the requirements of visiting theatrical productions.
2.3The current fire safety curtain and associated stage opening and floor area now no longer provides legally compliant compartmentation from fire spread/smoke travel, meaning the protection line falls short of the production set lines in most cases throughout the year.
2.4The Council has managed to provide temporary interim measures in the form of repairs to the curtain, enhanced fire safety measures with the Operator. This temporary arrangement has been approved by the officers from Lincolnshire Fire and Rescue only until January 2020 on the undertaking that remediation works will be undertaken to address the current concerns that date.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Embassy Fire Curtain 10 Jan 2020 UpdatedReport | 6 pages | DownloadRead as text |
Follow Executive Board at East Lindsey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Sep 2026 | East Lindsey Investment Fund Update ReportThat the un-committed spend of ELIF 1 in para 2.3 and for ELIF 2 in para 2.5 be noted. 2. That the proposed activitie... | Noted | Open |
| 23 Sep 2026 | Acceptance of Ministry of Housing, Communities and Local Government (MHCLG) Playground Fund GrantThat the signed Memorandum of Understanding between East Lindsey District Council and MHCLG for the Playground Fund b... | Noted | Open |
| 23 Sep 2026 | Vehicle parking improvements to the Waste Depot, Fairfield Industrial Estate, LouthThat the addition of £500,000 to the 2026/27 Capital Programme to fund the improvements to vehicle parking provision ... | Approved | Open |
| 23 Sep 2026 | 2026/27 Quarter 1 Finance Update1) That the General Fund forecast revenue outturn position for 2026/27 being an underspend of £56k as detailed in Tab... | Noted | Open |
| 23 Sep 2026 | Quarter 1 26/27 Performance and Risk ReportThat the performance and risk information contained within the report and appendices be noted. 2. That the risk appet... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.