RESOLVED that subject to:- (i) the applicant/owner first entering into a deed of variation to amend the planning obligation pursuant to Section 106 of the Town and Country Planning Act 1990 on terms drafted by the Solicitor to the Council to secure an operations management plan as per the previous application by 9 July 2013; and (ii) the conditions in the report, with amended wording that materials are to be agreed PLANNING PERMISSION be granted. Reasons for the decision: The development is acceptable taking into account the policies of the Development Plan as set out below. The proposal is not considered likely to result in any significant impact on the amenity of adjoining occupiers, the character of the area, or highway safety. There are no other material considerations that are judged to have sufficient weight to justify a refusal of the application, and where applicable conditions have been applied in order to satisfy these matters. The scheme is therefore judged to be in accordance with Section 38(6) of the Planning and Compulsory Purchase Act 2004 and thus planning permission should therefore be granted. Policies: Approved Fareham Borough Core Strategy: CS14 - Development Outside Settlements; CS17 - High Quality Design . Fareham Borough Local Plan Review: DG4 - Site Characteristics
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/13/0260/VC SARISBURY MR ANDY GODDARD AGENT: DANIELLS HARRISON VARIATION OF CONDITION 2 OF PLANNING REFERENCE P/11/0197/FP - ALTERATIONS TO THE CONTOUR OF LAND AROUND APPROVED BUILDING TO CREATE FREE STANDING STRUCTURE 256 BRIDGE ROAD - LAND TO THE REAR LOWER SWANWICK SOUTHAMPTON HANTS SO31 7FL
Report By Susannah Emery Ext 2412 Site Description The application site is located within the countyside at the far eastern end of Oslands Lane, Swanwick.
The site is surrounded on all sides by a significant border of trees. The contours generally fall from the north to the south side, with a valley crossing the site from north to south.
Description of Proposal The proposed lake and pavilion were permitted in 2011 to provide a diving training facility in association with and as an extension of the training services provided by Andark Diving at the Bridge Road premises.
A variation of condition 2 of P/11/0197/FP is now sought for a minor material amendment to alter the contours of the land around the pavilion building to create a free standing structure.
It was previously proposed that the pavilion would be constructed into the earth banking so as to be visible on the south side only. The applicant has suggested that it would be financially unviable to construct the retaining walls required to enclose the pavilion within the bank and that access is required to the rear of the building. The pavilion would have a 'green roof' to blend in with the surroundings.
Policies The following policies apply to this application:
Approved Fareham Borough Core Strategy CS14 - Development Outside Settlements CS17 - High Quality Design Fareham Borough Local Plan Review DG4 - Site Characteristics
Relevant Planning History The following planning history is relevant:
P/11/0197/FP PROPOSED DIVE TRAINING LAKE WITH ANCILLARY PAVILLION BUILDING AND LANDSCAPING. (as amended by email dated 02.09.2011) APPROVE 04/11/2011 P/09/0454/FP PROVISION OF DIVING TRAINING LAKE WITH ANCILLARY PAVILION BUILDING AND LANDSCAPING REFUSE 30/09/2009 Representations Two letters have been received raising the following objections; · We understand that one of the reasons planning permission was granted was largely due to the fact that burial of the building would not impact on the surrounding area · It was sold as an eco friendly development · The structure will impact on the surrounding area if it is not buried and spoil the outlook for residents · We fail to see why the applicant has only just discovered that access is required to the sides and rear of the building · If the project is financially unviable then this should have been resolved before development commenced · This changes the countryside area in which we live into something more resembling an industrial area · The grass roof is less likely to survive on a standalone building
Planning Considerations - Key Issues The pavilion building is being constructed on an area of the site which has been levelled and cut into the natural slope of the land. The earth bank to the rear curves around the building providing screening to the sides and rear. The earth bank would rise above the height of the roof of the pavilion and a screen of planting is proposed along the top of the bank. Construction of the pavillion and diving lake has commenced and the steel frame of the building is currently exposed as neither the contouring or landscaping of the site have been completed. Therefore whilst at present the site appears stark it is the intention to return it to a grassland meadow.
Officers are of the opinion that with the proposed grass roof system the building would not be prominent within the surrounding landscape or from the public footpath which runs along the northern site boundary. It is not considered that the proposal would be detrimental to the character of this countryside location.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.