CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Fareham Borough Council
Planning Committee, Tuesday 24 September 2013 at 2.30pm

P/13/0528/FP - Solar Farm South of Tanners Lane/West of Newgate Lane Fareham

Decided Planning 1 paper

Planning Committee decided this item on Tuesday 24 September 2013. Below is the council's own wording, with the papers it was decided on.

Item5(2)

Resolved

RESOLVED that, subject to the conditions in the report, PLANNING PERMISSION be granted.
Word for word from the decision Fareham published for this meeting. Source: moderngov.fareham.gov.uk

Follow this further

Built from Fareham's papers

What the report saysPro

Report to Planning Committee

P/13/0528/FP STUBBINGTON SUNSAVE 10 (FAREHAM) LTD AGENT: PARKER DANN LIMITED PHOTOVOLTAIC SOLAR FARM (INCORPORATING SOLAR PANEL ARRAYS & ASSOCIATED TRANSFORMERS & INVERTERS) WITH ASSOCIATED SECURITY FENCING, LANDSCAPING AND GRID CONNECTION (COMPRISING ONE TRANSFORMER BUILDING AND BURIED CABLE) LAND AT NEWLANDS FARM SOUTH OF TANNERS LANE/ WEST OF NEWGATE LANE FAREHAM HAMPSHIRE PO14 1AU

Report By Kim Hayler - Ext 2367 Site Description The application site comprises 27.04ha (66 acres) of arable farmland situated south of Tanners Lane and west of Newgate Lane, Fareham. Footpath number 68 runs along the route of Tanners Lane.

The site lies within the countryside and the Fareham/Stubbington Strategic Gap;

HMS Collingwood lies to the north and north east of the application site; the Peel Common Waste Water Treatment Works to the south; Newgate Lane to the east. To the west is a further area of arable farmland before reaching residential properties on Stroud Green Lane and Burnt House Lane. An electricity substation is situated on the south side of HMS Collingwood.

An easement would be retained along the electricity line which crosses the land, together with an easement along the line of a public sewer leading to the Wastewater Treatment works.

A statutory public footpath 74 runs through and adjacent to part of the southern boundary of the site with footpath 71b running adjacent to the east side of the Wastewater Treatment Works. There is also an informal footpath route down the western boundary of the site.

The nearest properties in Stroud Green Lane and Burnt House Lane would be sited between 650m and 700m from the western boundary of the application site. On the eastern, (Newgate Lane side) the nearest residential property would be sited approximately 40 metres from the site.

The land is predominantly flat with vegetation being confined to the boundaries with existing development. In places, at present, the boundary of the development site itself remains undefined as it runs across the otherwise arable land.

Description of Proposal The development of the site involves the construction of ground based arrays of photovoltaic panels for a period of 25 years. Each array would be 12.3m long by 3.3m wide and would be tilted, in relation to the ground at an angle of 15 degrees giving a maximum height of 1.7m. There would be 3649 arrays containing 87,576 modules in a 12 x 2 arrangement. The space between each array, that is the distance from the back of one array to the front of the next, will be 1.5 metres. The zones containing the arrays would be enclosed by 2.15m high security fencing of wire mesh topped by a single strand of barbed wire to prevent trespass. Native hedgerow would be planted outside of the security fencing.

Across the site 25 inverter and transformer cabinets would be erected. These would be sited in groups of two inverters and one transformer. The inverter cabinets would measure 3.18m (10'5") wide x 1.29m (4'2") long x 2.86m (9'4") high with the transformers being 3.2m (10'5") wide x 2.5m (8'2") long x 2.36 (7'8") high.

At the point of the electricity substation two structures are proposed to facilitate the connection to the national grid. These would measure (client building) 5.7m (18'8") wide x 2.7m (8'10") long x 2.6m (8'8") high and (Inverter/Transformer) 2.56m (8'4") wide x 6.96m (22'8") long x 3.45m (11'3") high.

Cables would be laid in trenches 400mm wide by 700mm deep.

The development would generate approximately 16.875MWp being sufficient to provide the annual electricity requirements of 5,200 households.

The whole site will be sown down to a grass and wildflower mix and grazed by appropriate farm animals to suit the conditions of the site.

Footpath 74 would be upgraded to a 6 metre wide avenue. Native hedgerows would be planted either side of the path screening the arrays and security fencing. Buffer strips would be maintained to the development along newgate Lane and around the boundaries of the Wastewater Treatment plant.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
P/13/0528/FP: Solar Farm South of Tanners Lane/West of Newgate Lane FarehamReport 1.1 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 11 attended
NW
Councillor Nick WalkerChairman, present
AM
Councillor Arthur MandryVice-Chairman, present
BB
Councillor Brian BayfordCommittee Member, apologies, sent representative
PD
Councillor Peter DaviesCommittee Member, apologies
KE
Councillor Keith EvansCommittee Member, present
MF
Councillor Michael Ford, JPCommittee Member, present
RP
Councillor Roger Price, JPCommittee Member, present
DS
Councillor David SwanbrowCommittee Member, present
KT
Councillor Katrina TrottCommittee Member, present
CH
Councillor Connie HockleyReserve, present as substitute
PB
Pam BuckinghamCommittee Officer, expected

More from Fareham Planning Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 12 August 2026 be confirmed and signed as a c... Decided Open
9 Sep 2026 Q/0559/26 - Land Between 75 & 77 Church Road Warsash Southampton SO31 9GDRESOLVED that Members delegate authority to the Head of Planning, in consultation with the Solicitor to the Council, ... Agreed Open
9 Sep 2026 P/26/0722/FP - Single Storey Side Extension at 44 Crispin Close Locks Heath SO31 6TDRESOLVED that: - (i) IT BE CONFIRMED that had the planning application for a side extension at 44 Crispin Close (as p... Decided Open
9 Sep 2026 P/26/0791/AD - Barchester Care Home Stubbington Lane Stubbington PO14 2NFRESOLVED that: - (i) Advertisement Consent for Five Years be GRANTED , subject to:- (a) the Conditions in the report;... Decided Open
12 Aug 2026 Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 15 July 2026 be confirmed and signed as a cor... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies