CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Fareham Borough Council
Planning Committee, Wednesday 9 October 2013 at 2.30pm

P/13/0691/FP - SWANWICK MARINA BRIDGE ROAD SWANWICK

Decided Planning 1 paper

Planning Committee decided this item on Wednesday 9 October 2013. Below is the council's own wording, with the papers it was decided on.

Item6(3)

Resolved

RESOLVED that, subject to the condition in the report, PLANNING PERMISSION be granted.
Word for word from the decision Fareham published for this meeting. Source: moderngov.fareham.gov.uk

Follow this further

Built from Fareham's papers

What the report saysPro

Report to Planning Committee

P/13/0691/FP SARISBURY PREMIER MARINAS LTD AGENT: HAMILL DAVIES LTD CONSTRUCTION OF NEW HOIST DOCK & LAUNCH PAD WITHIN THE CURTILAGE OF SWANWICK MARINA TO REPLACE EXISTING HOIST DOCKS, WITH MINOR MODIFICATIONS TO PONTOON LAYOUT SWANWICK MARINA BRIDGE ROAD SWANWICK SO31 1ZL

Report By Susannah Emery Ext 2412 Site Description The application site is within Swanwick Marina which is allocated as a boatyard on the proposals map of the Fareham Borough Local Plan.

The application site is in close proximity to the Lincegrove & Hackett Marshes Site of Special Scientific Interest (SSSI). This SSSI is part of the Solent & Southampton Water Special Protection Area (SPA)/ Ramsar/Solent Maritime Special Area of Conservation (SAC).

Description of Proposal Planning permission is sought for the construction of a new hoist dock and launch pad. Minor alterations are proposed to the current pontoon layout as a result.

Planning permission (P/07/0764/FP) was previously granted for the erection of a hoist dock in this location adjacent to the sheet piled river wall at the western end of the marina and alterations to the pontoon layout. The existing hoist docks are located at the eastern end of the marina and these would be decommissioned once the new dock became available for use. The relocated replacement facility forms part of the overall development of the Swanwick Marina site.

It is proposed that instead of constructing the dock within the curtilage of the land, as previously permitted, the dock would be situated within the water thereby reconfiguring the existing consented pontoon layout. The proposal would not increase the number of docks at the marina.

Policies The following policies apply to this application:

Approved Fareham Borough Core Strategy CS5 - Transport Strategy and Infrastructure CS17 - High Quality Design Fareham Borough Local Plan Review C18 - Protected Species E11 - Boatyards

Relevant Planning History The following planning history is relevant: P/07/0764/FP COMPREHENSIVE REDEVELOPMENT OF MARINA COMPRISING RETAIL, BAR, RESTAURANT, OFFICES, BOAT YARD COMPLEX TO COMPRISE WORKSHOPS, OFFICES AND STORAGE REVISED MARINA LAYOUT & 49 DWELLINGS PERMISSION 11/04/2008 Representations One letter has been received with the following comments;

· I wish to support the changes to the shoreside boat lift and its runways · I also support the long pontoon along the down river side of the sheet pile wall · I support the realignment of the projecting pontoon with the exception of the last 10 metres · This extra 10m reduces the available space for vessels to turn in what is the last reasonably sized place before the A27 bridge · Experience of boat owners who have moorings opposite shows that the existing space is not really adequate · The number of collisions with craft at this point is high · There is serious risk that a small craft would be crushed against the moored vessels opposite

Consultations Natural England - Natural England advises that if undertaken in strict accordance with the additional details submitted, in particular the Project Method Statement within the submitted piling method statement and risk assessment, the proposal is not likely to have a significant effect on the interest features of the SSSI/SAC/SPA/Ramsar sites, either alone or in combination with other plans or projects. Conditions should be imposed to ensure that the works are timed and undertaken in a suitable way to minimise disturbance to over wintering and nesting birds.

River Hamble Harbour Authority - the River Hamble Harbour Officers have assessed this proposal for its impact on ease and safety of navigation and on the environment of the Hamble Estuary. No objection is raised subject to conditions relating to piling methods and timing. The proposal will also require Harbour Works Consent from the Harbour Authority. This application is due to be determined on 27 September 2013.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
P/13/0691/FP: SWANWICK MARINA BRIDGE ROAD SWANWICKReport 258 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 12 attended
NW
Councillor Nick WalkerChairman, present
AM
Councillor Arthur MandryVice-Chairman, present
BB
Councillor Brian BayfordCommittee Member, present
PD
Councillor Peter DaviesCommittee Member, present
KE
Councillor Keith EvansCommittee Member, present
MF
Councillor Michael Ford, JPCommittee Member, apologies, sent representative
RP
Councillor Roger Price, JPCommittee Member, present
DS
Councillor David SwanbrowCommittee Member, present
KT
Councillor Katrina TrottCommittee Member, apologies, sent representative
TC
Councillor Trevor CartwrightReserve, present as substitute
JF
Councillor Jim ForrestReserve, present as substitute
PB
Pam BuckinghamCommittee Officer, expected

On this subject at Fareham

Search all
  1. P/13/0691/FP - SWANWICK MARINA BRIDGE ROAD SWANWICKThis decision
  2. Licensing Act 2003 - Application for premises licence at the Boat House Cafe, Swanwick Marina, Shore Road, Swanwick SO31 1ZLDecided
  3. P/14/0233/vc - swanwick marina swanwick shore bridge road southampton so31 1zlAgreed
  4. P/13/0882/fp - swanwick marina - premier marinas (hamble) ltd- bridge road swanwickApproved

More from Fareham Planning Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 12 August 2026 be confirmed and signed as a c... Decided Open
9 Sep 2026 Q/0559/26 - Land Between 75 & 77 Church Road Warsash Southampton SO31 9GDRESOLVED that Members delegate authority to the Head of Planning, in consultation with the Solicitor to the Council, ... Agreed Open
9 Sep 2026 P/26/0722/FP - Single Storey Side Extension at 44 Crispin Close Locks Heath SO31 6TDRESOLVED that: - (i) IT BE CONFIRMED that had the planning application for a side extension at 44 Crispin Close (as p... Decided Open
9 Sep 2026 P/26/0791/AD - Barchester Care Home Stubbington Lane Stubbington PO14 2NFRESOLVED that: - (i) Advertisement Consent for Five Years be GRANTED , subject to:- (a) the Conditions in the report;... Decided Open
12 Aug 2026 Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 15 July 2026 be confirmed and signed as a cor... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies