RESOLVED that subject to: (i). The conditions in the report; (ii). Imposing additional conditions to; (iii). Remove permitted development rights on plot 5 for extensions and outbuildings; (iv). Secure the retention of trees on the eastern side of the site shown as being retained on the tree protection plan; and (v). Requiring the submission of amended plans demonstrating greater visual interest in the first floor east elevations of plots 4 and 5 thorugh the incorporation of design features. PLANNING PERMISSION be granted.
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/15/0391/FP PARK GATE FAREHAM BOROUGH COUNCIL AGENT: WYG CONSTRUCTION OF FIVE NEW AFFORDABLE DWELLINGS TOGETHER WITH ASSOCIATED ACCESS, CAR PARKING AND LANDSCAPING 123 BRIDGE ROAD SARISBURY GREEN FAREHAM SO31 7HL
Report By Kim Hayler - Direct Dial 01329 824815 Site Description The site lies on the southern side of Bridge Road, 50 metres west of its junction with Coldeast Way.
The site currently forms part of the side and rear garden of 123 Bridge Road, a detached two storey dwelling.
The site is adjoined by residential properties in Coldeast Way to the east, Bridge Road and Woodthorpe Gardens to the west and open space to the south.
The application site is linear in its form. It measures around 130 metres (142 yards) in length, and varies from 40 metres (43 yards) in width at its southern end to around 12 metres (13 yards) in width where it abuts Bridge Road.
There are a number of trees within the site covered by a tree protection order (number 307).
The application site is wholly within the designated urban area.
Description of Proposal The proposed development is for the construction of five affordable two storey houses.
Of the five dwellings, three will be accommodated within a small terrace towards the centre of the site. Each of the units within the terrace will contain two bedrooms. The remaining two dwellings are both detached and each will contain three bedrooms.
Access to the site will be solely from Bridge Road to the east of number 123 Bridge Road.
Policies The following policies apply to this application:
Adopted Local Plan Part 2: Development Sites and Policies
Policy DSP1: Sustainable Development Policy DSP2: Environmental Impact Policy DSP3: Impact on Living Conditions Policy DSP13: Nature Conservation Policy DSP15: Recreational Disturbance on the Solent Special Protection Areas (SPA)
Approved Fareham Borough Core Strategy CS2 - Housing Provision CS17 - High Quality Design CS6 - The Development Strategy CS9 - Development in Western Wards and Whiteley CS15 - Sustainable Development and Climate Change CS16 - Natural Resources and Renewable Energy CS17 - High Quality Design
Representations Nine letters have been received from eight households objecting on the following grounds:
- Objection to Plot 5 (southernmost) on grounds of loss of privacy and outlook - Loss of trees - more could be retained including T21 (horse chestnut) - Impact upon wildlife and protected species - Impact of additional traffic on to Bridge Road (particularly turning right with traffic lights to Coldeast Way) together with contractors vehicles if permission is granted - Inadequate parking for family homes - Loss of privacy - Increased noise and disturbance from use of gardens - Land should be used as another access to Coldeast development as originally planned - Plot 5 should be moved further from eastern boundary - Elderly persons development would be more suitable - Grey materials do not match the surroundings - Solar panels should be shown as this may cause glare - 2.25m high secure fencing should be extended along boundaries with properties on Coldeast Way - Designs are not high quality and are out of keeping with the area - Some concerns might be overcome by reducing the development to single storey - Narrow first floor window on north elevation of Plot 1 is unnecessary - Boundary to 125 Bridge Road should be a wall not a fence - How will pedestrian safety be maintained on the 90m driveway?
One letter of support has been received provided that screen fencing is erected along the boundary with 1a Coldeast Way.
Consultations Director of Planning and Development (Highways) - No objection subject to conditions.
Director of Planning and Development (Arboriculture) - No objections subject to the Arboricultural Impact Appraisal and Method Statement prepared by Barrell Tree Consultancy - Ref 14083-AIAAS 10 December 2014.
Director of Planning and Development (Ecology) - No objection subject to the submission of a dormice strategy.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.