RESOLVED that, subject to the following:- 1) That the bypass will not be lit other than at junctions; 2) Measures are put in place to ensure that the bypass will not increase surface water flooding problems to neighbouring land and land in Stubbington ; and 3) That the Stubbington Residents and Borough Council are fully consulted and appraised on any traffic calming measures to be implemented in the village; And the imposition of suitably worded planning conditions as per the main agenda and update paper, SUPPORT be given for the planning application.
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/15/0718/CC STUBBINGTON HAMPSHIRE COUNTY COUNCIL AGENT: HAMPSHIRE COUNTY COUNCIL CONSTRUCTION OF A BYPASS FOR STUBBINGTON, PROVIDING A CONNECTION FROM TITCHFIELD ROAD TO GOSPORT ROAD TOGETHER WITH ASSOCIATED IMPROVEMENTS/ENABLING WORKS TO TITCHFIELD ROAD, AND GOSPORT ROAD AND NEW/IMPROVED JUNCTIONS AT TITCHFIELD GYRATORY, BRIDGE STREET, PEEL COMMON ROUNDABOUT & PEAK LANE AT TITCHFIELD ROAD/GOSPORT ROAD, STUBBINGTON HAMPSHIRE STUBBINGTON BY PASS STUBBINGTON HAMPSHIRE
Report By Mark Wyatt - 01329 824704 Introduction This item is a consultation from Hampshire County (HCC) on the proposed Stubbington Bypass.
The views of Fareham Borough Council are being sought as the Local Planning Authority, with HCC being the actual determining body.
Site Description The application site is broadly a sweeping "S" shape extending south from the Titchfield gyratory junction through arable farmland around the north and eastern sides of Stubbington and the southern edge of Fareham before joining Gosport Road and then extending east to the Peel Common Roundabout.
In terms of geographical context, the land to the north of the proposed bypass route is, in part, that of the Newlands Farm application site (P/14/0222/OA refers). This application remains undetermined at the current time. Description of Proposal The application proposes a new 3.5km (2.3 miles) long road to the south of Fareham and to the north and east of Stubbington through an area of predominantly arable farmland. The proposed road will be a 7.3m wide single carriageway road with a 2.5m wide shared footway/cycleway and verges. The submission indicates that the bypass would take approximately three years to construct. The total corridor width will be approximately 20m to 25m, and the road has a design speed of 50mph. The submitted plans show the following elements of the scheme:
1) The A27/B3334 Titchfield Gyratory will be redesigned to provide a new right turn, signalised junction from the A27 eastbound into the B3334 Titchfield Road. This right hand turn lane will head south through the centre of the existing gyratory. Two lanes are to be provided for southbound traffic and a third lane for turning movements back towards the A27, Titchfield Hill.
2) The B3334 Titchfield Road is to be widened to provide two lanes in each direction with a new southbound carriageway constructed to the east of the existing road. Construction of the new southbound carriageway would require cutting into the higher ground to the east of Titchfield, with appropriate remedial measures necessary to mitigate the visual impact of the new cutting. This four lane section of the road will continue to the signalised junction with Bridge Street, which is also to be improved with crossing facilities being included in the junction upgrade. South of the junction with Bridge Street the lanes merge down to single carriageway.
3) A new traffic signal controlled junction will be constructed opposite the nursery glasshouses on Titchfield Road. The junction will include a new T junction for Titchfield Road traffic with the alignment of the new bypass diverging from Titchfield Road at this point heading east.
4) The bypass continues east as a 7.3m wide single carriageway road with a shared foot/cycleway at 2.5m wide on the northern side of the road.
5) An uncontrolled crossing with an island refuge is to be provided where the bypass crosses Ranvilles Lane. The crossing is also designed to allow for equine crossing. Ranvilles Lane is currently closed to through traffic and the application sets out that this will remain to be the case with the dwellings located on the northern section of the Lane continuing to use the existing access points to the north. Access from the bypass is to be provided only to the land north of the bypass via Ranvilles Lane and there is to be no access to the southern section of the Lane from the bypass.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.