Resolved
It was AGREED that the content of the report be noted.
Streetscene Policy Development and Review Panel agreed this item on Thursday 22 October 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
It was AGREED that the content of the report be noted.
The purpose of this report is to provide a summary of the performance of the Council’s Grounds Maintenance Service over the last year.
That the Panel notes the content of this report. INTRODUCTION
1. The Grounds Maintenance Service plays a key role in delivering the Council’s Vision of a safe and attractive place to live and work. The service forms part of the larger Operations Service within the Department of Streetscene and operates from the Council’s depot at Broadcut, Wallington.
2. The majority of the service is not a statutory obligation for the Council with the exception of the burial service operation. The key operations undertaken by the service are as follows:
Grass cutting
Shrub and rose border maintenance
Hedge cutting
Floral display maintenance
Winter and summer sports pitch preparation and maintenance
Play area inspection, repair and maintenance
Burial service
FINANCIAL INFORMATION
3. The service operates on an annual revenue budget of £1,262,400 as detailed below:
Employees £757,800
Transport £206,000
Supplies and services £173,400
Internal recharges £92,600
Depreciation £32,600
4. Hampshire County Council, under an agency agreement, contributes £164,500 for the maintenance of the Highway grass verges, shrub borders and hedgerows.
SERVICE OPERATION
5. The service is managed by the Operations Manager, assisted by the Grounds Maintenance Supervisor. The operational team consists of 27 full time employees, 1 apprentice gardener and 5 seasonal grass cutting operatives. During periods of peak demand a small number of temporary labour operatives are employed through local recruitment agencies.
6. The team operate a 37 hour week Monday to Thursday 8am – 4pm with a 3.30pm finish on Fridays. Occasional overtime is required to meet service demands and play inspections are currently carried out across 6 days per week Monday through to Saturday. GRASS CUTTING
7. The service is responsible for cutting over 2.5 million square metres of grass, most of which is cut every two to three weeks. The work is seasonal, commencing in early March through to early November.
8. The Highway verges, small open spaces and areas of grass located around general housing estates are cut approximately every two to three weeks depending on weather and ground conditions. Follow up strimming of banks and clusters of obstacles is undertaken monthly. The remaining isolated obstacles and wall lines are controlled by an annual herbicide application and occasional ad-hoc strimming.
9. Parks and large open spaces are cut a minimum of two occasions per month, or as conditions allow. Winter sports pitches are cut as required to maintain a playable surface.
10. Grass at the Council’s cemeteries and sheltered housing schemes is cut a minimum of two occasions per month or as conditions allow. Due to the sensitive nature and high profile of these sites obstacles are strimmed during each maintenance visit and at times of peak growth the grass is sometimes collected to ensure these areas remain safe and attractive.
11. The Council operates an assisted garden scheme for approximately 200 elderly and disabled tenants. This scheme, that is free to qualifying residents, provides a monthly grass cutting service from March to October for residents who occupy Council properties and are unable to manage their gardens.
SHRUB AND ROSE BORDERS
12. The service maintains over 47,000 square metres of shrub and rose borders on Fareham Borough Council and Hampshire Highway land. Most sites receive two maintenance visits per annum with the main visit undertaken during the winter months of November through to February. This visit includes weed control and formative pruning. A second visit is carried out during the summer months to control vegetation encroaching onto footpaths and roads.
HEDGE MAINTENANCE
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Annual Report on Grounds Maintenance PerformanceReport | 112 KB | DownloadRead as text |
Follow Streetscene Policy Development and Review Panel at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 6 Sep 2018 | Discussion on Issues Emerging from Depot TourIt was AGREED that the Head of Streetscene pass on the Panel’s thanks to the Streetscene team who took part in the tour. | Agreed | Open |
| 6 Sep 2018 | Review of Work Programme 2018/19It was AGREED that the work programme for 2018/19 be confirmed. | Agreed | Open |
| 6 Sep 2018 | Review of Textiles RecyclingIt was AGREED that the content of the report be noted. | Agreed | Open |
| 6 Sep 2018 | Exclusion of Press and PublicIt was AGREED that in accordance with Section 100 A( 4) of the Local Government Act 1972, the public and representati... | Agreed | Open |
| 12 Jul 2018 | Review of RecyclingIt was AGREED that the Panel note the content of the report. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.